<?xml version="1.0" encoding="utf-8"?><iati-activities version="2.03" generated-datetime="2026-09-01T11:21:18"><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-100086</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Support to South Africa on the local production of an HIV/Aids vaccine and active pharmaceutical ingredients (API)</narrative></title><description type="1"><narrative> The project forms part of the M &lt;(&gt;&amp;&lt;)&gt;E component of an ongoing bilateral TC project between Italy and South Africa that supports the latter#s efforts to combat the HIV/Aids challenge with advisory and capacity-building assistance in three areas: (1) Strengthening of a network of clinical sites and laboratories at provincial level, particularly in the HIV/AIDS sector; (2) Support the setup of a GMP line of production to manufacture vaccines in South Africa; and (3) Development and conduct of a Phase II therapeutic clinical trial with the Tat vaccine developed by Italy#s National Institute for Health (ISS). Fundamentally, UNIDO was entrusted with managing an International Scientific Advisory Committee (ISAC) tasked to carry out a full-fledged evaluation of the Italy/South Africa project. In addition, following an overhaul of the originally agreed work plan, UNIDO#s specific contribution formally agreed in mid-2014 relates to three activity clusters, i.e. (1) training program for MCC staff on the review of medicines regulatory submissions; (2) capacity-building for The Biovac Institute; and (3) conduct of a multi-stakeholder dialogue meeting to bridge training offers of higher educational institutions [HEI] with skills acquisition needs of pharmaceutical manufacturers.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-100086"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>ITALY</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2012-01-12"/><activity-date type="3" iso-date="2016-10-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Pretoria</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-25.74486 28.18783</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">26094.49</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">289821.18</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">601589.61</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">75909.37</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">2417.83</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-2117.20</value></budget><transaction ref="100086-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0.14</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">5.10</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">883.32</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-888.42</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-81.20</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">610.69</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">3978.78</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">25717.73</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-3978.78</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">37.13</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">157543.29</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-122336.17</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">1.43</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-22648.54</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">173.03</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">8.04</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">14342.26</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">27.07</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">293.67</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-35034.48</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-31.21</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">35034.48</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-44.58</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-44.63</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">-77.49</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">674.23</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">260654.89</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-112.13</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">877.92</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">1729.28</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">365517.24</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-6114.02</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">671.35</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">3337.22</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-36494.39</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-100.61</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-681.39</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">14.83</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-200.03</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-8.81</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">4326.68</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-19.64</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-16912.30</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-62.64</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">213.57</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">147823.58</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">2.07</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">62.65</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">39.12</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">10792.35</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0.00</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">2828.14</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">24787.16</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">2439.02</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">90837.47</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">58540.68</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">230487.81</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">52714.88</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">11680.95</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">83879.20</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">1231.70</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">8367.92</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">1676.61</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">6886.65</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">1892.55</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">2765.16</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">81541.57</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0.00</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">351.28</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0.00</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">5294.78</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">15309.59</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">27.75</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">10485.34</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-1540.89</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-8853.09</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-102.62</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-212.54</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-734.92</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-206.79</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-388.10</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-1660.07</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-37.47</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-157.43</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">6593.06</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-3.79</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-5.49</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-13.50</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-14.51</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">13874.41</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">631.51</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0.00</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">625.64</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">2821.44</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-197.52</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">3334.02</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0.00</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">262.23</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0.59</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">13970.02</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-0.59</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">2885.57</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-122.84</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-277.55</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0.00</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">2333.82</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">32980.94</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">343.74</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0.00</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">711.97</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">143.12</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">55.25</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">287.37</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-155.89</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.43</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-0.71</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">19526.63</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">-17841.58</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">-0.14</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">434.90</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.01</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-343.77</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-18.46</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> O1.1 Contributions made to M&amp;E activitie</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-3260.37</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-1943.10</value><description><narrative> O2.1 Tailored Training Programmes</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">10.79</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="100086-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Project Operation</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-102039</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>AUTOMOTIVE COMPONENT SUPPLIER DEVELOPMENT PROGRAM</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-102039"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SOUTH AFRICA</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2011-10-26"/><activity-date type="3" iso-date="2014-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">-40979.04</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">119685.64</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">271.13</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">92.57</value></budget><transaction ref="102039-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">22977.26</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">8225.97</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">7875.01</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-444.32</value><description><narrative> SESAF09003</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> SESAF09003</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-22620.32</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-3082.63</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">370.74</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">57235.57</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">10599.17</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">566407.67</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-170295.54</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-7718.99</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-7740.31</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">3074.53</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-623735.36</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0.00</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">7813.53</value><description><narrative> Cancelled</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Cancelled</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">7737.89</value><description><narrative> Cancelled</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Cancelled</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-1899.48</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-287171.91</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">114.67</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-10376.72</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">17195.25</value><description><narrative> SESAF09003</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> SESAF09003</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">409698.94</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">128465.08</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-15.25</value><description><narrative> Cancelled</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> Cancelled</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">570.57</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-18.90</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0.00</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-129310.52</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">29.99</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-47.66</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">5.96</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-639.30</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">7.13</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-83.94</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-2239.66</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-3806.07</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-58.77</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-22815.53</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-448.39</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-248.97</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-24967.71</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-306.91</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">6.82</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-14.36</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">2993.37</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">41.47</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-302.43</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 2.1 Key stakeholders participate in STC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">96370.54</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">40533.85</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-1839.41</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> SESAF09A03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-132765.43</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-41.27</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">-27525.25</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-8275.86</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-398.54</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">8275.86</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">39801.06</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">13580.04</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">51.98</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">89.77</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">13178.48</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">65734.56</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">748.20</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-586.67</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-980.30</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">1266.94</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">3974.99</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-5139.28</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-120.60</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">3872.35</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-601.51</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">3102.22</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">428.70</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">177.40</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-80.76</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">29.70</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-19.27</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-336.68</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-291.79</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">18.49</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-198.00</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0.00</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">223.05</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0.00</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-2759.89</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-536.46</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0.02</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0.05</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0.36</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">1.17</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">2.09</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.04</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-815.05</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-3912.09</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-282.98</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-1593.55</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.89</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">3.18</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-24.09</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 2.2 Policy recommendations elaborated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-1982.65</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 1.2 Tirisano Programme sustainability</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-198.84</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102039-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> SESAF09B03</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-102054</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>TRAINING OF TRAINERS FOR THE PROMOTION OF EMERGING AGRO-PROCESSING CLUSTERS IN SOUTH AFRICA</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-102054"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SOUTH AFRICA</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2011-10-25"/><activity-date type="3" iso-date="2011-10-25"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">-8869.64</value></budget><transaction ref="102054-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-6086.51</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">6086.51</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">152.95</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-27.06</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-5026.15</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-3816.43</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-3843.49</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 1.1 SAAA staff and experts capacitated</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-5026.15</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102054-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> SFSAF10001</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-102073</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Supplier Benchmarking and match-making Programme in South Africa</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-102073"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SOUTH AFRICA</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2010-09-23"/><activity-date type="3" iso-date="2013-09-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">318598.04</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">-77950.96</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">-897.86</value></budget><transaction ref="102073-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">28647.21</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">43604.61</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">2.69</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">2438.78</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-164.93</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">14600.62</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">3874.02</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">3445.50</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">43122.26</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-46996.29</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">3079.37</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">55821.98</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">36469.40</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">29283.67</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-2153.11</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-10506.15</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">8121.86</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0.00</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">25612.16</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0.00</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-865.81</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-3583.49</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">6840.25</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-5.48</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">2100.00</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">3588.96</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">75758.07</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0.00</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">9186.72</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-14326.43</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">2550.85</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">4860.23</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">8789.60</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-41.71</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">2030.95</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">4744.20</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">-1511.44</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-16639.23</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-185.69</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-1167.01</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">231.30</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-2100.00</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-810.00</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-2889.06</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-17.98</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-782.85</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">1383.54</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-2384.13</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">148.97</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">2.37</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">18537.76</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-76.70</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">11015.77</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-198.83</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-29669.62</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-51336.48</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-6.13</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-15.89</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-14304.65</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">1310.20</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">26.20</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">-177.05</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-299370.92</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-762.37</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">98562.50</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 2.1 Supplier Benchmarking Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">12552.48</value><description><narrative> 2.2 Supplier Capacity Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 2.2 Supplier Capacity Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-11939.33</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">322.91</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">52627.74</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 2.3 Necessary support for Suppliers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">4614.71</value><description><narrative> 3.2 Buyer / Supplier Matchmaking</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 3.2 Buyer / Supplier Matchmaking</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-15.72</value><description><narrative> Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-253.93</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-191.56</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">234.14</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-2477.32</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">49.59</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-483.11</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-204.68</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-0.01</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-747.73</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0.01</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">41.72</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-27.82</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-3173.53</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.2 Local &amp; Global Knowledge / Bus. Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">460.89</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="102073-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.1 SPX Centres/Database/Business plan</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-103060</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Greening the COP 17 in Durban</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-103060"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2011-07-01"/><activity-date type="3" iso-date="2014-05-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">30808.31</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">-8980.63</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">-1324.76</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">0.01</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">-562.72</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-423.36</value></budget><transaction ref="103060-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">30228.45</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0.00</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-397.37</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0.00</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">190.44</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0.49</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-0.49</value><description><narrative> to be deleted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> to be deleted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">1330.82</value><description><narrative> 4.1 Installation of SWH is schools</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 4.1 Installation of SWH is schools</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">28898.12</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">119.52</value><description><narrative> 1.3 Environment Volunteers hired</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 1.3 Environment Volunteers hired</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-29017.64</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-1330.82</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-90.26</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">82.01</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-64.65</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0.00</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">64.65</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-33473.05</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">17742.64</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-1167.50</value><description><narrative> 4.1 Installation of SWH is schools</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 4.1 Installation of SWH is schools</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-4700.00</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-7306.49</value><description><narrative> 3.1 Sensitization of the COP pa 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 3.1 Sensitization of the COP pa 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-12.20</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-5476.06</value><description><narrative> 2.1 Platform for promoting low  103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 2.1 Platform for promoting low  103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-13306.53</value><description><narrative> 1.1 Green passport designed and distribu</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 1.1 Green passport designed and distribu</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-27906.51</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">15510.93</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">628.25</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-35.18</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">188.79</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0.00</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">26.00</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-356.86</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-17925.69</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">1673.78</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">3204.51</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">29900.25</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">600.00</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">4545.92</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-3804.51</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">111.90</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">3835.09</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-173.09</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">138.10</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0.00</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-1654.45</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-138.10</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-498.82</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0.00</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">1833.44</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">4746.12</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">2629.61</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">881.94</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">3.92</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-38.55</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">228.72</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-6476.65</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-602.88</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-752.50</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-17.27</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-0.01</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-385.10</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-550.00</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-1422.92</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-10530.20</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0.28</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-37.32</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-16.38</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-29.55</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-217.99</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">259.19</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-1246.08</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-300.00</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">76.20</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">29.55</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">120.30</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0.01</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-691.17</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">128.43</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0.02</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">-402.86</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">-20.50</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-13961.32</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> GFSAF11B04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-4458.09</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> GFSAF11A04</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-550.00</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 3.2 Faciliated operationalizati 103060</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-2078.15</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103060-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> GFSAF11004</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-103097</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Industrial Energy Efficiency Improvement in South Africa</narrative></title><description type="1"><narrative> Objective: The overall objective of the project is to form an integral part of South African national efforts to successfully implement the National Energy Efficiency Strategy and the National Industrial Policy Framework. Therefore, the project is aiming to make key contributions to the achievement of the Government#s broad approach to industrialization and the Government#s commitment to tackle climate change. The project strategy for achieving the above the #Overall Objective# and #Development Goal# is the introduction and promotion of Energy Management Systems (EnMS) and Energy Systems Optimization (ESO) in conjunction with the introduction of Energy Management Standard ISO 50001, while fostering a suitable and supporting policy and institutional environment..</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-103097"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SOUTH AFRICA</narrative></participating-org><participating-org role="1"><narrative>SWITZERLAND</narrative></participating-org><participating-org role="1"><narrative>UNITED KINGDOM</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2010-04-01"/><activity-date type="3" iso-date="2016-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">754814.36</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">1315413.31</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">391832.29</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">28289.22</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">-58993.67</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-20816.70</value></budget><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">6888.70</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">6888.70</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">6909.39</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">7669.20</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">4458.50</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">29134.50</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">27524.02</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">15947.18</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">1071.25</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">171.21</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">5.33</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">6.73</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0.00</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-206.03</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-563.71</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">5.32</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">154.43</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">5.33</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0.16</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">3187.54</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">19893.90</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">6631.30</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-12216.66</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">10256.62</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">13262.60</value><description><narrative> 1.4 NCCRS Input and Harmonization</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 1.4 NCCRS Input and Harmonization</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">63660.48</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-103.64</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">33156.50</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">1750.32</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">39787.80</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">10777.15</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-364.06</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">28.79</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">86417.50</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">16549.46</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">1853.40</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">20817.52</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-364.06</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">13794.75</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-282.44</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">19893.90</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">120186.56</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0.00</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">38461.54</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-119970.52</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0.00</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">166287.25</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">31688.37</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">10580.74</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-66.49</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-282.44</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">22045.23</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-19920.42</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">11936.34</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">14588.86</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">2538.91</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">2906.78</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">46602.06</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">13949.30</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">20394.92</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">7215.38</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-3719.89</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">12987.50</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-75.10</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-480.20</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">22704.67</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">12673.19</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">9309.99</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">219.70</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">7069.86</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">30.25</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">68414.60</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">289.76</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">152.43</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-9421.97</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">11.32</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-637.73</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-1726.68</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">16472.91</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-4771.37</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">34080.08</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">12455.10</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-33791.93</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-4424.95</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">243.39</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-2091.14</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-9041.88</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-7668.33</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-0.01</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-7623.63</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-75574.91</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">8491.41</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">12.97</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">136.81</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">12.97</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-7140.02</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">44140.20</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-3.92</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">4979.72</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">11.32</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">4979.72</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-36463.91</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">65403.81</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">2490.11</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-14907.16</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">61.23</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-194.30</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-6631.30</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-3949.44</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">33.16</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-13262.60</value><description><narrative> 1.4 NCCRS Input and Harmonization</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 1.4 NCCRS Input and Harmonization</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-13262.60</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">226.73</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">84338.30</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">10924.02</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-13262.60</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">74719.22</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">323.22</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-9249.22</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">2936.50</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-69859.42</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">114.72</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">57.33</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">112239.13</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">78271.45</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">6165.33</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-15915.12</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">219.70</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-13262.60</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-13262.60</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">2121.13</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">129.14</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">26525.20</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">94285.86</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">463775.93</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">-1814.20</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">349.09</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">53662.24</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">3208.14</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">47.33</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">-3721.49</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">19240.15</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">17833.69</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">1955.00</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-11936.34</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-867.98</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-4155.12</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0.00</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-509.88</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-113.23</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-2371.10</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-418.79</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-300.12</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-112.21</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-867.98</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-4510.89</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">146.26</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-1111.46</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">153.86</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">1912.68</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">91.83</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">2998.56</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">19775.43</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">26651.91</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-722.00</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">50091.81</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">5.24</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">44.89</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-2772.54</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">59.85</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-4751.43</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">795.76</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">12.72</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">265.25</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">3147.48</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-4819.59</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">1530.05</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">37242.37</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">265.25</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-108.95</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-17889.48</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">265.25</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">225.06</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">5022.05</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">8.18</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">12.72</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">1061.01</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0.01</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">795.76</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">60.96</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">131.96</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">75.93</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">122.34</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">85.84</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">31.88</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">3537.84</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">55387.53</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">5432.47</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">51448.09</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">108.09</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-371.34</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">518.51</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">4.48</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">30.30</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-1.03</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">3306.60</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">36.69</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">1471.23</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-64.47</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">-283.78</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-45.62</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">1226.67</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-455.53</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">1281.61</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">45.62</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0.00</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">21193.06</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">3671.11</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">26737.48</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-154.42</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-1630.75</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-40.73</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">5751.77</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">27586.21</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">34482.76</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">13793.10</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-1425.41</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">13793.10</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">81451.05</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">28015.23</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">41379.31</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">165517.24</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">27312.01</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">72418.72</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">37159.17</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-114.51</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">2130.21</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">45851.32</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">27028.65</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">27586.20</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-565.48</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-3001.92</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">47820.14</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">2691.22</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">48438.72</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">2125.57</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">23.18</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">1830.92</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">452.47</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">-18708.78</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">21488.98</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">-6380.55</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">242.07</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">46.62</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">11086.95</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0.01</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">-1716.56</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">-172.76</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">4338.10</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0.00</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">6149.48</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">2130.73</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">-22.93</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">1538.14</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-79.01</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-1538.87</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-335.25</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">21989.82</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">12.20</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-7.98</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0.00</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">1864.82</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0.00</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">24727.55</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-0.55</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">69743.00</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">2385.90</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">12368.99</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">9238.01</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-287.48</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">121886.34</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-195.95</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">7367.18</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">9233.62</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">1580.71</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-252.63</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">783.79</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">905.11</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">1384.20</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">1646.90</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-0.05</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-30666.53</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-84.63</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">13506.01</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-9275.96</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">1112.69</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">24520.66</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-719.85</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">61301.66</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-1523.79</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 2.2 National Energy Management Standard</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">885.65</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">98950.93</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-5226.20</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">11141.48</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-787.79</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 4.1 Programme of SME Energy Auditing</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-4975.06</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">2368.63</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-156.57</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">15424.10</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">24520.66</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-20358.88</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">27109.14</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-63454.59</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">30020.92</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-18965.52</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-2433.62</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">4080.39</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">36023.82</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-1110.78</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">13471.80</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">26956.17</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-13.24</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-49.86</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-6560.54</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-27586.21</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">10297.60</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-1031.72</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">16721.51</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">3850.69</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-8609.31</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">8799.63</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-13793.10</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">2539.70</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">401.01</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-13720.09</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-56206.58</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">7231.41</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-13793.10</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 2.4 Publicity and Promotional Events</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">2750.52</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">881.40</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-4607.07</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">12530.85</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">70918.95</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">45390.86</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">9913.26</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">12391.57</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">21685.25</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">138.02</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">61957.86</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">66.16</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-157.31</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">22443.50</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">111.84</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">34438.31</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">22244.14</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">3097.89</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-396.81</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">26184.67</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">2591.75</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">135338.86</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">148862.12</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">18635.30</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">26184.67</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">14.99</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">54213.14</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">51668.58</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">23404.84</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">12391.57</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">121.82</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">57864.38</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">12753.98</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-1803.94</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-2308.29</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-705.03</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-465.59</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">4542.18</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">313.75</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-758.94</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-25.95</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">226.54</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">45894.83</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-967.39</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">39329.15</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-843.33</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-8810.49</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">3234.62</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-110.85</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-399.50</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">6751.79</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-2526.39</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">9617.95</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-1212.11</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-17.52</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-1359.61</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">13662.40</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-2590.34</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">2498.75</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-264.04</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">182.31</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">609.85</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-400.16</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-4817.99</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-234.53</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">9003.10</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-74.94</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">57463.53</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-517.53</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">3144.15</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">1985.80</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-205.64</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">4179.08</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">242.98</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">464.85</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">15.43</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">30.59</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">1258.39</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">15852.96</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-530.95</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-5.43</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-1756.97</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-0.01</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">728.83</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0.00</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">1379.06</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0.00</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-3269.78</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">6229.22</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">9662.20</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-452.38</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">2097.49</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-196.41</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-18.32</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-419.16</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-60.97</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">1580.27</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-2187.07</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-707.08</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">572.09</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-6732.36</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-498.31</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-1466.73</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">8.06</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">404.05</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">8587.25</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">1374.68</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-3.61</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">2834.69</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">1111.53</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-349.02</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">928.15</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-734.47</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">1226.34</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-88.05</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-17100.00</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-95.19</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">34169.13</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">427.14</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-10202.58</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0.04</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-20354.70</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-718.52</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-18030.68</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">5416.99</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-1560.36</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">6097.56</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-52.16</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">1134.74</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">36585.37</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-11387.66</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">2148.83</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">7183.95</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">3756.92</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-6097.56</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">4192.17</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-258.16</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-133.68</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-1834.04</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-400.98</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-609.76</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">13501.33</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-3048.78</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 7.4 SARO Logistical Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">7997.17</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">320.45</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-3181.58</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-24.30</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-493.59</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-443.76</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">25366.30</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-916.42</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-135.98</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">1651.72</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-352.79</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-32.39</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">556.92</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">2189.95</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">213.44</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">3132.49</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">14.26</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">4088.07</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-22.75</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-10.66</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">318.41</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">689.09</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-103.87</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">16274.23</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-389.98</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0.00</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">4392.84</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">4742.27</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">1099.96</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">47.21</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-46.94</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">153.45</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-180.66</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">2501.10</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-221.61</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">6097.56</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">18.94</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">10751.41</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">3537.01</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-4274.63</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-14.84</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-9.78</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-56.64</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-11268.29</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-4516.60</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-7.65</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">37356.01</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-292.43</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">5531.17</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">10352.18</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">304.88</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-649.54</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">1521.09</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">-3.91</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">39566.04</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">2296.97</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">35867.93</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">-24.02</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">-145.15</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">818.80</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-15364.68</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-3527.97</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-80868.20</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-38.22</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-1885.45</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-8819.93</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-1763.99</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">289.88</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">48.84</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-6137.71</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-3482.98</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-1581.79</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-829.56</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">54.24</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-695.80</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-3953.96</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">206.28</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">2309.98</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-7368.07</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-8518.47</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">15.18</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">462.58</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-918.84</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">586.93</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">2.93</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-438.82</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">2448.74</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">1337.83</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">63.38</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-1254.70</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-8973.59</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1404.22</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">375.01</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1412.22</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1375.77</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1217.61</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-580.05</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-899.87</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-311.15</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-512.42</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-9487.77</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-27.64</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1094.49</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-5657.85</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-2500.89</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-2806.84</value><description><narrative> SESAF09001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">94.83</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1270.81</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1.32</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">4666.86</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-383.40</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">786.45</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">5083.82</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">2399.10</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-160.45</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-358.78</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">1265.68</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-44.25</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-26.13</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-3135.20</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.3 Financial Access Assistance Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">4547.56</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-1625.43</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">95.35</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">9525.48</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-16616.33</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">3462.66</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-78117.61</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> TESAF11001</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-3166.11</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-0.41</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">19.80</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">4133.57</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">53.15</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">53.15</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-23.07</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">214.23</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">25.23</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-2488.14</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">808.48</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-106.36</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-834.08</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0.00</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0.00</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-2664.28</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">2217.90</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">2735.23</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-10109.41</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 7.1 International Project Co-coordinator</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0.00</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">1211.32</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">7374.57</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">9436.30</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0.00</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-8462.04</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">28.80</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-2054.60</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-350.29</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">658.81</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">4747.89</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-18.43</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">84.86</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">19256.43</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-912.86</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">12.99</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">102.44</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-12.98</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">1751.98</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-270.98</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-168.09</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-2052.98</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">313.19</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">38.25</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-645.43</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-412.65</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-1500.41</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-1211.32</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">498.29</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-1251.59</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-1361.03</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-800.22</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-857.38</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-52.25</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-1062.58</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-1665.64</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">137.52</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-365.22</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-302.00</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-562.43</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-8833.30</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-86.07</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-603.63</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">603.63</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-0.82</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">52.37</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-0.69</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-73.67</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-171.06</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-55.19</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-1140.28</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-3699.43</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-30.99</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-6.44</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-422.80</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-268.68</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-388.24</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-0.51</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-109.56</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-249.49</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-53.01</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-12.92</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-2158.44</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">164.82</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">338.58</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">-1806.85</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">-23.72</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">17.16</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-2365.45</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-6497.16</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-1381.63</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">1915.59</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-272.55</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-732.28</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">60.16</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-4005.84</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-22.56</value><description><narrative> 7.6 UNIDO Staff Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-2144.13</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 2.3 National Capacity Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-722.03</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-301.11</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 7.2 Project HQ Support Staff</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-1275.09</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 7.7 Part Management &amp; Travel</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-1285.77</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 7.8 SARO Energy Policy and Risk Consult.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-11.78</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.2 Capacity Building Assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">169.83</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">312.37</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-562.59</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.1 Support Activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-8463.95</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">621.87</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-16.04</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-3100.53</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-1480.12</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-25645.35</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-4974.51</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-12429.72</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-16085.71</value><description><narrative> UESAF09002</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-6536.67</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-487.31</value><description><narrative> 7.9 DR and M&amp;E/IA</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-6259.33</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">-0.01</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-10473.00</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">2778.79</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-42288.68</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-143.46</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-17.16</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">6292.48</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">32.90</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-66297.77</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-19452.29</value><description><narrative> SESAF09A01</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-186.62</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 3.1 National Training System</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-4102.75</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 3.2 Industrial EnMS and ESO Training</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-3273.62</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 3.3 National EnMS and ESO Trainers</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-11057.49</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 3.4 Regional Training &amp; Resource Centres</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-16878.09</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-3431.23</value><description><narrative> 4.2 Programme of Pilot/Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-178.92</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 4.5 Case Studying of EnMS and ESO</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-1636.81</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 4.4 Design &amp; Impl. of Commun. Strategy</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-8184.02</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="103097-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 4.3 ESO Enterprise Impl. Support</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-105368</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>PREPARATION OF A HCFC PHASE-OUT MANAGEMENT PLAN</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-105368"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2008-08-06"/><activity-date type="3" iso-date="2012-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">5.79</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">328.58</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">-516.96</value></budget><transaction ref="105368-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">9000.00</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">0.00</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">-8994.22</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-25562.80</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">25562.80</value><description><narrative> Preparation of a  HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Preparation of a  HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0.01</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0.00</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-16214.96</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0.00</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">16511.17</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">43.94</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-13870.34</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">13920.88</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-0.02</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-2.11</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-60.00</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-518.83</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-516.96</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">123.47</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">7984.88</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-123.47</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105368-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-7984.88</value><description><narrative> Preparatory activities</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-105369</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (POLYURETHANE FOAM SECTOR)</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-105369"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2010-01-06"/><activity-date type="3" iso-date="2013-03-29"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">-7.10</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">-2055.92</value></budget><transaction ref="105369-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-15839.72</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">15839.72</value><description><narrative> Preparation for HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Preparation for HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-7.10</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-490.70</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> Preparation for HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-1614.84</value><description><narrative> Preparation for HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">49.62</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-62.85</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-441.08</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> MPSAF09005</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-1614.84</value><description><narrative> Preparation for HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="105369-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> Preparation for HCFC phase-out</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-120116</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Enhancing market access of emerging agri businesses in South Africa: Building a framework for pro-poor supply chain development within a cluster context.</narrative></title><description type="1"><narrative> SECO developed a Programmatic Approach for Local Economic Development in the ILembe District, consisting of a four-year long intervention with the overarching purpose of contributing to the improvement of the economic future of the area and the quality of life of its inhabitants. The overall programme comprises five components, namely:  - Public Financial Management Component - Municipal Infrastructure Component - Private Sector Development Component - Value-Chain and Cluster Development Component - Partnership and Coordination Component</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-120116"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SWITZERLAND</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2012-12-01"/><activity-date type="3" iso-date="2017-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Durban</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-29.8579 31.0292</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">11675.12</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">3593.82</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">9770.22</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">34965.93</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">120318.75</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-4508.86</value></budget><transaction ref="120116-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">6561.01</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-02-1"><transaction-type code="1"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">48.96</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-02-4"><transaction-type code="4"/><transaction-date iso-date="2013-02-28"/><value currency="USD" value-date="2013-02-28">4559.66</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0.00</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">-5535.58</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">6957.12</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0.00</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">52.42</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-286.87</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-1113.17</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">3556.31</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0.00</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-2423.05</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">-129.72</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">885.13</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-1774.06</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">110.91</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">68.04</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">533.50</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">2895.28</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-163.01</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">1026.68</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">36.13</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-60.24</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">226.94</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">304.23</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">57556.24</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">82516.32</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">31701.05</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">7878.05</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">19774.39</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">62060.64</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">7836.03</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">120.18</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-101.88</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-4641.92</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-3382.33</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-810.22</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1271.26</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-2033.69</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-3199.31</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">2423.01</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">7.85</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">138.97</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">58.18</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">462.25</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-173.27</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">3922.88</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">8.24</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">4739.89</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0.14</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-135.51</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">5902.72</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-436.50</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">12041.66</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-292.12</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">3495.00</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-115.70</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-215.65</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-14.23</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-46.09</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-3950.95</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-71.50</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">1624.43</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">822.48</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">6756.52</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">137.57</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">28559.31</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-389.28</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-98.10</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">13520.96</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-182.11</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">5413.37</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">17373.91</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-64.02</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">21.98</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">237.13</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-40.05</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">173.42</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">56.51</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">56.51</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">8242.91</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">8145.86</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">49.04</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">21.98</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">2.46</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">41.42</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">16.11</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-94.87</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">6764.34</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">5715.23</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">44.09</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">5623.50</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">250.53</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">97.42</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">128.94</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">99.75</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">6700.33</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">274.42</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">4229.94</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">106.72</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">1846.27</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">494.60</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">822.28</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-511.59</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-4209.67</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">2500.00</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">-1387.77</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-0.51</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">10.58</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">27.04</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">71.90</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">2624.44</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">5472.68</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">3222.80</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-408.55</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-3751.78</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">-20.74</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-561.53</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 3. Market access &amp; linkages</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-82.65</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 4. Business Support Services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-20956.35</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 2. Production capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-42739.88</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 1. SME networks &amp; clusters</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-29217.61</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Programme Component Coordinator # Techni</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-211.20</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120116-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> SECO Support Costs</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-120272</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>IEA/World Bank Roundtable on Industrial Policy in Africa</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-120272"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Regular Programme Of Technical Cooperati</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2012-06-01"/><activity-date type="3" iso-date="2013-06-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">9084.88</value></budget><transaction ref="120272-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">8930.90</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.68</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">543.51</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-24.58</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120272-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> UNIDO Funding for Roundtable</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-120407</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Assessment of Industrial Policy</narrative></title><description type="1"><narrative> The Manufacturing Competitiveness Enhancement Programme (henceforth MCEP) is a 700 m. USD programme lasting 6 years and that started in June 2012 to provide enhanced manufacturing support to encourage manufacturers to upgrade their production facilities in a manner that sustains employment and maximises value-addition in the short to medium term. Its stated objective is to improve the competitiveness of manufacturing enterprises and its overall success will hence be assessed in terms of the overall industrial competitiveness performance of South Africa. The project aims at delivering a) an immediate impact review of MCEP, b) the definition of an outcome- and impact oriented monitoring system for MCEP, and c) the plan for a mid-term impact assessment. The underlying definition of impact includes a) impact at the enterprise level (micro), b) impact at the aggregate level (macro), and c) possible unintended impacts.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-120407"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SOUTH AFRICA</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2012-11-01"/><activity-date type="3" iso-date="2015-06-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">95655.14</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">136579.72</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">55020.92</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">-33.00</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">18.58</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">-0.01</value></budget><transaction ref="120407-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">65000.00</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">84530.00</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">22780.69</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">174000.00</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-2500.00</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">5000.00</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">-2500.00</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">13831.74</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">2000.00</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">31405.85</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">15074.66</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">-2000.00</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">22815.50</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">-8435.46</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-3061.26</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-3441.25</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">433.98</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">-5726.52</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">18.96</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">23.62</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">46.40</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">77230.00</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">58355.44</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">159814.33</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">45048.35</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">64549.07</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-60165.78</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-164556.84</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-12609.76</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-20198.73</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-88819.50</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">1456.70</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">27.74</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">7590.16</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">113.39</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">7111.71</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">3308.72</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-43.84</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0.00</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-5770.70</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">7586.21</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">61.25</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">4420.01</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-200.37</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">17487.36</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">6195.05</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">1149.43</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">-81.77</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">-113.22</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">3544.39</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">18085.27</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">18294.23</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">16147.95</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-127.93</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-39.66</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-54.91</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">277.16</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-39.83</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-137.20</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-11.23</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">10474.98</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">45.40</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-174.50</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0.00</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">3181.79</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">4645.40</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-3748.15</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-1269.12</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-6236.76</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-1851.47</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-6981.90</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">3813.92</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-3755.59</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-23.02</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">4268.97</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">1126.92</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">2397.21</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">3594.69</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-243.93</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-817.07</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-2045.19</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">33658.70</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-1148.47</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-905.11</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">14483.22</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-372.06</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">3256.31</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-7072.19</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-1770.25</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">1099.87</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">688.55</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">6213.07</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-1210.92</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-5238.35</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">5689.34</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-266.17</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">-364.37</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">6052.94</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">58.33</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">29.24</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-3561.11</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1832.94</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-2308.76</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-287.06</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-34.00</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-1.45</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-2647.77</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-16670.08</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Design industrial intelligence system</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-16884.05</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-32386.97</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> MCEP  impact assessment</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">18.17</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.63</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">-0.01</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-0.01</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> DTI staff trained</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-3650.07</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120407-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> M&amp;E framework for MCEP</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-120487</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Industrial Energy Efficiency Improvement in South Africa through Mainstreaming the Introduction of Energy Management Systems and Energy Systems Optimization</narrative></title><description type="1"><narrative> The project aims to accelerate and expand the introduction of Energy Management Systems (EnMS), Industrial Energy Systems Optimization (ESO), and the Energy Management Standard ISO 50001 Series within the South African industrial (and selected commercial) context in order to realize increased investment in industrial energy efficiency (IEE) through the wide-scale adoption of the two methodologies and ISO 50001 under (i) enhanced institutional frameworks and regulatory environments, (ii) technical and implementation assistance to industry and (iii) multi-level engineer, technician and operator capacity building programmes.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-120487"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2014-10-19"/><activity-date type="3" iso-date="2022-09-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Pretoria</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-25.74486 28.18783</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">1423000.00</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">156027.29</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">252614.34</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">1703861.10</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">780412.12</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">42482.24</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">1083561.48</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">291608.09</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">-38464.54</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">61118.05</value></budget><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">1576484.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">604775.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">750000.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">220565.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">100000.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">250000.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">1950000.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">509434.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">750000.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">88226.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">400000.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">10809.91</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">5789.23</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">87.66</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">111.73</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">2083.58</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">7133.18</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">3592.49</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">496.22</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">2217.17</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">3158.71</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">303.15</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">367.74</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">7.41</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">4009.39</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">2460.84</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">984.34</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">27103.25</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">6747.49</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">11904.94</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">516.89</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">9394.49</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">2464.23</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">12262.65</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">1450.45</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">2363.51</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">18448.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">3462.05</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">111.16</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">1667.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">2149.31</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-149.54</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">1959.39</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-1575.93</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-374.33</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-1027.89</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">1470.22</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">3365.35</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">588.09</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">4031.25</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">4082.51</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">6461.34</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">2061.84</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">4719.53</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">29764.80</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">9084.77</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-224.27</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-1325.57</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">2836.03</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">4116.29</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">2678.89</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">6352.47</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">8961.14</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">20960.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">7.37</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">3530.95</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">835.88</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">3027.43</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">4476.78</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">502.68</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">2108.45</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">17046.01</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">7810.95</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">7829.14</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">37.65</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">1464.56</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">203.58</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">9153.77</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">1240.91</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">79.15</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">2400.35</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">107.10</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">2041.70</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">-1703.53</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">2514.48</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">15506.43</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">5889.34</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">185.30</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">2126.81</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">205.22</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">1814.90</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">148.11</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-674.69</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-289.21</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">2670.36</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">3249.61</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">805.05</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">3425.37</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1156.47</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">49171.91</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">3366.78</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1378.57</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">497.82</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">817.57</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">4391.20</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">1602.35</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">22455.57</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">12819.36</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">10217.43</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">120.40</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">2232.62</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">38.37</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">164.05</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">94.43</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">3228.90</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">2121.78</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">11114.17</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">150.85</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">114.14</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">-145.25</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">549.37</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">150.63</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">160.76</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-2002.06</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">60.51</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">43301.89</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-22.83</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">8020.14</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-32345.14</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">1234.41</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">19204.01</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">15561.41</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-1639.92</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">10749.73</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">8727.76</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-107048.22</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">13388.01</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-1407.31</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">16.57</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">3106.04</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-213.54</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">4338.28</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">824.18</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-8.26</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-4.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-144.09</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-4.77</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-78.80</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-10.46</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">693.43</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">21977.40</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-307.51</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0.53</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-155.56</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-307.51</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">4876.01</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">36.47</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-1893.12</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">8892.96</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">25.44</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">3894.20</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">519.40</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">25.44</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">7427.35</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-859.12</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-58.22</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0.14</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-58.22</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">1086.31</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">323.29</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">7963.51</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-648.50</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-45932.18</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">57710.18</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">986.16</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">19901.91</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">238939.17</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">365653.13</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">18066.76</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-867.22</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">940764.40</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">266.41</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">29180.92</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">56256.83</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">1.18</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">18211.17</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">69.64</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">348.52</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">317.53</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">1166.10</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">100.66</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">2713.70</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">15097.41</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">6867.97</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">14345.22</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">27472.61</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-23.40</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-2335.82</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-389.57</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">676.54</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">22835.70</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">4174.51</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-70.78</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">565.81</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">745.47</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-8956.61</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-237.15</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-156.23</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-339.11</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">1627.62</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">4248.62</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">8321.17</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">2795.14</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">10905.62</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">158.49</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">2101.16</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">12.34</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">476.77</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">13719.91</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">11398.51</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">350000.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">125722.23</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">2282.61</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">10003.17</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">4952.06</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">1150.31</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">190000.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-20000.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-6787.04</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">3.58</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">22889.73</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">184.68</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">162.38</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-199928.16</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">44640.78</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">7038.43</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">3426.78</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">25715.48</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">16439.07</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">44893.12</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">23159.54</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">40696.64</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-194.73</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">18550.02</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">24276.03</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">16657.46</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">1222.52</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">4659.22</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">5459.23</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">178.33</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">108.31</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">20.44</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">234.60</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0.22</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-293.59</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">42.78</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">22.54</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">46.47</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">1223.20</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">133.32</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">55.96</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">1609.43</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">3113.81</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">-10.15</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">610.96</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">1120.77</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">658.63</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">3902.21</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">-132.11</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">2630.12</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">375.13</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">9189.76</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">775.97</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-77334.59</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-17782.80</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">34.73</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-4419.55</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">19270.23</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">24094.09</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">174.13</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">14.11</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">-20346.19</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">300.87</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-7461.07</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-6060.56</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-382.91</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-13546.86</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">189.67</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-43248.49</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-4607.87</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-49339.71</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-7265.90</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-282.63</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-2732.93</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-4883.29</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">5630.09</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">1306.07</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-2790.26</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-297.58</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">4094.18</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">1448.42</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">314.49</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">49.58</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">392.42</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">216.19</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">585.45</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">50086.55</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">42125.34</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">9157.66</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">7035.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">44.06</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">41290.59</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">837.14</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">2467.69</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">7729.09</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">174.65</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">76335.01</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">186600.28</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-1490.96</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0.01</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">16588.33</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">1754.20</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">7926.98</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">24.48</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">1741.95</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">4439.93</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">110171.02</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">471214.78</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">45438.53</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">662.99</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">370.01</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">977.99</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">1264.01</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">247.13</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">28.80</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">-19000.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">533.21</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">538.21</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">19000.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">9717.42</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">58.94</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">2038.01</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">340.79</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-300.74</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">66.38</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">3410.31</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">26207.56</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">613.68</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-8404.16</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">35.80</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-65.43</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">87.98</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">68.63</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">413.35</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">355.83</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">9167.81</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">107.86</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">2653.96</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-20000.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-17661.76</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-562.93</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-197495.11</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-13455.10</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">20000.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">2267.79</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">186615.64</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-4866.64</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-271.96</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-4686.82</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">645.23</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">144.50</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">25328.32</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">13878.51</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">5135.32</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">25160.83</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">263.66</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">5427.47</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">17965.70</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">5465.92</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-85.19</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">17184.83</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">28700.77</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">161.69</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">788.35</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">565.28</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">293.77</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">57021.14</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">9.90</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-35.76</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">76.54</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">12128.81</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-855.42</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">565.45</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">1880.73</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">42750.58</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">1184.43</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">5085.54</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">1715.31</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">579.07</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">383.97</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">609.23</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-1211.67</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-97715.55</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">107.23</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-31148.11</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">1024.74</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">2000.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">28429.03</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">2000.00</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">40130.79</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-2500.00</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">106.59</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">1950.00</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">149.45</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">50.00</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">821.24</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-3000.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">98654.86</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-500.00</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">622.33</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">34.94</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-718.99</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-6349.73</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-2892.05</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-592.05</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">540.35</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">86.24</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-9075.09</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">1156.22</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">37.86</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-184.36</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">41.95</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">93.62</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">3.24</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">72.13</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">27.15</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">20.98</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-38873.33</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-0.03</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-1429.50</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-2618.61</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-180.92</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">11.04</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">14.54</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">11.40</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">774.41</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">1093.28</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">2687.64</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">10.92</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">10.27</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">14.08</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">10.27</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">978.50</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-1325.68</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">6103.04</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">-16827.15</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0.01</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">17931.02</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">-1293.77</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-2191.47</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> 6.0: Project Monitoring &amp; Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-6047.01</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> 5.0: EnMS and ESO Awareness Raising</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">47653.30</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">55552.08</value><description><narrative> 4.0: Investment Promotion in IEE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-51593.60</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> 3.0: EnMS and ESO Training Programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">9848.09</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0.00</value><description><narrative> 2.0: IEE Policy Implementation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-16879.74</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0.00</value><description><narrative> 1.0: Data Quality Improvement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-1053.40</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120487-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-120591</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>HCFC phase-out management plan (Stage I)</narrative></title><description type="1"><narrative> HCFC phase-out management plan (stage I)  (refrigeration servicing, custom training and monitoring) to phase out HCFCs in accordance with South Africa's obligation under the Montreal Protocol.. To meet the required phase out targets and comply with the requirements of the Multilateral Fund, including guidelines on the preparation of HCFC Phase-Out Management Plans, the following strategic priorities have been identified:  1. Additional legal instruments to control the supply and demand of HCFCs 2. Non-investment activity to support control of HCFC import and usage 3. Investment projects to phase out the use of HCFC-141b in the foam sector 4. Investment / incentive projects in Refrigeration &lt;(&gt;&amp;&lt;)&gt; Air-conditioning installation sectors 5. Assistance to the Refrigeration Service sector 6. Technical assistance to develop in-country ODS destruction capability.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-120591"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2012-12-03"/><activity-date type="3" iso-date="2023-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">442276.83</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">2274544.69</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">299206.19</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">861636.04</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">348156.04</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">456005.72</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">377142.46</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">9956.26</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">725157.91</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">531358.18</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">166758.61</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">-25206.98</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">-26.09</value></budget><transaction ref="120591-1-01-01-2013-01-1"><transaction-type code="1"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-01-4"><transaction-type code="4"/><transaction-date iso-date="2013-01-31"/><value currency="USD" value-date="2013-01-31">56073.16</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">79173.03</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-03-1"><transaction-type code="1"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">0.00</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-03-4"><transaction-type code="4"/><transaction-date iso-date="2013-03-31"/><value currency="USD" value-date="2013-03-31">3429.19</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">669.87</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-04-1"><transaction-type code="1"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-04-4"><transaction-type code="4"/><transaction-date iso-date="2013-04-30"/><value currency="USD" value-date="2013-04-30">-151.84</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">27060.64</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">151.83</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">4370.95</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">75214.28</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">3871.60</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">10424.17</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">75730.01</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">54705.76</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">127.60</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">48599.44</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-10.03</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">550000.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">2042620.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-87920.83</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">2913.47</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">87920.83</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-76.30</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">5167.10</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">215456.35</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">106.27</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-387.11</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">9757.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">906836.77</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">812722.23</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">9.48</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">307.56</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">146.99</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">-70.21</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">49710.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">824.62</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0.04</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">620.76</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">3243.82</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">112932.92</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">165495.14</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">9294.34</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">1148.10</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-8.03</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-44374.97</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">17915.75</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">162.56</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">370.91</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">8.01</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">7148.33</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">40431.07</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">16451.77</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">4564.45</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">4424.10</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">3684.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">265.26</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">28.62</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-265.26</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">1070.96</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-3566.27</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-974.88</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-7690.21</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-1799.23</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">18058.95</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">1589.87</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">1963.73</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-460.76</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">32199.22</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">3803.92</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">55549.46</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">12777.72</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">32617.89</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">100.92</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">18797.54</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">7196.93</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">5782.87</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">55354.80</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">8613.40</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">2847.40</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-14212.05</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">48441.58</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">2880.57</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">4045.75</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">1062.70</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-34164.08</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-344.48</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-16681.42</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">30.37</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">28751.18</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">23211.71</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">5741.98</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">46500.66</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-114.77</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-452.90</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">37192.24</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-469.29</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">7794.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">801.72</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-12627.36</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">16338.02</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">329.93</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">35688.33</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-233.97</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">67175.02</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">46856.64</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-18.14</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-5445.32</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">165146.75</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">64255.23</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-36828.66</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">366772.05</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">1194.35</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">16849.88</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-230.29</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">215.35</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">1002.37</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">40409.68</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">1670.95</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">340.43</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">11325.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">573.10</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">28474.12</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">172305.12</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">912.46</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">679898.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">622437.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">1667.23</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">23800.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-379.94</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">694.25</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">12045.68</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">606.07</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">-699.41</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">87.22</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">322.11</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-401.24</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">23239.11</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">455.65</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">92.03</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">12979.01</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-1394.25</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">122832.24</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-405.89</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">27983.79</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">13782.66</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">74532.83</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">742.59</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">18975.01</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0.85</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">24027.61</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">123.05</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">612.59</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">4.15</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">2.48</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-2385.16</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">120179.42</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">9657.01</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-47.89</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">14529.95</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">42903.03</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-338.08</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-53.90</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">55.97</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">12928.74</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-5117.43</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-122.02</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-246634.26</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-150.95</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">19518.90</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">8055.46</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">161.62</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-207.86</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-452.54</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">246634.26</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-45.67</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">4094.15</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-841.87</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">2957.77</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">761.76</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-3593.47</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-168.72</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">9854.41</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">5976.77</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-44309.70</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-15001.36</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-3773.26</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">2091.39</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-4324.71</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">985.35</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-866.49</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">2421.35</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-804.86</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">37618.30</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">2049.56</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">31.84</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">15158.34</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">78553.01</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-12.20</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">400.85</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">22658.05</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">1079.17</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">4432.78</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">397.24</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0.00</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">544.75</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">58047.12</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">34579.30</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">509170.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-7.56</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">3570.51</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-1.15</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-1.73</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">2086.32</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">385.20</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">18.00</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">27.02</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">2086.18</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">505.45</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-461569.30</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-21296.82</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-18235.30</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">445.32</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-1.06</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">1978.53</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-2013.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-4697.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">395.73</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">15494.19</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">3297.87</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">12675.87</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">7621.75</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">499612.00</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">4092.22</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">24138.85</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">29536.66</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-9949.43</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">17060.45</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">223.03</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">6278.21</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">310.73</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">333.26</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-4090.00</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-1619.76</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-63.24</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">4623.49</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-37.33</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">553.06</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">-518.59</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">-633.43</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">-83.67</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-132.21</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">1.62</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-947.05</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">15572.10</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">-6891.11</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">320.94</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-188.56</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">414272.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">267977.37</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">500.59</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">58.12</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">58.12</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">58.12</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">562.76</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">28320.03</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">6629.34</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">37.41</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">1965.60</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">5594.40</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">58.31</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">11.04</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">47.08</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">11.04</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">47.08</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">265.93</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-48.51</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">11.04</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-1188.78</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">47.08</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">11.04</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">387.64</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-110.98</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">11.04</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">105.86</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-4408.65</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0.01</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-600.17</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">11.08</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">47.23</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">106.38</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-168.58</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0.00</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">2010.24</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0.00</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">1407.14</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0.07</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">603.08</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">6030.73</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-15.91</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-11.15</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-47.73</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-4.78</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-3111.99</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-3270.93</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-1.24</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-3697.26</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-24141.32</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-2.22</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-64.88</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-15.14</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0.02</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-6.50</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-21.62</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">341900.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">3374.54</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">184349.59</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-17.82</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">3123.63</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">24092.36</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">13.32</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">57.10</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">5.71</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">-1721.69</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">19.03</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">1874.74</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">2.73</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">178760.00</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0.00</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-1291.47</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-6834.14</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Tranche II: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">-6500.00</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">21017.15</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">11630.68</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">1995.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">1875.40</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0.00</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">477.63</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0.00</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">7910.51</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">-267.96</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">110091.61</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">7084.88</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">9787.22</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-1695.47</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">3351.96</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">26.63</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">-1722.52</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">525.33</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-4.08</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-0.01</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-2.11</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-1995.00</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-160.32</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-20915.87</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-20890.66</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-5.80</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-1418.98</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-1508.16</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">2290.70</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-320.08</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-1455.29</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Tranche IV: Refig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-2.22</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Tranche I: ODS phase-out Refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-8095.65</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Tranche I: ODS phase-out Foam</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-3397.55</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0.00</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">-2215.64</value><description><narrative> Tranche III: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">2242.14</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-48.42</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-21454.72</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0.00</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">-0.02</value><description><narrative> Tranche II: Refrig/Customs/Monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">-0.01</value><description><narrative> Tranche III: Foam Sector</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-26.09</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-26.09</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="120591-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Tranche V: Refrigeration/customs/monitor</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130040</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>PA - National Biomanufacturing Initiative</narrative></title><description type="1"><narrative> Preparatory Assistance for a National Biomanufacturing Initiative (NBI) to service the National System of Innovation (NSI). A South Africa Project. The overall purpose of the project is to develop a focused NBI aligned with the national agenda that will translate research outputs in market-ready products and services, i.e., that will commercialize research. Furthermore, the project aims to close the gap, which currently exists in South Africa in terms of skills and necessary infrastructure, again to take biotechnology inventions through a product and process development phase that would provide market ready products that could be used for regulatory approvals, market testing and early market penetration. The project will ensure that business incubation services are provided. UNIDO will contribute to this at the technical as well as strategic level.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130040"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Special Resources for Africa</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2013-02-10"/><activity-date type="3" iso-date="2018-08-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">11736.18</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">7217.62</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">-35.90</value></budget><transaction ref="130040-1-01-01-2013-05-1"><transaction-type code="1"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">20265.25</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-05-4"><transaction-type code="4"/><transaction-date iso-date="2013-05-31"/><value currency="USD" value-date="2013-05-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-06-1"><transaction-type code="1"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">0.00</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-06-4"><transaction-type code="4"/><transaction-date iso-date="2013-06-30"/><value currency="USD" value-date="2013-06-30">13764.01</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-07-1"><transaction-type code="1"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">0.01</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-07-4"><transaction-type code="4"/><transaction-date iso-date="2013-07-31"/><value currency="USD" value-date="2013-07-31">5289.57</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-08-1"><transaction-type code="1"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">0.00</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-08-4"><transaction-type code="4"/><transaction-date iso-date="2013-08-31"/><value currency="USD" value-date="2013-08-31">-8867.36</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-09-1"><transaction-type code="1"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-09-4"><transaction-type code="4"/><transaction-date iso-date="2013-09-30"/><value currency="USD" value-date="2013-09-30">8654.26</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-10-1"><transaction-type code="1"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-10-4"><transaction-type code="4"/><transaction-date iso-date="2013-10-31"/><value currency="USD" value-date="2013-10-31">-481.64</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">-0.83</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">-6811.74</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">196.74</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">119.59</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">1.82</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">6534.76</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">7217.62</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-31.89</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-35.90</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-6974.97</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130040-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> Project Document Drafted</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130129</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>GEF UNIDO Cleatech Programme for SMEs in South Africa</narrative></title><description type="1"><narrative> Promotion of clean energy technology innovations and innovative clean energy technology entrepreneurship in South Africa through Clean Energy Technology Innovation Competition and Entrepreneurship Accelerator Programme.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130129"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2013-10-21"/><activity-date type="3" iso-date="2019-08-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Pretoria</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-25.74486 28.18783</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2013-01-01"/><period-end iso-date="2013-12-31"/><value currency="USD" value-date="2013-01-01">90194.61</value></budget><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">293617.63</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">418801.79</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">493699.66</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">586736.96</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">93604.08</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">12676.40</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">-48600.63</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">249.27</value></budget><transaction ref="130129-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">180000.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">200000.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">30000.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">120000.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">1460000.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-12-1"><transaction-type code="1"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2013-12-4"><transaction-type code="4"/><transaction-date iso-date="2013-12-31"/><value currency="USD" value-date="2013-12-31">90194.61</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">11226.60</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-01-1"><transaction-type code="1"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-01-4"><transaction-type code="4"/><transaction-date iso-date="2014-01-31"/><value currency="USD" value-date="2014-01-31">6442.13</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">-1.29</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">107693.22</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">19290.78</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">6.50</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">3090.15</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-9000.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">669.16</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">79805.39</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">20000.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">1133.98</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">-90805.39</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">65.65</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">15476.55</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">17.10</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">5323.27</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">1.29</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">5137.94</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">2671.69</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-15.26</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-68.28</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">1433.28</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">65.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">61.47</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-28.82</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">14935.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">43872.19</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-15000.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">206.60</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">4840.76</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">53457.37</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-79.36</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">10623.74</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-157.20</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-83.68</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">1309.20</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0.90</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">7912.67</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">28701.65</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">21.71</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">285429.99</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-0.01</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">131134.88</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">-416564.87</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">2571.22</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">19421.01</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-302.98</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">48362.21</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">8996.48</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">15.57</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">51180.39</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">24833.74</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0.01</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-2.31</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">6094.46</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">3889.48</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-205.15</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">5981.89</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">6647.76</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-158.18</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">53815.28</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-1270.72</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-80.79</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-6819.94</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">268.63</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">2484.42</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">22614.56</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">2030.18</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">3143.22</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">25742.20</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">256.65</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">3812.98</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">98906.76</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-301.95</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">238.69</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-81407.23</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">1513.23</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">47126.78</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">25195.18</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">2923.20</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">34280.45</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-314.59</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">12240.78</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">9.50</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">28341.74</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">11681.12</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">14930.49</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">6591.50</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">12902.42</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">21196.70</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">17429.42</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">6221.94</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">931.18</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">3928.41</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">2403.76</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">709.03</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">1655.75</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">537.75</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">5037.27</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">12021.20</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">50.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-60.34</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">940.39</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">50.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">49739.30</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-100.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">2532.15</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">12451.46</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">3609.50</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">68261.29</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">510.45</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">85737.43</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">29451.81</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">1608.76</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">1078.09</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-1170.04</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">3868.46</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-99.09</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">43951.94</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">444.01</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">569.18</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">1902.37</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">285.56</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">30840.87</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">13965.22</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">38536.85</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">14677.22</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">15926.43</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">637.69</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">-65.98</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">34010.45</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">3757.65</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">44.95</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">155.04</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">4491.19</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">10312.74</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">23475.87</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">98.37</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">1021.80</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">492.77</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-55000.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">43571.02</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">19.22</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">55000.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">79284.32</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-70000.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">6315.61</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">13831.99</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">70000.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">6735.38</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-1281.08</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">117.53</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">7939.98</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">87.13</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">1010.39</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">25363.17</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">5483.12</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">21479.08</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">20566.90</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">798.87</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">37.65</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">126.37</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">268.19</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">100000.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">68372.21</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">184.36</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-100000.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">47.38</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">1642.51</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">39258.36</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">5409.23</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">-882.95</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">195.13</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">2820.88</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">12643.91</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">2130.16</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">5234.93</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">-1417.45</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">164.89</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-20000.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">2587.67</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-8000.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">21.98</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">40000.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">23220.91</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-12000.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">400.86</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">141.13</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-127.44</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1608.54</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-654.86</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">44.48</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-443.83</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">11842.28</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">4827.39</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">18818.76</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">12271.83</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">2601.84</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">-4485.87</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">-295.22</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">2404.64</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">79.18</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">6660.50</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">135.45</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">2007.33</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">11026.83</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">6797.55</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">11539.65</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">13934.78</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">-13138.17</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">3346.27</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">2642.44</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">67.90</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">-12070.75</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">154.22</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">170.81</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">11192.31</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">1664.89</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">85.84</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-1299.60</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-2861.84</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">226.22</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">8436.21</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-762.32</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">2161.43</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">668.09</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-54.76</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-26797.68</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">1059.01</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">88.65</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">906.00</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-180.50</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">5366.03</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-537.35</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">4355.44</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-103.42</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-11910.47</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-900.44</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">1283.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">86.69</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">1583.82</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">11809.39</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">165.74</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">1313.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-17.85</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">124.93</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-109.58</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-77.83</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">30.67</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-194.74</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">1118.36</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0.03</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">102.24</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">14.70</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">511.25</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-2.94</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">2925.76</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-70.19</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-18.94</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">885.19</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-1164.39</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">34.53</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">3901.08</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-1854.70</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">15.76</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-2046.38</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-12.89</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">3691.28</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">4832.21</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">5181.42</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">2598.33</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-2571.93</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0.01</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-0.01</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">10.38</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">61.70</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-10.78</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-8.24</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-5.94</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">-1340.84</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">-13507.03</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-0.01</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-3157.72</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-46.48</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-4694.91</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-11374.04</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-11348.61</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">16.95</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">33.59</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">8.87</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">35.47</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">-2795.24</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">-406.24</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0.56</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0.01</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">-299.92</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">2410.08</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">-1763.25</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">-97.64</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-14831.68</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.3 Capacity building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-433.56</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.2 Policy framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-31886.02</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0.00</value><description><narrative> 1.1 Cleantech Platform</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-1438.47</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 2.1 Monitoring &amp; Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-430.50</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130129-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 3.1 Evaluation</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130273</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Industrial Energy Efficiency Improvement in South Africa through Scaling-up the Introduction of Energy Management Systems</narrative></title><description type="1"><narrative> Project Objective: To accelerate and expand the introduction of Energy Management Systems (EnMS), Industrial Energy Systems Optimization (ESO), and the Energy Management Standard ISO 50001 Series within the South African industrial (and selected commercial) context in order to realize increased investment in industrial energy efficiency (IEE) through the wide-scale adoption of the two methodologies and ISO 50001 under (i) enhanced institutional frameworks and regulatory environments, (ii) technical and implementation assistance to industry and (iii) multi-level engineer, technician and operator capacity building programmes.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130273"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2013-12-31"/><activity-date type="3" iso-date="2016-12-13"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Johannesburg</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-26.20227 28.04363</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">48713.23</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">-4148.82</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">-117.21</value></budget><transaction ref="130273-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">15000.00</value><description><narrative> 1. FSP Component Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 1. FSP Component Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">15000.00</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2013-11-1"><transaction-type code="1"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">20000.00</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2013-11-4"><transaction-type code="4"/><transaction-date iso-date="2013-11-30"/><value currency="USD" value-date="2013-11-30">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-15000.00</value><description><narrative> 1. FSP Component Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 1. FSP Component Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-15000.00</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">30000.00</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">49963.89</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-1250.66</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">-14494.51</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-15.26</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">10487.02</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-126.07</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-5435.59</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">5435.59</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-117.21</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-5435.59</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 2. Incremental Cost Analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-117.21</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130273-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 3. FSP Document Drafting</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130281</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Energy Efficient and Low-Carbon Transport in South Africa</narrative></title><description type="1"><narrative> The objective of the Project is the promotion of the widespread use of electric vehicles (EVs) and non-motorized transport (NMT), and the development of the necessary infrastructure, as part of the Green Transport and Green Cities initiatives of South Africa.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130281"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2014-03-01"/><activity-date type="3" iso-date="2021-03-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Johannesburg</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-26.20227 28.04363</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">82163.29</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">126929.92</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">355175.02</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">249644.64</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">205766.03</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">156080.56</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">85186.74</value></budget><transaction ref="130281-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">810000.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">50000.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">90000.00</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">350000.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">84913.72</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">1773.58</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">-2896.67</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">58.54</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">60000.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-79857.58</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-1689.40</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-142.42</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">3.52</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">20000.00</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">5404.95</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-779.41</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">13413.28</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">2527.16</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">826.75</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">8809.04</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">1559.37</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">9425.12</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">12277.65</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">1201.44</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">1230.94</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">11208.78</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">2268.32</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">1085.17</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">9463.30</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">20619.21</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">25.87</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-20.77</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-2621.79</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">29.69</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">1632.16</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">101.75</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-188.43</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">18.18</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">46.88</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">160.54</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-23.08</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">1062.14</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-86.96</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">13561.07</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">3397.03</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-3.59</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">3915.38</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">5087.52</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">295.26</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">12480.76</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">16176.81</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">9399.97</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">1249.98</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">764.49</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">18303.32</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">5626.18</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">1.34</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">5321.56</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">5964.43</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">-750.61</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">653.41</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-111.09</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">15.11</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">53080.05</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">29876.11</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">3147.26</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">5.12</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">19442.62</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">623.03</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">20580.32</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">8057.68</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">4251.33</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">4540.58</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">330.94</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">2307.69</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">672.96</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">15260.60</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">516.57</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">-816.29</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">35765.35</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">38532.44</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">3000.82</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">8059.59</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">18247.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">6089.46</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-905.62</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">6452.34</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1641.40</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1211.83</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">95.70</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">12.48</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">11876.97</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">39403.52</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-1050.97</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">21819.49</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">2504.17</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">1573.81</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">25241.12</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">604.10</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">130.48</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">576.05</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">5648.47</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">285.53</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">698.46</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">380.40</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-644.24</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-149765.93</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">12757.92</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">31371.47</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">4797.24</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">137234.34</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">423.78</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-18839.88</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">1212.02</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">5078.36</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-65.46</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">564.45</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-296.91</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">2292.88</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">760.61</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">5498.15</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">1520.91</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">48404.02</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">37396.68</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">615.11</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">316.15</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-19.34</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">21560.94</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">241.45</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">682.67</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">66.07</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-66.14</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-2211.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-2531.67</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">1197.78</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-878.38</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">947.15</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">331.84</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">5628.97</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">8895.28</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">2166.06</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">34672.05</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">5205.60</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-814.58</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">7321.12</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">124.15</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-1992.63</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">41045.59</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">20000.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">138.13</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-20000.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">33726.05</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">3694.27</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">5944.54</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">3613.82</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">15845.08</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-11800.54</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">436.52</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">4186.68</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">8169.42</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">13179.20</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">2.72</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">1240.60</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">4059.88</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">1623.93</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">13.50</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">900.66</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">8969.43</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">1643.41</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-844.14</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">4587.30</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-52.98</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">6.70</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">1766.18</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-41114.06</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-0.02</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">537.12</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">41114.08</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">2234.53</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-307.59</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">3677.92</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">74706.81</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">1927.89</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">26.82</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">2553.85</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">-365.74</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">40.23</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0.00</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">565.23</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">20.56</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">61.21</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">819.92</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">-576.50</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">-82.53</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">44942.94</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-31.43</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-1424.77</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-657.61</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">485.73</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">-31.29</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">10600.63</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">643.95</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">17253.01</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">7.36</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-998.69</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-67.14</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-8014.32</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">4887.95</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-138.53</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">2444.36</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">1909.16</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">62.50</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">831.08</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">19544.88</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">5653.68</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">40348.84</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">19600.00</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">125.33</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">6803.76</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">942.57</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">980.93</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">14.42</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">183.88</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">526.07</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">2281.73</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">-4322.30</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">7.68</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">151.50</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">-581.52</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-93.93</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">14.36</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">-93.58</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">22.79</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0.01</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-640.55</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> 3.1 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-209.03</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> 2.1 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-21077.94</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">150.24</value><description><narrative> 1.2 Promotion and Demonstration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-17126.28</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130281-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-7074.60</value><description><narrative> 1.1 Policy and Capacity Building</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130282</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Energy Efficient Low-carbon Transport in South Africa (Preparatory Assistance)</narrative></title><description type="1"><narrative> Promotion of the widespread use of electric vehicles and non-motorized transport (NMT) as part of the Green Transport and Green Cities initiatives of South Africa to facilitate local manufacturing of EV and bicycle parts and componentsand the development of the necessary infrastructure.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130282"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2014-05-08"/><activity-date type="3" iso-date="2016-12-13"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Pretoria</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-25.74486 28.18783</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">5673.01</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">47567.41</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">8734.52</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">33.44</value></budget><transaction ref="130282-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">65000.00</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">4790.62</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-4.84</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0.01</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">874.63</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">12.59</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">10791.44</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0.00</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">8709.72</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">2841.98</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-348.64</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0.00</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">171.89</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">20239.44</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">517.63</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">-48.04</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">4628.58</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">1661.91</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">10.89</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-1609.39</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">10878.72</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">149.50</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">82.44</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">30.25</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-2416.44</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">10.05</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">33.44</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-2991.62</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130282-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 3.1. Detailed Project Design and Develop</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130302</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Institutional strengthening of the Intra-Africa Metrology System (AFRIMETS Phase II)</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130302"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>NORWAY</narrative></participating-org><participating-org role="1"><narrative>UNIDO</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2013-11-01"/><activity-date type="3" iso-date="2017-07-31"/><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">153211.87</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">37446.52</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">50438.24</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">45576.84</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-86.71</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">-0.04</value></budget><transaction ref="130302-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">66185.62</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">24827.58</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-02-1"><transaction-type code="1"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">137517.23</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-02-4"><transaction-type code="4"/><transaction-date iso-date="2014-02-28"/><value currency="USD" value-date="2014-02-28">6594.06</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-03-1"><transaction-type code="1"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">0.00</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-03-4"><transaction-type code="4"/><transaction-date iso-date="2014-03-31"/><value currency="USD" value-date="2014-03-31">-192.78</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-04-1"><transaction-type code="1"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-04-4"><transaction-type code="4"/><transaction-date iso-date="2014-04-30"/><value currency="USD" value-date="2014-04-30">769.90</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">3466.67</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-06-1"><transaction-type code="1"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-06-4"><transaction-type code="4"/><transaction-date iso-date="2014-06-30"/><value currency="USD" value-date="2014-06-30">5442.18</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">2143.39</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">-1.84</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">62426.37</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">46790.91</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-08-1"><transaction-type code="1"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-08-4"><transaction-type code="4"/><transaction-date iso-date="2014-08-31"/><value currency="USD" value-date="2014-08-31">-23.64</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-606.00</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">-43.02</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0.00</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">17434.32</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">-3440.79</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">4752.99</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-2969.26</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-115.21</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">3.88</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">-1159.50</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-2236.67</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-2074.90</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">-2173.09</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">1710.97</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">3915.95</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">978.99</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">887.39</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">4878.05</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">16253.66</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0.00</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">36585.37</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0.01</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">-15.81</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">928.84</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">500.82</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-1829.92</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">672.42</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-411.34</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">5260.41</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">1344.27</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">557.38</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">14170.08</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">213.85</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">2678.00</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">6951.50</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">29478.05</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">1049.05</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">17073.17</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">2783.58</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-2.20</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">377.39</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">1000.22</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">7.94</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">10.43</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">13.30</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-62.23</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-2677.95</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">6020.90</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-7376.57</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-2703.68</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-4978.33</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1225.49</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-125.55</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-48.08</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">12686.88</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-17.30</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">3.06</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">-88.53</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">5372.07</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">1983.16</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">3013.07</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">1613.83</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-1514.81</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-5470.46</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">235.29</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">5470.46</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">775.18</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">2188.18</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">1271.75</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-2188.18</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">6578.24</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">580.14</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">2784.31</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">559.96</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">2965.87</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-0.14</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">1121.80</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-3.40</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">7920.00</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">1072.77</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-186.51</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-629.27</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-218.90</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-1252.63</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">2269.44</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-2.21</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">1756.10</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0.00</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">581.57</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">1146.31</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-3.38</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-0.01</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">47.23</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-2794.91</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">384.42</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-2133.64</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">7041.06</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">29120.87</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-1046.03</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">2652.58</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">1046.03</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">6320.00</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-7041.06</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">3819.24</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">1201.99</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">63.20</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">2494.06</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">1141.74</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">143.88</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">422.01</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">24.58</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">313.36</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">-237.27</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">56.40</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">-87.84</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-891.40</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-2496.18</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">43.17</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">1948.52</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">201.31</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">1992.46</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-79.10</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-0.07</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-0.15</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-1554.18</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-0.01</value><description><narrative> 3. Ensuring sustainability of AFRIMETS</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-15129.21</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-0.02</value><description><narrative> 2. Strengthen NMOs (industr./scientific)</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-0.01</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-0.01</value><description><narrative> 1. Strengthen LMOs</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-15381.98</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="130302-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0</value><description><narrative> 4. Project coordination</narrative></description><recipient-region code="M2" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130310</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Promoting organic waste-to-energy and other low-carbon technologies in small and medium and micro-scale enterprises (SMMEs): Accelerating biogas market development.</narrative></title><description type="1"><narrative> The project addresses both the energy needs and challenges related to waste management in South Africa municipalities. The project aims to transform the market of renewables by using organic waste from agriculture and agro-processing industries for energy production in SMMEs.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130310"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2016-03-21"/><activity-date type="3" iso-date="2023-11-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Johannesburg</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-26.20227 28.04363</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">519621.02</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">984950.47</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">850416.96</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">506918.95</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">292297.15</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">419766.60</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">181366.95</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">418639.69</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">-56973.04</value></budget><transaction ref="130310-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">668137.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">807071.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">2066723.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">409126.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">70000.00</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">201053.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">24875.33</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">2678.14</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-38.41</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">888.08</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">17.95</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">2630.18</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">550.91</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">425000.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">3589.19</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">20.25</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">-63.73</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-10-1"><transaction-type code="1"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-10-4"><transaction-type code="4"/><transaction-date iso-date="2016-10-31"/><value currency="USD" value-date="2016-10-31">42320.83</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">2732.17</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">419.61</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-353.42</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">4.91</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">1143.75</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">125.62</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">9316.50</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">3763.16</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">4813.35</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">24881.35</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">10305.88</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">14444.03</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">6175.71</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">467.04</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">4.59</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">4.59</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">183879.32</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">21.19</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-5.52</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">897.43</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-250.27</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">63.58</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">39.25</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">1736.30</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">84.82</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">56.25</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">127139.99</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">11122.24</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">29457.22</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">70.85</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">4619.51</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">267.43</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">137.83</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">106.01</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-388.22</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">387865.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">122.06</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">4511.23</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">123.43</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">9139.32</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">-125000.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">143.02</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">72.48</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">104.87</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">3186.91</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">139912.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">3017.31</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">139480.99</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">103.16</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-922.13</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">90.31</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">101.48</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">797.31</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1130.30</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-195.75</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">376.02</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-440.04</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">1079.44</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">115506.69</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">21319.03</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">24532.58</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">35564.30</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">265.29</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">1654.88</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">59320.69</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">25966.53</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">507.22</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">200.22</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">4289.67</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">15.03</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">3212.76</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">138.07</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">934.46</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">211.06</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">601.87</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-65.75</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">202388.94</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-4.98</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-71.36</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">240.13</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-2.89</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-176.01</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">332.12</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-373.71</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">21856.66</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-7.24</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">10238.19</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-445.17</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">1199.16</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-11012.29</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-73.95</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-442.02</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-5671.53</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">3796.28</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">1209.68</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">12152.26</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-561.03</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-125.19</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-128.74</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-16.02</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">6291.33</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-33.75</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-7.74</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">20.80</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">63.43</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">-9338.57</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-106.79</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-91.02</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">40.39</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-2174.72</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">591322.31</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-83.71</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">283.15</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-6076.61</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">20.80</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-258188.23</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">33628.76</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">14409.78</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">26158.72</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">49805.05</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">24592.74</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">-8.44</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">10134.49</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">2230.54</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">1507.45</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">1106.87</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">262.26</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">21.70</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-37.45</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">39.68</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">109.42</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-322.50</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">50.49</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">1217.81</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-5.63</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">887.35</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-13.97</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-10088.97</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-56.33</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">175088.20</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">186.34</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">573.82</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">1832.22</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">14.27</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-64.69</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">3415.29</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-393.61</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">110.95</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">218.42</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">12592.46</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">7.61</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">36702.15</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">27.34</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">18481.55</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">16.26</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">10709.78</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">23.15</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">17447.38</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">31252.17</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">8596.66</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-29.49</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-1834.61</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-92.76</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">47.79</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">315.69</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-6.97</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">11183.65</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-33130.63</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">20497.73</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-32.56</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">2356.23</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">2266.68</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">673.63</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">10.43</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">859.01</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">951.38</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">5196.15</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">1432.62</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">3599.98</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">8855.41</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">227.67</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">2037.72</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">1419.28</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">6110.78</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">1536.60</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">11661.87</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-109.19</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">10417.34</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">33105.11</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">10415.44</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">23638.68</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">3892.60</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">3593.29</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">47816.49</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-4.44</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">7481.62</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">-260.93</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">155.14</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">10338.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">6950.69</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">3326.19</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-8.21</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-24042.18</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-1062.54</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">7000.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-38.36</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">13715.99</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">-52.77</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">769.82</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">2679.39</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">28.98</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">3401.27</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">789.69</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">1739.60</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">1451.32</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">80220.61</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">243.33</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">219.60</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">70.16</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">245.03</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">3298.98</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">268.54</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">422.45</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">467.52</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">6363.64</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">17359.29</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">151.02</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-1536.02</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">135.49</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">2314.75</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">755.79</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">486.59</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">4053.62</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">780.40</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">26.60</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-541.40</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">501.31</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">1207.16</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">397.71</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">1083.18</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">-856.80</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">-4248.09</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">2274.99</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">677.29</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">35.69</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">-3371.18</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">31403.13</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">5065.50</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">-2502.40</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">3407.69</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">27.65</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0.02</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">-1000.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">51345.82</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">1000.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">-32.86</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0.00</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">1444.32</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">13209.48</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">34.20</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">17277.42</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">53330.40</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-95.60</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">392.22</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">39970.16</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">290.60</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">12430.23</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">86.52</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">87396.84</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">53.95</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">2598.04</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">6348.84</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">36.74</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">23679.42</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">792.28</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">102102.38</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">47393.38</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">-90540.65</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">86702.33</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">-90846.60</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">488.56</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-25.86</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">29.61</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">59.27</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">630.77</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">1705.32</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">635.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">6008.29</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-363.74</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">8856.72</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">17078.38</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">1594.85</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">-5101.89</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">28.72</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">530.09</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">1645.67</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-719.28</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">7347.12</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-142474.85</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-14.40</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">2496.30</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">1999.93</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">32892.91</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">80850.17</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">787.49</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">4182.99</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">448.06</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">150144.79</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">10972.03</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">61758.14</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">-19.21</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">-73.52</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">-253.62</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">78.03</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">10148.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-355674.30</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">50972.22</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">16956.22</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">3066.88</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">25495.52</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-5898.03</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">10469.45</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">64.22</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-142.27</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-389.96</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">15920.56</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-203.65</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">2119.67</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-841.51</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">68695.47</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-405.38</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">1016.45</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-869.26</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">1832.62</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">62.33</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">205.87</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">221.88</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">11867.74</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">174.13</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">37144.49</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-195.12</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">8584.36</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-69.50</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-424.54</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">100.40</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">10473.26</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-956.52</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-127.80</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">6180.72</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">21888.63</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">3995.44</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-3995.44</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">320.50</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">3800.65</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">10040.35</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">157.60</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">700.26</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-2400.20</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">158.05</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-792.33</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">530.27</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">4398.04</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">66.80</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-1917.90</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">1603.92</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">14989.90</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">14605.10</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">110075.14</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">731.14</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">30025.49</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">6151.95</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">4418.45</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">33939.01</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-10475.09</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">1331.14</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-2786.01</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">-46.38</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">-914.52</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">1826.78</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-274.04</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">881.90</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">4660.22</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">305.96</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">493.57</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">141959.53</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">7909.27</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">572.96</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">267.31</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-47510.37</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-110.85</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">26.27</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">668.20</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">26.27</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">-6925.09</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">1454.74</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">131.95</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">72658.39</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">6668.89</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-3.95</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0.02</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">49.82</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">4398.04</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">8615.18</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">601.96</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">34.82</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">3013.52</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">-5000.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">7704.09</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">4094.81</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">2321.61</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">205.88</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">839.20</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">3160.32</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">829.98</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">41.46</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">14.59</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">102.20</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-121.04</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.01</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">-522.49</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">31.70</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">809.68</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-3959.63</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-2554.97</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-8861.80</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">405.44</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-552.00</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-17200.94</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-2237.58</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-236.63</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-106.29</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-1733.82</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">64.92</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-0.09</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-0.01</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">34.62</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">-139.05</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">-200.06</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">-357.05</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">44.22</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-233.94</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">3.91</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">48.24</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">62.67</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-9325.39</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-1081.84</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-177.84</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-1.70</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-11.43</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-6386.92</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-701.60</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-17748.95</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-8282.30</value><description><narrative> Market and regulatory framework strength</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-67535.18</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Biogas systems operational</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-236.61</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-9923.87</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Additional projects and documents</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-2572.12</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Effective Assessment of Outputs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">-701.60</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130310-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-130313</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Industrial Organic Waste-to-Energy (Preparatory Assistance)</narrative></title><description type="1"><narrative> Promote market based adoption of integrated biogas technology in small and medium and micro-scale enterprises (SMMEs) in South Africa.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-130313"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2014-05-26"/><activity-date type="3" iso-date="2016-05-25"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Johannesburg</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-26.20227 28.04363</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2014-01-01"/><period-end iso-date="2014-12-31"/><value currency="USD" value-date="2014-01-01">27846.59</value></budget><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">57449.17</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">3799.40</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">-710.45</value></budget><transaction ref="130313-1-01-01-2014-05-1"><transaction-type code="1"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">90000.00</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-05-4"><transaction-type code="4"/><transaction-date iso-date="2014-05-31"/><value currency="USD" value-date="2014-05-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-07-1"><transaction-type code="1"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-07-4"><transaction-type code="4"/><transaction-date iso-date="2014-07-31"/><value currency="USD" value-date="2014-07-31">2142.56</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-09-1"><transaction-type code="1"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">0.00</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-09-4"><transaction-type code="4"/><transaction-date iso-date="2014-09-30"/><value currency="USD" value-date="2014-09-30">21870.28</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-10-1"><transaction-type code="1"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-10-4"><transaction-type code="4"/><transaction-date iso-date="2014-10-31"/><value currency="USD" value-date="2014-10-31">2021.07</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-11-1"><transaction-type code="1"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-11-4"><transaction-type code="4"/><transaction-date iso-date="2014-11-30"/><value currency="USD" value-date="2014-11-30">-703.84</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">2516.52</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-01-1"><transaction-type code="1"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">0.00</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-01-4"><transaction-type code="4"/><transaction-date iso-date="2015-01-31"/><value currency="USD" value-date="2015-01-31">48494.37</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">7378.07</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">-6.89</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-04-1"><transaction-type code="1"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-04-4"><transaction-type code="4"/><transaction-date iso-date="2015-04-30"/><value currency="USD" value-date="2015-04-30">-281.18</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">155.88</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">2416.32</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-606.67</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">304.19</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">-348.80</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">310.01</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-204.67</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-161.46</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">3989.46</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">9.66</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-199.72</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-710.45</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">-1615.29</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="130313-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> CEO Endorsment Request Developed</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-140210</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Towards a joint UN programme to boost sustainable business practices among SME suppliers in the South African automotive sector - Preparatory / Inception Phase</narrative></title><description type="1"><narrative> The overall objective of the joint ILO-UNIDO Scoping Initiative is to develop an approach to enhance competitiveness levels at the level of lower tier suppliers (i.e Tier -2, Tier 3 and other SMME suppliers) with a focus on four inter-linked key areas, notably skills and technology upgrading for productivity and quality improvement; waste minimization and resource efficiency; employee engagement and labour relations improvement; and social protection access for workers at the workplace. this initiative will build on the assistance provided by UNIDO within the context of the former Tirisano Programme which was originally focused on training related to lean manufacturing tools as well as incorporating the unique elements of the ILO SCORE training, (the focus on labour-management relations) highlighted in SCORE Module 1 Workplace Cooperation; and on the existing partnership of the ILO and the national constituents to promote sound industrial relations for competitive and sustainable enterprises with the priority sectors of the economy.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-140210"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> ILO</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2014-12-01"/><activity-date type="3" iso-date="2017-09-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Durban</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-29.8579 31.0292</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">98582.73</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">40954.58</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">-100.20</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-5457.99</value></budget><transaction ref="140210-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">47000.00</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0.00</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">20500.00</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-03-1"><transaction-type code="1"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">88500.00</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-03-4"><transaction-type code="4"/><transaction-date iso-date="2015-03-31"/><value currency="USD" value-date="2015-03-31">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">18519.15</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">45000.00</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">4808.93</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">3000.00</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">4598.12</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">-3.54</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">741.60</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">3237.14</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">8356.95</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-09-1"><transaction-type code="1"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-09-4"><transaction-type code="4"/><transaction-date iso-date="2015-09-30"/><value currency="USD" value-date="2015-09-30">949.17</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">46.67</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">9236.55</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">31.06</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-81.64</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-26.24</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0.00</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">12.21</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0.00</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">141.09</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0.00</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">15.51</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">2059.52</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">22203.89</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">960.00</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">97.78</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-960.00</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">-0.32</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">2306.68</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">130.48</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">6084.16</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-52.60</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0.03</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-34.28</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">98.13</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">5022.85</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">29.94</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">18.32</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">7417.86</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">-486.29</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-24.81</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">198.57</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-198.57</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-3916.76</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">-100.20</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">-0.17</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-5624.33</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-1607.20</value><description><narrative> OP 2. UNIDO-ILO approach dev.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-11380.17</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-3850.62</value><description><narrative> OP1. Supplier needs assessment framework</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-5016.38</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140210-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> OP 3. Joint Project Proposal Dev</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-140341</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Climate Change, Clean Energy, and Urban Water in Africa Promoting market-based deployment of clean energy technology solutions in municipal waterworks: Pilot Initiative in South Africa</narrative></title><description type="1"><narrative> UNIDO and Renewable Energy &lt;(&gt;&amp;&lt;)&gt; Energy Efficiency Partnership (REEEP) are proposing a pilot initiative aimed at creating model pathways of market-based approaches to the cost effective deployment of clean energy technologies in municipal waterworks in Sub-Sahara Africa. The implementation of this pilot initiative will focus on South Africa and create a solid basis for a market-based replication and scaling up in the country and in the SADC region as a whole.  The overall objective of this project is to create model pathways of market-based approaches for cost effective deployment of clean energy technologies, services and systems in municipal waterworks initially piloted in South Africa. It is envisaged to establish public-private partnerships and create a solid basis for replication and scaling up of the initiative not only in the country, but also in the SADC region and throughout Sub-Saharan Africa. The specific objective is increased energy use efficiency and renewable energy production in municipal waterworks in three selected municipalities in South Africa (small and medium cities with about 100 ,000 inhabitants).</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-140341"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>EUROPEAN UNION</narrative></participating-org><participating-org role="1"><narrative>UNIDO</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2015-01-01"/><activity-date type="3" iso-date="2019-07-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">19227.26</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">316385.98</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">683656.32</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">569107.51</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">55487.15</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">-197875.03</value></budget><transaction ref="140341-1-01-01-2014-12-1"><transaction-type code="1"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">24783.15</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2014-12-4"><transaction-type code="4"/><transaction-date iso-date="2014-12-31"/><value currency="USD" value-date="2014-12-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-02-1"><transaction-type code="1"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-02-4"><transaction-type code="4"/><transaction-date iso-date="2015-02-28"/><value currency="USD" value-date="2015-02-28">1138.32</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-05-1"><transaction-type code="1"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-05-4"><transaction-type code="4"/><transaction-date iso-date="2015-05-31"/><value currency="USD" value-date="2015-05-31">1091.08</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-06-1"><transaction-type code="1"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-06-4"><transaction-type code="4"/><transaction-date iso-date="2015-06-30"/><value currency="USD" value-date="2015-06-30">1430.02</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0.01</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0.00</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">981.00</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0.01</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-549.48</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">12338.96</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">92.70</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">1573.27</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">50300.42</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">76723.19</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">29774.61</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">240579.31</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">988.90</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-12.66</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">963.36</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-11.67</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">3957.64</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">219159.42</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">76917.50</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">18633.22</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-36.75</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-8.13</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-715.46</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-504.69</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-1108.09</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-59.81</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">3014.86</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">12059.44</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">40551.27</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-485.55</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">521346.29</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-5794.09</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">90942.14</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-1176.56</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">37506.32</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-23.47</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-20055.74</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-34653.02</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">39.45</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">88213.29</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-38255.30</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">157.80</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-258.96</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">49.68</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">198.72</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">11064.35</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-1702.52</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> Development of Project Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">156774.91</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">526279.97</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">21276.60</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">346.18</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-09-1"><transaction-type code="1"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-09-4"><transaction-type code="4"/><transaction-date iso-date="2017-09-30"/><value currency="USD" value-date="2017-09-30">86.55</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">16.72</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">22.65</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-3.91</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-5.32</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">23.19</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">31.42</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">356.93</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">4889.22</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">1717.85</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">4061.79</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">2498.81</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">5507.52</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">1634.08</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">5913.86</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">12143.26</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">4118.84</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">7322.15</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">1821.73</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">884.54</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-5318.06</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">95.03</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">839.74</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">139.25</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">91.59</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">43.37</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">266133.82</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">117313.54</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">806.62</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">26230.25</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0.00</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">88637.48</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-56.51</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-33.22</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">-140.16</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">282996.53</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">114178.55</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">8098.38</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">40796.49</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">1344.99</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">1616.31</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">3361.33</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">11957.81</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">24587.30</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">49072.08</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">824.89</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">5387.19</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">10588.14</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">3915.94</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-625.37</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">8719.82</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">2470.12</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">43204.15</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-5042.58</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">569.37</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-971.43</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">1427.56</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">1064.85</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">2863.41</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-497.55</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">6544.71</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-882.13</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">6572.80</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-652.50</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">4919.45</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-5559.48</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">181.03</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-11138.80</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0.00</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-2813.21</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">16847.01</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">19511.48</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-532.14</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">4566.21</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">7418.23</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-473.16</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-4566.21</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">5143.80</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">2926.47</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">147.69</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-1555.02</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-570.78</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">1332.68</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-800.67</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-148.80</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">-1266.23</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">106.94</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">1037.92</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">10344.92</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">228.31</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">66.89</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-7327.97</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">-120.95</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">2995.05</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">652.61</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">512.99</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">815.59</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">392.42</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-1974.65</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-893.51</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-424.29</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-1020.54</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.13</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.07</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.08</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-54.44</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-1.66</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-198.47</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-1372.89</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-10107.02</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-37.81</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-508.67</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-390.15</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-800.00</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-116018.73</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-30033.34</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-70594.28</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">14340.41</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">171.15</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-4537.67</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">-2806.47</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">10073.18</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">-1743.54</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">2670.15</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">6167.36</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-125858.79</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.1 Inception report, demonstration work</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-33330.43</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.2 PPP and scale up</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-115376.70</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.3 Policy recommendations</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">19823.23</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="140341-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> 1.4 Monitoring and Evaluation</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-150193</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Preparation of a demonstration project on the technical and economic advantages of the vacuum assisted injection in discontinuous panel's plant retrofitted from HCFC-141b to pentane</narrative></title><description type="1"><narrative> Preparation of a demonstration project on the technical and economic advantages of the vacuum assisted injection in discontinuous panel's plant retrofitted from HCFC-141b to pentane</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-150193"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2015-06-08"/><activity-date type="3" iso-date="2016-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Johannesburg</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-26.20227 28.04363</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance="0"/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">31112.37</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">14393.32</value></budget><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">213333.21</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">1970.06</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">-55.80</value></budget><transaction ref="150193-1-01-01-2015-07-1"><transaction-type code="1"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">40000.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2015-07-4"><transaction-type code="4"/><transaction-date iso-date="2015-07-31"/><value currency="USD" value-date="2015-07-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2015-08-1"><transaction-type code="1"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">0.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2015-08-4"><transaction-type code="4"/><transaction-date iso-date="2015-08-31"/><value currency="USD" value-date="2015-08-31">31123.16</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">-10.79</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-167.50</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">1355.13</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">103.83</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">888.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0.01</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">222200.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-0.01</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">4717.09</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">6531.09</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-134.32</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">202400.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">1100.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">-202400.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">202400.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">-990.75</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">34.65</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0.00</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">10898.56</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">2222.10</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-252.04</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-456.09</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150193-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-55.80</value><description><narrative> South Africa: Demo project</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-150265</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Support for clothing, textile, leather and footwear in the Province of KwaZulu-Natal</narrative></title><description type="1"><narrative/></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-150265"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Special Resources for Africa</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2015-10-09"/><activity-date type="3" iso-date="2016-07-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">9325.75</value></budget><transaction ref="150265-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">24390.25</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">8244.83</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-84.65</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">52.25</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-1549.31</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">-13427.06</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150265-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-150349</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>South Africa Country Programme Framework (2015 - 2020)</narrative></title><description type="1"><narrative> This Country Programming Framework (CP) is designed to enhance UNIDO#s support to the Government of South Africa  to implement a road-map towards Inclusive and Sustainable Industrial Development (ISID) as stated in the Lima Declaration adopted on the 2 December 2013 during the 15th session of the General Conference of UNIDO.  As industrialization is a long-term endeavour involving many stakeholders, efforts will be made to strengthen synergies and minimize duplication by collaborating with development cooperation partners, state and non-state actors, including the private sector in the country.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-150349"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Regular Programme Of Technical Cooperati</narrative></participating-org><participating-org role="1"><narrative> Special Resources for Africa</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2015-10-06"/><activity-date type="3" iso-date="2020-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Cape Town</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-33.92584 18.42322</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2015-01-01"/><period-end iso-date="2015-12-31"/><value currency="USD" value-date="2015-01-01">12043.16</value></budget><budget><period-start iso-date="2016-01-01"/><period-end iso-date="2016-12-31"/><value currency="USD" value-date="2016-01-01">43792.62</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-399.02</value></budget><transaction ref="150349-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">54878.05</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">11105.07</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-10-1"><transaction-type code="1"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">6097.56</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-10-4"><transaction-type code="4"/><transaction-date iso-date="2015-10-31"/><value currency="USD" value-date="2015-10-31">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-11-1"><transaction-type code="1"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-11-4"><transaction-type code="4"/><transaction-date iso-date="2015-11-30"/><value currency="USD" value-date="2015-11-30">-135.80</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-12-1"><transaction-type code="1"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2015-12-4"><transaction-type code="4"/><transaction-date iso-date="2015-12-31"/><value currency="USD" value-date="2015-12-31">406.22</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-4152.85</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">127.07</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-01-1"><transaction-type code="1"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">-627.10</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-01-4"><transaction-type code="4"/><transaction-date iso-date="2016-01-31"/><value currency="USD" value-date="2016-01-31">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">37475.93</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-02-1"><transaction-type code="1"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">6564.55</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-02-4"><transaction-type code="4"/><transaction-date iso-date="2016-02-29"/><value currency="USD" value-date="2016-02-29">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">40306.51</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-03-1"><transaction-type code="1"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-03-4"><transaction-type code="4"/><transaction-date iso-date="2016-03-31"/><value currency="USD" value-date="2016-03-31">6384.93</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">131.11</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-04-1"><transaction-type code="1"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-04-4"><transaction-type code="4"/><transaction-date iso-date="2016-04-30"/><value currency="USD" value-date="2016-04-30">-8.74</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-17.78</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-05-1"><transaction-type code="1"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-05-4"><transaction-type code="4"/><transaction-date iso-date="2016-05-31"/><value currency="USD" value-date="2016-05-31">-280.95</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-06-1"><transaction-type code="1"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-06-4"><transaction-type code="4"/><transaction-date iso-date="2016-06-30"/><value currency="USD" value-date="2016-06-30">-2681.75</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-07-1"><transaction-type code="1"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-07-4"><transaction-type code="4"/><transaction-date iso-date="2016-07-31"/><value currency="USD" value-date="2016-07-31">-0.01</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-08-1"><transaction-type code="1"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-08-4"><transaction-type code="4"/><transaction-date iso-date="2016-08-31"/><value currency="USD" value-date="2016-08-31">64.88</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-09-1"><transaction-type code="1"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-09-4"><transaction-type code="4"/><transaction-date iso-date="2016-09-30"/><value currency="USD" value-date="2016-09-30">-39.55</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-11-1"><transaction-type code="1"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2016-11-4"><transaction-type code="4"/><transaction-date iso-date="2016-11-30"/><value currency="USD" value-date="2016-11-30">75.83</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0.64</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">-16.43</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-39397.24</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.00</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">-5599.10</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">-366.21</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-17.76</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-464.73</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> PA Output 1 Country Programming Mission</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-405.15</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="150349-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> PA Output 2 Country Programme Document</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-160253</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>PA for Rural Wealth Creation through Community Based Private Partnership to develop domestic agribusiness and agroprocessing value chains</narrative></title><description type="1"><narrative> UNIDO is partnering with NCIBA GROUP (PTY) LTD  to stimulate production and value addition along  six pre-selected agro value chains mainly Tea, wool, fruits, Maize, mutton/lamb and agro-forestry.  Development of the selected value chains will promote diffusion of innovation and enhance access to markets and information.  This will enable agro and livestock producers to engage in higher productivity and more market oriented higher value production.    Through this approach the small holder producers can also be linked to national, regional and global agricultural value chains in a more efficient and sustainable manner.  Overall it is expected that small holder producers will earn more from their economic activities, improve food security and rural diets.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-160253"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Trust Fund for Increased Food Security t</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2016-12-05"/><activity-date type="3" iso-date="2021-05-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Cape Town</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-33.92584 18.42322</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">18152.11</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-134.38</value></budget><transaction ref="160253-1-01-01-2016-12-1"><transaction-type code="1"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">21231.42</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2016-12-4"><transaction-type code="4"/><transaction-date iso-date="2016-12-31"/><value currency="USD" value-date="2016-12-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-01-1"><transaction-type code="1"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-01-4"><transaction-type code="4"/><transaction-date iso-date="2017-01-31"/><value currency="USD" value-date="2017-01-31">3758.47</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-02-1"><transaction-type code="1"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-02-4"><transaction-type code="4"/><transaction-date iso-date="2017-02-28"/><value currency="USD" value-date="2017-02-28">2549.66</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-03-1"><transaction-type code="1"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-03-4"><transaction-type code="4"/><transaction-date iso-date="2017-03-31"/><value currency="USD" value-date="2017-03-31">-0.01</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0.00</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">12890.41</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">53.77</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">18.11</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-07-1"><transaction-type code="1"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-07-4"><transaction-type code="4"/><transaction-date iso-date="2017-07-31"/><value currency="USD" value-date="2017-07-31">-0.98</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">776.20</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">-405.52</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">-698.53</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">437.81</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0.00</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-3746.44</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="160253-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-120.82</value><description><narrative> OP1.  Partnership Agreement</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-170054</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Technical support for the implementation of integrated agro-industrial parks in the north West Province of South Africa</narrative></title><description type="1"><narrative> The project seeks to provide technical support to the Republic of South Africa to establish Integrated Agro-Industrial Parks in the North Western Province (Request received on 9th March 2017).  Although the North West Province has vast arable land for agriculture production and a vibrant agricultural community, its economy is predominantly based on mining.   Cognizant of the potential of the agricultural sector in economic development, the province is driving the establishing agro-industrial parks  to diversify its economy.  The initiative is further supported by the presidential launch of operation Phasika in February 2017 for agriculture which is an integrated fast tracked service delivery program aimed at transforming the agriculture sector towards an inclusive rural economy.  Using UNIDO's established tools and methodology in Integrated agro-industrial park development, UNIDO will provide TA in selected agro value chain disgnostics, preparation of full fledged feasibility studies and accompanying business plans as well as the preparation of master plans for each agro- industrial park.  UNIDO will also provide TA in the actual establishment of geographical clusters of industrial firms and the related establishment of Rural transformation centers.    The expected outcome will be better integrated agricultural</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-170054"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Regular Programme Of Technical Cooperati</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2017-04-24"/><activity-date type="3" iso-date="2020-04-21"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2017-01-01"/><period-end iso-date="2017-12-31"/><value currency="USD" value-date="2017-01-01">8499.77</value></budget><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">-108.32</value></budget><transaction ref="170054-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">10983.27</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">3492.28</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-04-1"><transaction-type code="1"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">9937.24</value><description><narrative> OP1.2. Action plan for full feasibilitty</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-04-4"><transaction-type code="4"/><transaction-date iso-date="2017-04-30"/><value currency="USD" value-date="2017-04-30">0</value><description><narrative> OP1.2. Action plan for full feasibilitty</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-05-1"><transaction-type code="1"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-05-4"><transaction-type code="4"/><transaction-date iso-date="2017-05-31"/><value currency="USD" value-date="2017-05-31">328.51</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-06-1"><transaction-type code="1"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-06-4"><transaction-type code="4"/><transaction-date iso-date="2017-06-30"/><value currency="USD" value-date="2017-06-30">0.04</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-08-1"><transaction-type code="1"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-08-4"><transaction-type code="4"/><transaction-date iso-date="2017-08-31"/><value currency="USD" value-date="2017-08-31">-161.23</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-10-1"><transaction-type code="1"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">0.00</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-10-4"><transaction-type code="4"/><transaction-date iso-date="2017-10-31"/><value currency="USD" value-date="2017-10-31">2986.73</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-11-1"><transaction-type code="1"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-11-4"><transaction-type code="4"/><transaction-date iso-date="2017-11-30"/><value currency="USD" value-date="2017-11-30">68.96</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-12-1"><transaction-type code="1"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2017-12-4"><transaction-type code="4"/><transaction-date iso-date="2017-12-31"/><value currency="USD" value-date="2017-12-31">2257.23</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">1412.82</value><description><narrative> OP1.2. Action plan for full feasibilitty</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">0</value><description><narrative> OP1.2. Action plan for full feasibilitty</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-01-1"><transaction-type code="1"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">353.09</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-01-4"><transaction-type code="4"/><transaction-date iso-date="2018-01-31"/><value currency="USD" value-date="2018-01-31">-36.73</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-02-1"><transaction-type code="1"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-02-4"><transaction-type code="4"/><transaction-date iso-date="2018-02-28"/><value currency="USD" value-date="2018-02-28">108.59</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-03-1"><transaction-type code="1"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-03-4"><transaction-type code="4"/><transaction-date iso-date="2018-03-31"/><value currency="USD" value-date="2018-03-31">-136.07</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-04-1"><transaction-type code="1"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-04-4"><transaction-type code="4"/><transaction-date iso-date="2018-04-30"/><value currency="USD" value-date="2018-04-30">16.83</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-2976.19</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> OP1.1.  Value chain diagnostics report</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">-11473.43</value><description><narrative> OP1.2. Action plan for full feasibilitty</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170054-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">0</value><description><narrative> OP1.2. Action plan for full feasibilitty</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-170100</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>UNIDO-HP partnership to foster entrepreneurial learning among youth in South Africa</narrative></title><description type="1"><narrative> The SA Government requested UNIDO's collaboration and support to create job opportunities for young men and women in South Africa through UNIDO-HP joint entrepreneurship and enterprise creation initiatives. The entrepreneurial learning approach for youth to be implemented in South Africa will be based on UNIDO's Mashrou3i project (SAP 120357) in Tunisia within a South-South Cooperation scheme.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-170100"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Regular Programme Of Technical Cooperati</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2018-05-22"/><activity-date type="3" iso-date="2021-09-01"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">22983.08</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">-148.40</value></budget><transaction ref="170100-1-01-01-2018-05-1"><transaction-type code="1"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">23225.80</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-05-4"><transaction-type code="4"/><transaction-date iso-date="2018-05-31"/><value currency="USD" value-date="2018-05-31">12047.10</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-06-1"><transaction-type code="1"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-06-4"><transaction-type code="4"/><transaction-date iso-date="2018-06-30"/><value currency="USD" value-date="2018-06-30">8229.95</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-07-1"><transaction-type code="1"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-07-4"><transaction-type code="4"/><transaction-date iso-date="2018-07-31"/><value currency="USD" value-date="2018-07-31">2542.64</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-08-1"><transaction-type code="1"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-08-4"><transaction-type code="4"/><transaction-date iso-date="2018-08-31"/><value currency="USD" value-date="2018-08-31">-265.94</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">-207.70</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">16.08</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-10.81</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">-152.22</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-3.31</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-391.02</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="170100-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-180150</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Global Quality and Standards Programme: Strengthening the quality of essential and vegetable oils exports from South Africa</narrative></title><description type="1"><narrative> Country project within the UNIDO-SECO Global Quality and Standards Programme (GQSP - 170032).</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-180150"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SWITZERLAND</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2018-08-15"/><activity-date type="3" iso-date="2023-09-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2018-01-01"/><period-end iso-date="2018-12-31"/><value currency="USD" value-date="2018-01-01">56350.36</value></budget><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">304049.92</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">206442.89</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">310208.16</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">340292.39</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">124545.20</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">-2441.40</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">-174.87</value></budget><transaction ref="180150-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">196593.88</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">6557.07</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">116114.83</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">8425.48</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">75147.43</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">3933.40</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-1"><transaction-type code="1"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">92985.70</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-09-4"><transaction-type code="4"/><transaction-date iso-date="2018-09-30"/><value currency="USD" value-date="2018-09-30">11844.87</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">1052.17</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">12794.08</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">51.17</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-1"><transaction-type code="1"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-10-4"><transaction-type code="4"/><transaction-date iso-date="2018-10-31"/><value currency="USD" value-date="2018-10-31">996.33</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">1327.09</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">3028.51</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">233.77</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-1"><transaction-type code="1"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-11-4"><transaction-type code="4"/><transaction-date iso-date="2018-11-30"/><value currency="USD" value-date="2018-11-30">-195.56</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-8379.71</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">14.17</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-4448.85</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">346.05</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-3454.27</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">3076.68</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">-3351.30</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">588.18</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-530.33</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">10983.92</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-31.48</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">15882.31</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-41.50</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">13835.12</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-1"><transaction-type code="1"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">-1.20</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-01-4"><transaction-type code="4"/><transaction-date iso-date="2019-01-31"/><value currency="USD" value-date="2019-01-31">4759.66</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0.00</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">112.62</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0.00</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">-2.34</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">15.83</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">87.06</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">15090.48</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">17043.27</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-0.01</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">44649.34</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">-0.01</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">52880.81</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0.00</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">14.70</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">31401.13</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">10465.91</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-31401.14</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">4091.04</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">11881.04</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">27.99</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-60.15</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-15.49</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-8.26</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">177.48</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">949.37</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">325.04</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">69.84</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0.00</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">10313.42</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0.00</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">26.69</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0.00</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">9308.14</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0.01</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">22640.54</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">175.15</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">95.56</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-21.32</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">-8.35</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-59018.27</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">-40.89</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">15410.96</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">14583.58</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">8219.18</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">1918.80</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">35388.13</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">9752.84</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-174.22</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">4379.82</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-63.77</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">2193.36</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">52301.08</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">4407.48</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">166083.20</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-32.17</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">83970.08</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">-927.74</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">184827.96</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">11118.45</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">2755.35</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">2104.00</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">829.07</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">502.03</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-323.94</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">20706.73</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-212.16</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">52127.58</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-469.66</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">21209.60</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-1230.91</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">19029.61</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-478.94</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-31.15</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">715.52</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-93.22</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">7269.52</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">10.29</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">18732.18</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">3204.17</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">70.56</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-19.18</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-19.18</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-427.20</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">2047.19</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">-27.73</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">918.40</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">15995.47</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">1454.97</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">116.84</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">262.33</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">2110.10</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">2237.38</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">270.43</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">45.14</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">1400.94</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">104.91</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">5534.18</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">8649.85</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">363.90</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-25917.50</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">4861.34</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">35915.20</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">392.38</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">781.66</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">-1485.72</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">1480.00</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">162.65</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-8044.92</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">3409.38</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-34342.84</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">3653.14</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">33178.77</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">1058.92</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">17162.48</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">4814.14</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">1895.10</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">172.97</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">444.61</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">3913.12</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">4978.09</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">289.81</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">1421.32</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">1273.12</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">44.31</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">34719.18</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">921.12</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">45063.28</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">39.72</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">32333.40</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">1550.96</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">39227.11</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">209.07</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">2766.70</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">4231.60</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">1021.47</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">137108.55</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-93.62</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">137959.76</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-104.28</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">12476.01</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">463.55</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">64881.47</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">203.89</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">38.37</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">19473.01</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">83.36</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">12956.95</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">459.46</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">-12.82</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">289.42</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">12719.58</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">251.16</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">16.32</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">17155.96</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">16692.71</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">49.96</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">1521.49</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">15833.32</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">16439.03</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-130.43</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">1922.82</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-1805.40</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-118.29</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-104.68</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">1932.47</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">5023.68</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">1262.29</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">1109.31</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0.00</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">7346.54</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0.01</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">901.85</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">112.84</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-1860.02</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">1065.24</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-5074.03</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">7139.40</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-4819.04</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">-1700.44</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">2846.86</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">5180.26</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">1131.87</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">920.77</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-991.99</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-1012.49</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">24561.52</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-7368.83</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">2476.17</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-10396.01</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">28951.78</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">4068.49</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">61.06</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">228.85</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">3890.84</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">26826.75</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">23981.02</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">10165.79</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">267.04</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">46353.61</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">42.55</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">20280.76</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">2486.15</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">1416.61</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">382.76</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">32.11</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">66758.52</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-286.98</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-100.19</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">25743.38</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">12630.57</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">21734.36</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">1474.42</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">2384.72</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">14966.93</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">5795.88</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">7455.55</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">1843.98</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">10437.15</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">521.06</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-7294.17</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">24234.44</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">526.47</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">1477.20</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-479.59</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">4202.85</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">2274.22</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">121.70</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">137.24</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">9325.15</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">7200.64</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0.00</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">2387.04</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0.01</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">3200.11</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">66.74</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">7.79</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">3.37</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">406.75</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-1806.73</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">22371.03</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-425.12</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-3241.74</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">53.84</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-5366.94</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">33577.15</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-3165.68</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">8759.48</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">2377.42</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">3004.72</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">305.49</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">-924.32</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">6605.46</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">1547.18</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-37.94</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">16974.78</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-601.16</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">3757.58</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">3425.96</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">-170.54</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">3533.09</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">5169.81</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">2618.00</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">441.49</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">3021.49</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">4966.71</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">242.49</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-79.38</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">3424.74</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-79.37</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">3364.16</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">-82.76</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">-74.29</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">9.49</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">9.50</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">3.82</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">73.73</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">28.97</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">80.73</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">19.22</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">38.30</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-51.33</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">15.41</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">35.29</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">697.48</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">394.31</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">15.42</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">29.75</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-28.77</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-3.73</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-23.04</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">25.89</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">50.60</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">4.70</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-16.71</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-0.02</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-2257.46</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">-41.80</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-4.27</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-112.68</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">4.63</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-73.90</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-90.28</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-1.73</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-135.99</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-0.04</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-7.19</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-24173.35</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-15.35</value><description><narrative> Output 2.4 Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-529.73</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.3 Culture of quality promoted</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-15764.50</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.2 SME compliance enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-1239.73</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180150-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.1 NQIS Enhanced</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-180352</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>HCFC phase-out management plan (stage II)</narrative></title><description type="1"><narrative> The HCFC Phase out Management Plan (HPMP) Stage II  is a programme designed to help South Africa totally phase out the remaining hyd rochlorofluorocarbons (HCFCs), which destroy the earth#s protective ozone layer and contribute to global greenhouse gas emissions. The activities for the HPMP Stage II will focus on initiatives for the changing context of the Refrigeration and Air-conditioning (RAC) in the servicing sector in South Africa.  These include the policy instruments required to control the supply and demand of HCFCs, non-investment activity to support control of HCFC import and usage, assistance to the Refrigeration Service sector and raising public awareness in the country.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-180352"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2019-01-01"/><activity-date type="3" iso-date="2031-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">25105.88</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">20672.59</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">39731.23</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">4531.29</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">1672334.46</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">958656.65</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">331562.18</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">830529.21</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">938021.50</value></budget><budget><period-start iso-date="2028-01-01"/><period-end iso-date="2028-12-31"/><value currency="USD" value-date="2028-01-01">938021.50</value></budget><transaction ref="180352-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">90000.00</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">19285.00</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">5559.59</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">52.50</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">208.79</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">20649.31</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">49.73</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">70.00</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">-96.45</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">39766.00</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-34.77</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0.00</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">4486.77</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">14.84</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">14.84</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">14.84</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-40.99</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">2993125.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">40.99</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">77791.80</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-0.01</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-1.51</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-1.50</value><description><narrative> PRP for HPMP stage II</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">51688.37</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">3341.16</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">34050.76</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">9267.77</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">2852.13</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">910.33</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">8948.74</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">-1912.40</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">1494675.55</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-9278.24</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">22493.37</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">111734.03</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">29858.88</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-3841.03</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">2053.55</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">185.88</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-1202.73</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">12857.77</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">37818.51</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">21399.41</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">714193.58</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">11105.43</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">112012.28</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">5627.98</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">49742.20</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">18447.99</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">54108.21</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">944.84</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">13461.90</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">55575.32</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">15733.83</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">1273.72</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">4228.44</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">405.47</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">2676043.00</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">17391.02</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">54952.56</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">9213.56</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">49.90</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">23553.78</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">921.62</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">145.08</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">142.27</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">6.64</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">82.41</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">2646.67</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">12366.56</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">120.14</value><description><narrative> HPMP Stage II, first tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">37448.97</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180352-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">2314.14</value><description><narrative> HPMP Stage II, second tranche</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-180354</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Enabling activities for HFC phase-down</narrative></title><description type="1"><narrative> The objective of the project is to achieve a broader understanding of the Kigali amendment provisions and to prepare technical and legislative bases for the ratification.  To achieve this end, the following activities will be carried out:  1. Analysis of existing Ozone and Climate Policy and Legislation and drafting the amendments in the existing legislation to allow for ratification of the Kigali amendment (HFC phase-down schedule, licensing requirements, HFC reporting requirements). 2. Stakeholder consultations to facilitate the ratification process at the national level. 3. Translation of the Kigali amendment support documents into Arabic 4. Drafting the Law on ratification of the Kigali amendment with the justification document, as required by the national legislative process 5. Production of information sheets on the Kigali amendment to facilitate consultations and speed up the ratification (translation of the Ozone Secretariat#s briefings and relevant OzonAction factsheets and other documentation into national language and printing 100 copies of each of the translated documents) 6. Finalizing the package on the ratification of Kigali amendment and advancing the ratification process.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-180354"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol HFC</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2019-01-01"/><activity-date type="3" iso-date="2020-06-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">201504.96</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">11639.53</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">-5658.23</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">-14119.35</value></budget><transaction ref="180354-1-01-01-2018-12-1"><transaction-type code="1"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">240000.00</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2018-12-4"><transaction-type code="4"/><transaction-date iso-date="2018-12-31"/><value currency="USD" value-date="2018-12-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-02-1"><transaction-type code="1"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-02-4"><transaction-type code="4"/><transaction-date iso-date="2019-02-28"/><value currency="USD" value-date="2019-02-28">134691.34</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-03-1"><transaction-type code="1"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-03-4"><transaction-type code="4"/><transaction-date iso-date="2019-03-31"/><value currency="USD" value-date="2019-03-31">15167.93</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-04-1"><transaction-type code="1"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-04-4"><transaction-type code="4"/><transaction-date iso-date="2019-04-30"/><value currency="USD" value-date="2019-04-30">-22333.93</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-05-1"><transaction-type code="1"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">0.00</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-05-4"><transaction-type code="4"/><transaction-date iso-date="2019-05-31"/><value currency="USD" value-date="2019-05-31">-32643.26</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">18045.27</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">14594.27</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">839.40</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">14061.53</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">10129.91</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">43055.37</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">5897.13</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">32524.43</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">-5966.19</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">82.44</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">83.72</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">62.23</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">965.44</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-16112.55</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0.01</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">-26872.30</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">26872.30</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-127.01</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-5531.22</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-46633.09</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="180354-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-14119.35</value><description><narrative> Enabling activities for HFC phase-down</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-190110</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Support for transitioning from conventional plastics to more environmentally sustainable alternatives</narrative></title><description type="1"><narrative> In order to reduce the amount of plastic leaking into the environment (including the marine environment) in South Africa, the project will support South Africa#s transition to more environmentally sustainable alternatives from conventional single-use plastics.  This will be achieved through the development of an Action Plan to strengthen the local industry for the manufacturing of alternatives (including, but not limited to bioplastics), and building up capacities for plastics recycling. The proposed project has the potential to reduce plastic leakage to the environment and unlock new economic opportunities - both of which are urgently needed for South Africa.  The project would consist of two components: one will support the identification and implementation of opportunities for sustainable alternative materials, including bioplastics, and the second will support the implementation of the Industry Waste Management Plan of the plastic packaging industry by building up the capacity and integration of the informal waste sector; with a view to enhance waste separation at source to increase the quality and amount of collected recyclables.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-190110"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>JAPAN</narrative></participating-org><participating-org role="1"><narrative>UNIDO</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2019-06-15"/><activity-date type="3" iso-date="2023-05-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2019-01-01"/><period-end iso-date="2019-12-31"/><value currency="USD" value-date="2019-01-01">110327.23</value></budget><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">371839.65</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">752415.47</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">379804.80</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">76803.70</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">1317.56</value></budget><transaction ref="190110-1-01-01-2019-06-1"><transaction-type code="1"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">16421.24</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-06-4"><transaction-type code="4"/><transaction-date iso-date="2019-06-30"/><value currency="USD" value-date="2019-06-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-07-1"><transaction-type code="1"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-07-4"><transaction-type code="4"/><transaction-date iso-date="2019-07-31"/><value currency="USD" value-date="2019-07-31">4523.56</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-08-1"><transaction-type code="1"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-08-4"><transaction-type code="4"/><transaction-date iso-date="2019-08-31"/><value currency="USD" value-date="2019-08-31">2639.65</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">659.09</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">1011200.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">4067.82</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">121920.35</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-1"><transaction-type code="1"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">459800.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-09-4"><transaction-type code="4"/><transaction-date iso-date="2019-09-30"/><value currency="USD" value-date="2019-09-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">-1.79</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-10-1"><transaction-type code="1"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-10-4"><transaction-type code="4"/><transaction-date iso-date="2019-10-31"/><value currency="USD" value-date="2019-10-31">836.98</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">4271.31</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-11-1"><transaction-type code="1"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-11-4"><transaction-type code="4"/><transaction-date iso-date="2019-11-30"/><value currency="USD" value-date="2019-11-30">27.12</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0.11</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">-2457.06</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">83886.27</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">4999.71</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-1"><transaction-type code="1"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">2457.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2019-12-4"><transaction-type code="4"/><transaction-date iso-date="2019-12-31"/><value currency="USD" value-date="2019-12-31">9240.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">-92.68</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">125101.65</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">4872.37</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-1"><transaction-type code="1"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-01-4"><transaction-type code="4"/><transaction-date iso-date="2020-01-31"/><value currency="USD" value-date="2020-01-31">38610.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0.13</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-02-1"><transaction-type code="1"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-02-4"><transaction-type code="4"/><transaction-date iso-date="2020-02-29"/><value currency="USD" value-date="2020-02-29">671.51</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">679.22</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">6629.78</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">-5.50</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">61428.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">19164.27</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">6594.45</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-05-1"><transaction-type code="1"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">1730.82</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-05-4"><transaction-type code="4"/><transaction-date iso-date="2020-05-31"/><value currency="USD" value-date="2020-05-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">10338.54</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">9930.04</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">-4329.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">37407.78</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">4318.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">61525.93</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">11.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">341.26</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">5326.14</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">23793.11</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">1984.10</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">3954.45</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">1245.75</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">3411.72</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">-4059.52</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">5910.81</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">4790.82</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">2157.08</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">918.98</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">13248.78</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">2317.05</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">83.70</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">12.57</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">59410.60</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">103628.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">2373.93</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">151487.83</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">2323.42</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">1987.71</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">-35.43</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">-4296.34</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">2860.31</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">-44473.87</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">2106.43</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">74603.05</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">1920.53</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">-30129.18</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">1016.10</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">15109.12</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">16486.87</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">25146.25</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">49544.23</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">1861.41</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">3492.91</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">746.41</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">100739.09</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">29.87</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">20041.84</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">3305.08</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">2009.95</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">8246.58</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">88033.52</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">1407.43</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">90701.55</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">15738.75</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-24076.29</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">9055.25</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">24955.97</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">101264.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">8546.25</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">1134.63</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">3524.39</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">47.78</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">4418.48</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">1483.54</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">3112.38</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">71.36</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">22685.31</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">2526.64</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">2565.05</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">189.26</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-31487.90</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">3043.26</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">28878.66</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">8967.58</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">2609.24</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">11822.49</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">16574.60</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">244.84</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">6403.70</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">249.59</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-15.10</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">2363.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0.22</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">20142.02</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">120498.37</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-0.22</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">1276.29</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">5016.18</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">1837.09</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">1292.49</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">305.17</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">882.65</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">928.73</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-1087.64</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">1122.81</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">1411.65</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">10585.42</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">19407.50</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">562.43</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-472.74</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-19441.01</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">2000.98</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">24397.23</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-13884.50</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">14552.43</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">7310.38</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">7462.34</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">-24.78</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">6227.43</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">1932.63</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">4520.60</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">456.42</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">9025.74</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">2972.60</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-49.63</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-289.39</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">6.47</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">-1.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">144.57</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">79.22</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">32.77</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">23.10</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-0.85</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-37.37</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">32.91</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">3.25</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">30.80</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-247.90</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-514.35</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">-2923.97</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">15.13</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">481.39</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-487.03</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">25.13</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-25.13</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-5710.56</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-11.54</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-8753.40</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-0.02</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">20377.93</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">5.40</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">57.21</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">-58.00</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">18657.43</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-1649.87</value><description><narrative> Project Management and Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-3470.25</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-25.13</value><description><narrative> Strengthened plastics recycling capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-15190.90</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190110-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Developed Action Plan</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-190144</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Accelerating cleantech innovation and entrepreneurship in SMEs to support transition towards a circular economy and create green jobs in South Africa</narrative></title><description type="1"><narrative> The project aims to support the identification, fostering and growth of innovative cleantech solutions by SMES helping them to scale within South Africa and, through the global program, to scale internationally through the provision of commercialization support and links to markets and finance.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-190144"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2020-01-01"/><activity-date type="3" iso-date="2026-12-31"/><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">58485.49</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">27796.99</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">500623.45</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">465930.48</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">1451180.95</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">778860.75</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">43403.01</value></budget><transaction ref="190144-1-01-01-2020-03-1"><transaction-type code="1"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">90000.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-03-4"><transaction-type code="4"/><transaction-date iso-date="2020-03-31"/><value currency="USD" value-date="2020-03-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-04-1"><transaction-type code="1"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-04-4"><transaction-type code="4"/><transaction-date iso-date="2020-04-30"/><value currency="USD" value-date="2020-04-30">31324.08</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-06-1"><transaction-type code="1"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-06-4"><transaction-type code="4"/><transaction-date iso-date="2020-06-30"/><value currency="USD" value-date="2020-06-30">3359.99</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">15908.60</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-08-1"><transaction-type code="1"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-08-4"><transaction-type code="4"/><transaction-date iso-date="2020-08-31"/><value currency="USD" value-date="2020-08-31">506.11</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">6118.13</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">625.82</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-11-1"><transaction-type code="1"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-11-4"><transaction-type code="4"/><transaction-date iso-date="2020-11-30"/><value currency="USD" value-date="2020-11-30">477.15</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">165.61</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">23616.99</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">-5469.87</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">8546.85</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">978.22</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">8.48</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">8.48</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">26.14</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">8.48</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">8.48</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">28.34</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-11-1"><transaction-type code="1"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-11-4"><transaction-type code="4"/><transaction-date iso-date="2021-11-30"/><value currency="USD" value-date="2021-11-30">8.48</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">450000.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">1500000.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">328005.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">958520.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">27.92</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">1934.16</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">13.75</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">25636.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-74044.06</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">47951.06</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">457.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-11.30</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">144.36</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">185054.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">48951.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">189784.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">36005.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">9.60</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">30952.12</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">6545.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">1278.17</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-141.31</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-45.75</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">2.96</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-937.19</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">147.69</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">693.31</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0.00</value><description><narrative> CEO document finalised</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190144-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">47951.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">89921.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">113005.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">182949.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">32104.48</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-7647.99</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">3059.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-0.01</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">4589.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">119550.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">186114.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">28695.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">50451.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">4486.47</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-4.74</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-1.54</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">2767.02</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">9.95</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">25340.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">33787.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">15.26</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">26.87</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-28.17</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">14.19</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">892000.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">34000.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">24000.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">49984.24</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">-25.60</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">218350.00</value><description><narrative> Outp 1.2 Investment &amp; commercialization</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">318755.00</value><description><narrative> Outp 1.1 Cleantech innovations supported</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">111599.00</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">127939.22</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">10.63</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">1241.72</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">951.25</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">28.17</value><description><narrative> Outp 2.1 National ecosystem strengthened</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">24.85</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-271.98</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">181.26</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">34.86</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">5.88</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction><transaction ref="190144-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">10.89</value><description><narrative> Outp 3.1Effective project implementation</narrative></description><recipient-region code="M0" vocabulary="99" vocabulary-uri="https://open.unido.org/download/iati/unido-region.csv"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-190377</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Pipeline development to deploy clean energy technology solutions in municipal wastewater treatment works of South Africa</narrative></title><description type="1"><narrative> Pipeline development to deploy clean energy technology solutions in municipal wastewater treatment works of South Africa</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-190377"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Green Climate Fund</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2021-12-31"/><activity-date type="3" iso-date="2024-05-26"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">149822.42</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">480930.56</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">-1837.05</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">10.78</value></budget><transaction ref="190377-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">38500.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">10786.72</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">106000.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">5220.78</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">38500.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">-68.79</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">106000.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">257.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-73.07</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">19561.38</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">5000.00</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">250000.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">79000.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-13.50</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">250000.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">79000.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">1856.06</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-0.50</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">1857.12</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">-1857.12</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-54.38</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">49.38</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">8731.90</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">33080.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">5905.00</value><description><narrative> Contingency</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Contingency</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">74500.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">74529.00</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">42500.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">42471.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-6.21</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-424.82</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-264.26</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">453.12</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0.01</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-453.12</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">1130.25</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">60.11</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-3374.67</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">1182.94</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">919.60</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-1047.23</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-12.77</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-3297.99</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">10.78</value><description><narrative> Output 2.1: Pipeline Development</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-5905.00</value><description><narrative> Contingency</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Contingency</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">935.80</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0.00</value><description><narrative> Output 1.1: Capacity Building</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">255.52</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-3546.62</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="190377-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Audit</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-200019</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Global Eco-Industrial Parks Programme-South Africa country level intervention</narrative></title><description type="1"><narrative> Under Component one of the Global Eco-Industrial Park Programme (GEIPP)  tailor-made EIP country level interventions in Colombia, Egypt, Indonesia, Peru, Ukraine and Vietnam are to be developed and implemented. The country level EIP interventions have to follow a uniform approach and to deliver 2 outcomes:  Outcome 1: EIP incentivised and mainstreamed in relevant policy and regulations leading to an increased role of EIP in environmental, industry and other relevant policies at the national levels in the participating Programme countries.  Outcome 2:  EIP opportunities identified and implementation started, with environmental (e.g. resource productivity) economic and social benefits achieved by enterprises confirmed. The implementation of EIP opportunities by enterprises and other organisations will be supported by the EIP services providers, and will lead to reduction of the environmental footprint and operational and compliance costs of businesses, and an increase in their - natural - resource productivity  The inclusion of South Africa for country level interventions under the GEIPP was announced by SECO on 30.01.2020</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-200019"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SWITZERLAND</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2020-07-23"/><activity-date type="3" iso-date="2025-02-28"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>East London</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-33.01529 27.91162</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2020-01-01"/><period-end iso-date="2020-12-31"/><value currency="USD" value-date="2020-01-01">55814.73</value></budget><budget><period-start iso-date="2021-01-01"/><period-end iso-date="2021-12-31"/><value currency="USD" value-date="2021-01-01">390594.48</value></budget><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">314388.79</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">454439.80</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">47102.88</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">-2743.35</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">-5262.44</value></budget><transaction ref="200019-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">61690.86</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-07-1"><transaction-type code="1"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">55813.79</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-07-4"><transaction-type code="4"/><transaction-date iso-date="2020-07-31"/><value currency="USD" value-date="2020-07-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">55095.97</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">96676.54</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">90439.57</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-1"><transaction-type code="1"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">90439.57</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-09-4"><transaction-type code="4"/><transaction-date iso-date="2020-09-30"/><value currency="USD" value-date="2020-09-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">22654.93</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-10-1"><transaction-type code="1"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-10-4"><transaction-type code="4"/><transaction-date iso-date="2020-10-31"/><value currency="USD" value-date="2020-10-31">36042.25</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">2415.78</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-12-1"><transaction-type code="1"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">1932.71</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2020-12-4"><transaction-type code="4"/><transaction-date iso-date="2020-12-31"/><value currency="USD" value-date="2020-12-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">119160.15</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">18622.56</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">87530.52</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-1"><transaction-type code="1"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-01-4"><transaction-type code="4"/><transaction-date iso-date="2021-01-31"/><value currency="USD" value-date="2021-01-31">67830.61</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">1216.48</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">115.96</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-02-1"><transaction-type code="1"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-02-4"><transaction-type code="4"/><transaction-date iso-date="2021-02-28"/><value currency="USD" value-date="2021-02-28">4412.58</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">-66.25</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-03-1"><transaction-type code="1"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-03-4"><transaction-type code="4"/><transaction-date iso-date="2021-03-31"/><value currency="USD" value-date="2021-03-31">13211.49</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">-118.32</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">14.42</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-04-1"><transaction-type code="1"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-04-4"><transaction-type code="4"/><transaction-date iso-date="2021-04-30"/><value currency="USD" value-date="2021-04-30">-87.71</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">-13.82</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-05-1"><transaction-type code="1"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-05-4"><transaction-type code="4"/><transaction-date iso-date="2021-05-31"/><value currency="USD" value-date="2021-05-31">101.95</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">-1000.96</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">59560.94</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">-650.60</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-1"><transaction-type code="1"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-06-4"><transaction-type code="4"/><transaction-date iso-date="2021-06-30"/><value currency="USD" value-date="2021-06-30">3094.74</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">-36.37</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">19.94</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">703.35</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-1"><transaction-type code="1"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-07-4"><transaction-type code="4"/><transaction-date iso-date="2021-07-31"/><value currency="USD" value-date="2021-07-31">9.82</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-14703.68</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">-81.74</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-08-1"><transaction-type code="1"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">0.00</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-08-4"><transaction-type code="4"/><transaction-date iso-date="2021-08-31"/><value currency="USD" value-date="2021-08-31">1361.58</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">72423.64</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">34830.76</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">86738.42</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">87696.11</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">-119.20</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">57937.50</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">-1270.24</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">-172.06</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">-878.90</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">-361.34</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">107.20</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">12436.77</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">5939.81</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">138.98</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">40.91</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">51700.72</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-502.40</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">48935.95</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">328.20</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">61990.13</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-573.78</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">32090.09</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">8.68</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">54979.50</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">22.23</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">27.78</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">11.11</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">6427.31</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">22.23</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">1373.14</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">1373.14</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">1716.41</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">686.57</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-39.91</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0.00</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-31.90</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">9981.67</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-31.90</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">6363.40</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">1794.72</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-15.93</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">102296.38</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-96.03</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">40550.41</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-76.80</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0.00</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-554.32</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">36864.50</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-38.41</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">27798.58</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-76.80</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-1000.92</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-90.53</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-3384.80</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-113.18</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-246.59</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">2202.61</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">15333.15</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">28.89</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">4391.02</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">4396.57</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-215.55</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-200.77</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-103.32</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-246.54</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-33.81</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-16.92</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-33.81</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">-3452.52</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0.00</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-60.11</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0.00</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">6994.18</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-60.28</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-208.12</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-12.16</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-42.60</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">205.71</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-12.16</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">18146.35</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">50.31</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">131508.12</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">427.43</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0.01</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">108877.10</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">218.70</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0.00</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">55.97</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-440.97</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">27063.62</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-358.13</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-76.30</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">194870.64</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-573.43</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">128179.90</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-668.34</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">38864.38</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-1839.73</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-2032.86</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-2421.59</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-1276.53</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">12.99</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">54.68</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">62.06</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">85.02</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">299.78</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">5872.70</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0.00</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-127.84</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0.00</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">19236.64</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0.00</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">16593.39</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">-2.95</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">14.89</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">26.76</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">73.19</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">79.47</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-498.07</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-489.09</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">109.47</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-26.71</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-199.59</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0.00</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">6890.47</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0.00</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">55.50</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0.00</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">47.57</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">-19.95</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">5172.97</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">37.78</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">6504.91</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">4790.41</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">5.99</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">3461.34</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0.00</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-1639.79</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">10.01</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">5.89</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">13.64</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">19.61</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">43.19</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-22.65</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">8.91</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-3470.54</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">1522.20</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">50.41</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">16.90</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-57.38</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">166.71</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">26.91</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">4575.15</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">65.72</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">13.02</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">10675.36</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">76.59</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-28.55</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-66.62</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">307.36</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0.00</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">1142.23</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0.00</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">4267.20</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0.00</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">6091.90</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0.00</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">9518.60</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-5.06</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-27.34</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">5628.84</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-30.16</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-3.62</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-19.30</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">83.57</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-310.25</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">956.43</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-309.23</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0.26</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">11.39</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">71.76</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">7.80</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">33.70</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">49.46</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">4249.26</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">160.92</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">11.94</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">1.12</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-656.29</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">3523.64</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">130.37</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">756.55</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">1390.43</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">8420.90</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">-1106.42</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">-7902.62</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">35.58</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">1544.01</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">7.41</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">12377.40</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">24.71</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">33.16</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">52.05</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">240.96</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-2439.02</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-42.85</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.31</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-2.39</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-22.44</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">161.09</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">66.33</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">3.36</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">-423.53</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">-1.20</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">327.33</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-41.62</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-123.80</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-82.36</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-40.82</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-163.29</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-39.35</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-3658.35</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-4318.68</value><description><narrative> Output 2.1 EIP benchmarking &amp; analysis</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-165.12</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.2 EIP capacities strengthened</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-918.16</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.1 Mapping of existing capacity</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-487.28</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200019-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.3 EIP requirements implemented</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-200206</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Sustainable energy systems for urban-industrial development</narrative></title><description type="1"><narrative> South Africa´s high GHG emissions are caused by its heavy reliance on coal. The energy intensive industry sector is significantly contributing to increasing of GHG emissions. Fostering sustainable energy solutions in industrial activities is thus imperative for embarking on a pathway towards decarbonizing the economy. At the same time, due to challenges with integrated urban planning, municipalities in South Africa are expanding in a resource-intensive and inefficient manner. Here, industrial parks (IP) offer a significant potential of addressing the two problems above, by adopting sustainable energy concepts and contributing to the development of more sustainable municipalities.  This project's objective is to reduce GHG emissions and accelerate the decarbonization of industrial parks and other related environmental impacts, by addressing both energy supply and demand side, through an approach that considers the "urban-industrial-energy nexus".</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-200206"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2021-05-01"/><activity-date type="3" iso-date="2026-10-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">35883.90</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">208780.48</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">877910.11</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">146339.89</value></budget><transaction ref="200206-1-01-01-2021-10-1"><transaction-type code="1"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">50000.00</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2021-10-4"><transaction-type code="4"/><transaction-date iso-date="2021-10-31"/><value currency="USD" value-date="2021-10-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">35406.26</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">746.00</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">1760.74</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">-399.32</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-568.70</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">-630.65</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-430.43</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">110400.00</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">50000.00</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">194250.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">549750.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">315322.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-34500.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-27500.00</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-2500.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-30000.00</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-24500.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">27500.00</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">34500.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">2500.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">30000.00</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">24500.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">13154.19</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-129.85</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">42.45</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-20000.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">80000.00</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-58.53</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-40000.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">-20000.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">30900.00</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">2500.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">21250.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">140822.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">300.22</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-807.62</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0.00</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">52000.00</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">40392.75</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">147170.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">485731.25</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">119956.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">23696.05</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">19.23</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">9574.54</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">-1039.10</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">-51.86</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">397.19</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">64.06</value><description><narrative> 4. Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">34500.00</value><description><narrative> Government ensure conducive IPs/SEZs</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">2500.00</value><description><narrative> IP/SEZ management gain confidence</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">27500.00</value><description><narrative> Project Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="200206-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">24500.00</value><description><narrative> Gov. &amp; Fin. Sector enhance invest env.</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-210107</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Strengthened adaptation capacity for a green and resilient economy in South Africa</narrative></title><description type="1"><narrative> South Africa is particularly affected by climate change hazards such as recurring and extensive heat waves and dry spells, rainfall increase and storm surges. The associated impacts of these extreme weather events have a bearing on economic and social aspects of the country#s development. As the country just embarks on a transition to a low-carbon, climate-resilient and environmentally-sustainable economy, a clear window of opportunity exists to accelerate the shift to a domestic green economy. In order to ease the pressure of climate change-related impacts in South Africa while improving the resilience of its economy, this project aims to reduce South Africa#s vulnerability to climate change effects and promote adaptation solutions on energy, water and mobility with particular emphasis on medium to large enterprises. The project will make these critical services more climate resilient through tailored policy support, technology transfer and enhanced cooperation between governments, private sector and academia in South Africa and Flanders. At the national level, the project will strengthen institutional capacity and enhance awareness of the governmental stakeholders. At the local level, the project will involve the public sector (such as municipalities and universities), and the private sector, specifically med</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-210107"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>BELGIUM</narrative></participating-org><participating-org role="1"><narrative>UNIDO</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2021-01-01"/><activity-date type="3" iso-date="2024-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">320901.93</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">365212.00</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">1444416.72</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">-16326.74</value></budget><transaction ref="210107-1-01-01-2021-09-1"><transaction-type code="1"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">12269.95</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2021-09-4"><transaction-type code="4"/><transaction-date iso-date="2021-09-30"/><value currency="USD" value-date="2021-09-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">-919.20</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">47673.11</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">107832.01</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">204313.28</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">147559.60</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">1568.54</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">1176.41</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">1415.33</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">12140.92</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">3292.13</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-590.79</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">-590.79</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-4.81</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">-4.81</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">2270.56</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">283.92</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">260.48</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">29.46</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">12062.47</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">12602.27</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">-82.09</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">3156.63</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">-468.49</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">-34.25</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">1929.76</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">-337.35</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">1495.14</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">500.22</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">1027.31</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">50.23</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">1168.56</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">7042.53</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">5838.85</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">4122.25</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">-21.49</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">74980.48</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">573.86</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">124117.91</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">1304.57</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">702.32</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">93.13</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-8429.07</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">1978.40</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-426.89</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">1215.99</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">2937.86</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">831.53</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-979.73</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">13856.63</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-5577.62</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">22836.87</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-2650.45</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">22277.46</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">-2490.89</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">18389.57</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-310.56</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">-744.59</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">7568.48</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-1"><transaction-type code="1"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-02-4"><transaction-type code="4"/><transaction-date iso-date="2023-02-28"/><value currency="USD" value-date="2023-02-28">308.00</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-2346.40</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">31250.23</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">-2849.24</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">22798.23</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">842.13</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">2084.64</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">1585.96</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">1433.61</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">44728.44</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">13201.04</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">106532.04</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">407.09</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">564466.02</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">1748.25</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">212992.54</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">1411.74</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">5705.19</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">21939.39</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">10635.16</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">2046.51</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">4250.00</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">2788.73</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">2098.07</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">42790.85</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">217.33</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">-966.46</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">35116.22</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">1430.22</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">13815.34</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">3791.28</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">2037.83</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">1328.80</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">1438.36</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">37053.21</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">1955.36</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">47714.87</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-665.45</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-17379.96</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">2031.35</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-2322.37</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-9.60</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">4887.43</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-1187.38</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">-1174.51</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">-2807.14</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">16562.47</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">2495.07</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">35543.58</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">25359.81</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">1374.03</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">6084.15</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">7639.23</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-46.26</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-108.11</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">263092.64</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">28163.46</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">44.35</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">245.01</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">4276.40</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-79.21</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">38845.72</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">50127.63</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">167.32</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">221975.59</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-39.53</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">123196.45</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">7806.73</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">435849.05</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">17939.21</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">57.71</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">5634.45</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">6087.92</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">474.60</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">13006.58</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">27025.50</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">3258.23</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">3240.35</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">55493.90</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">601806.52</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-55493.90</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">67.87</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0.00</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">219.89</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0.00</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">329.59</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">132498.63</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">74985.38</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">170.59</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">220.08</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">5997.06</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">10860.07</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">-12009.89</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">390.44</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">2343.26</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">31912.78</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">38787.41</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">47538.46</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">24725.66</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-196428.75</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">147079.82</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">17688.27</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">15771.78</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">1117.48</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">7445.16</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">12416.91</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">5677.77</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">5529.92</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-1333.77</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-834.89</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-6938.02</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-1326.46</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">-11.26</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-894.54</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">3097.53</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">241.74</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-3365.48</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-10770.92</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-1646.44</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-312.57</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-33.97</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">321.90</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">444.63</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-6070.57</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">-262.40</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">177.16</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">-3215.95</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">164.44</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">66.62</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">-7780.38</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">249.34</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">794.18</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">39.17</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">4424.44</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">23.86</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">82.85</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">215.40</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">-833.07</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">-669.11</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">1045.01</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">-155.18</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">-80.60</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">507.14</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">1739.46</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-3959.65</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">768.21</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-1577.04</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-190010.91</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0.00</value><description><narrative> Application of RE, EE&amp;water use efficien</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-19068.15</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Project Management, Monitoring&amp;Self-eval</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-4798.11</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-14.35</value><description><narrative> Indus. innovation on climate adaptation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-2273.52</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Scaling-up of climate-resilient services</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-6864.19</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210107-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Independent terminal evaluation</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-210218</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Kigali HFC implementation plan (stage I)</narrative></title><description type="1"><narrative> Preparation of an HFC phase-down plan</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-210218"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2021-09-24"/><activity-date type="3" iso-date="2027-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2022-01-01"/><period-end iso-date="2022-12-31"/><value currency="USD" value-date="2022-01-01">50143.17</value></budget><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">89212.91</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">17115.61</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">63659.85</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">199868.46</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">760082.00</value></budget><budget><period-start iso-date="2028-01-01"/><period-end iso-date="2028-12-31"/><value currency="USD" value-date="2028-01-01">760082.00</value></budget><transaction ref="210218-1-01-01-2021-12-1"><transaction-type code="1"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">220000.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2021-12-4"><transaction-type code="4"/><transaction-date iso-date="2021-12-31"/><value currency="USD" value-date="2021-12-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-01-1"><transaction-type code="1"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-01-4"><transaction-type code="4"/><transaction-date iso-date="2022-01-31"/><value currency="USD" value-date="2022-01-31">34500.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-02-1"><transaction-type code="1"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-02-4"><transaction-type code="4"/><transaction-date iso-date="2022-02-28"/><value currency="USD" value-date="2022-02-28">115.20</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-03-1"><transaction-type code="1"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-03-4"><transaction-type code="4"/><transaction-date iso-date="2022-03-31"/><value currency="USD" value-date="2022-03-31">57.60</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-04-1"><transaction-type code="1"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-04-4"><transaction-type code="4"/><transaction-date iso-date="2022-04-30"/><value currency="USD" value-date="2022-04-30">57.60</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-05-1"><transaction-type code="1"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-05-4"><transaction-type code="4"/><transaction-date iso-date="2022-05-31"/><value currency="USD" value-date="2022-05-31">57.60</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-06-1"><transaction-type code="1"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-06-4"><transaction-type code="4"/><transaction-date iso-date="2022-06-30"/><value currency="USD" value-date="2022-06-30">57.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-07-1"><transaction-type code="1"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-07-4"><transaction-type code="4"/><transaction-date iso-date="2022-07-31"/><value currency="USD" value-date="2022-07-31">1888.56</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-08-1"><transaction-type code="1"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-08-4"><transaction-type code="4"/><transaction-date iso-date="2022-08-31"/><value currency="USD" value-date="2022-08-31">9164.23</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-09-1"><transaction-type code="1"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">0.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-09-4"><transaction-type code="4"/><transaction-date iso-date="2022-09-30"/><value currency="USD" value-date="2022-09-30">931.60</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-10-1"><transaction-type code="1"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-10-4"><transaction-type code="4"/><transaction-date iso-date="2022-10-31"/><value currency="USD" value-date="2022-10-31">6359.83</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-11-1"><transaction-type code="1"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-11-4"><transaction-type code="4"/><transaction-date iso-date="2022-11-30"/><value currency="USD" value-date="2022-11-30">-1989.43</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-12-1"><transaction-type code="1"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2022-12-4"><transaction-type code="4"/><transaction-date iso-date="2022-12-31"/><value currency="USD" value-date="2022-12-31">-1056.62</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-01-1"><transaction-type code="1"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">0.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-01-4"><transaction-type code="4"/><transaction-date iso-date="2023-01-31"/><value currency="USD" value-date="2023-01-31">7560.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-03-1"><transaction-type code="1"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-03-4"><transaction-type code="4"/><transaction-date iso-date="2023-03-31"/><value currency="USD" value-date="2023-03-31">20.13</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">5603.39</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">-108.82</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-1023.31</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">77161.52</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">17035.53</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">17.87</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">31.08</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">31.13</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-41.84</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">35770.13</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">22.56</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">4327.37</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">8700.90</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">7148.40</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">52.88</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">-37.25</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0.00</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">7594.64</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">67627.00</value><description><narrative> Commercial refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Commercial refrigeration</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">1495037.00</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">30000.00</value><description><narrative> Local installation &amp; assembly</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Local installation &amp; assembly</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">127500.00</value><description><narrative> PMU</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> PMU</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">122.06</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">17275.44</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-6372.73</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">7367.67</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">5874.74</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">12974.00</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">30.37</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">4289.01</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">38369.32</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">-9.01</value><description><narrative> Preparation of an HFC phase-down plan</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">1842.19</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">5739.65</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="210218-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">4802.75</value><description><narrative> Stage I, Tranche I</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-220086</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Enhancing the institutional capacity of South Africa to  coordinate green hydrogen activities of the Hydrogen Society Roadmap</narrative></title><description type="1"><narrative> The Readiness Programme seeks to enhance the readiness of South Africa#s Government to coordinate and implement green hydrogen related activities of the Hydrogen Society Roadmap.The programme further aims to develop a 'South-African International Hydrogen Energy Centre', promote enabling regulatory framework for environmental and social safeguards, conduct a pre-feasibility study for decarbonising Ground Support Vehicles at Or Tambo International Airport in cooperation with Airports Company South Africa, and develop a Guidebook for hydrogen innovation and R&lt;(&gt;&amp;&lt;)&gt;D commercialisation for publicly-funded IP.  The project commenced at 14.07.2023 and planned for completion at 30.04.2026.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-220086"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Green Climate Fund</narrative></participating-org><activity-status code="4"/><activity-date type="1" iso-date="2023-01-01"/><activity-date type="3" iso-date="2026-04-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">156046.44</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">131639.08</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">170280.48</value></budget><transaction ref="220086-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">77000.00</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">56000.00</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">120000.00</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">31140.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">91600.00</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">704.99</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-45.12</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">9630.01</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">10023.07</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">584.53</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">31.30</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">13.33</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">45.58</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-2.48</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">86.79</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">2608.53</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">217.30</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">2825.87</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">3741.44</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">162.98</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">967.27</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">119941.73</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-73.40</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">2674.09</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">77.90</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">505.06</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">152.13</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">1169.47</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">4.07</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">3327.45</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">3327.45</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">12707.99</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">4645.58</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-9.11</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">99.42</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">10335.55</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">12.05</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-3.68</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">8730.42</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">6395.80</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">1593.60</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">8193.57</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">597.63</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">2958.87</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">12241.57</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">3509.59</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-65.92</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">769.15</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">2199.90</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">201.12</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">2124.06</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">442.94</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">5.53</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">399.37</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">-811.12</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">1045.00</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0.00</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">2892.94</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-1045.00</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">1469.33</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0.00</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">1947.23</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0.00</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">2229.38</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-120.85</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-156.04</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-2.21</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-30.34</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">116.48</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">14093.94</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">93.02</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">12.05</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">945.15</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">24220.22</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">21451.15</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">31.92</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">21561.74</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">201.67</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-546.00</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-17568.76</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">2518.49</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">4662.37</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">71000.00</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">17891.67</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">1197.53</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-31.92</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">1024.00</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">151.81</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">7031.98</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">21699.33</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">534.99</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">6252.62</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">4.13</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">49595.68</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-398.88</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">554.25</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">109.15</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">17857.31</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-5930.35</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-140.65</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">30.36</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">92.63</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-1537.88</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">50.27</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">178.52</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">118.87</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">6.86</value><description><narrative> Project Management Cost</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">29.15</value><description><narrative> Output 1.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">1153.60</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">-155.21</value><description><narrative> Output 2.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">-2448.82</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">965.12</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">-151.62</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">-15528.58</value><description><narrative> Output 2.2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">-886.72</value><description><narrative> Output 3.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220086-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">67.95</value><description><narrative> Output 4.1.1</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-220187</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Global Eco-Industrial Park Programme II-South Africa country level intervention</narrative></title><description type="1"><narrative> Under Component 2 of the 2nd phase of the Global Eco-Industrial Park Programme (GEIPP II) the implementation of tailor-made EIP country level interventions in Colombia, Egypt, Indonesia, Peru South Africa and Viet Nam will be continued. The continued country level EIP interventions have to follow a uniform approach and to deliver 2 outcomes:  Outcome 1: EIP incentivised and mainstreamed in relevant policy and regulations leading to an increased role of EIP in environmental, industry and other relevant policies at the national levels in the participating Programme countries.  Outcome 2:  EIP opportunities identified and implementation started, with environmental (e.g. resource productivity) economic and social benefits achieved by enterprises confirmed. The implementation of EIP opportunities by enterprises and other organisations will be supported by the EIP services providers, and will lead to reduction of the environmental footprint and operational and compliance costs of businesses, and an increase in their - natural - resource productivity.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-220187"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SWITZERLAND</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2024-01-01"/><activity-date type="3" iso-date="2028-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">315301.86</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">62715.74</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">817047.81</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">802870.18</value></budget><budget><period-start iso-date="2028-01-01"/><period-end iso-date="2028-12-31"/><value currency="USD" value-date="2028-01-01">174067.68</value></budget><transaction ref="220187-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">30035.52</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">51570.48</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">58370.71</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">55974.27</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">83252.80</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">87419.94</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">7107.39</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">7107.39</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">23.43</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">23.42</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">112.06</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">112.05</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">351.37</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">16777.66</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">68788.61</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">69250.82</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">42278.20</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">32996.71</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">46977.00</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">289.94</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">289.94</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">3634.36</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">3634.36</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">527.61</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">36170.92</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">9782.39</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">28.68</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">4.09</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">16916.76</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0.00</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">28.88</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">35702.55</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">55.51</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">191.05</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">105.43</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-55.31</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">44.77</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">183.49</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">79.02</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">6.98</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">-35.22</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">46.09</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">3164.01</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">3249.92</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">3164.01</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">3634.36</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">29528.99</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">28730.01</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">51275.68</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">2445.18</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">34795.26</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">54.53</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">38512.70</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">54.54</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">96996.95</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">15353.78</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">64.41</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">297.33</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-89.92</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">-89.92</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">1132.27</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">6936.55</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">5237.21</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">23.69</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">425.33</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">35.05</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">-45.54</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">330.11</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">7409.01</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">733.08</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">324.26</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">50.53</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">44.26</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">7708.94</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">72.22</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">129.38</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">775.74</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">49.96</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">5445.72</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">547.38</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">3270.95</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">1918.52</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">3297.14</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-553.52</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">35.62</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">46.21</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">423.53</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">-33.32</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">1709.41</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">9830.84</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">3856.91</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">20370.27</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">1351.29</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">1348.04</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">4915.42</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">1746.88</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">1681.68</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">9830.84</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">3529.41</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">34.69</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">115294.12</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">5027.32</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">17647.06</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">17.36</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">30750.10</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">17647.06</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">34.69</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">38795.78</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">69211.01</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">58533.06</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">48180.18</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">35894.97</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">39200.03</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">138853.60</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">5771.84</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">2739.05</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">8321.83</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">12088.21</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-94.68</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">128.76</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">680.22</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">263.56</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">1751.19</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">21160.88</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">1865.47</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">10552.60</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">256.25</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">1.98</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">55.18</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">-1394.89</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">14256.04</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">230552.93</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 1.3. Supporting EIP replication</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">178761.57</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">219.07</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">81244.73</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">-6.29</value><description><narrative> Output 2.1: Consolidation of cooperation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">116746.28</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">213.38</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">323114.32</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">448.01</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">257017.29</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">5.90</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">99.19</value><description><narrative> Output 2.2: Up-scaling EIP opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">29.29</value><description><narrative> Output 1.1: Integration of EIP</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">8442.74</value><description><narrative> Output 1.2. National EIP recognition</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220187-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">7.61</value><description><narrative> Output 2.3: Country-wide facilitation of</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-220245</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Augmented and virtual reality applications for the inclusive development and enhanced competitiveness of South African industries</narrative></title><description type="1"><narrative> The Tshwane University of Technology in conjunction with the Black Business Council has expressed UNIDO's support in the application of 4th industrial revolution technologies for industry in South Africa</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-220245"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Regular Programme Of Technical Cooperati</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2023-01-02"/><activity-date type="3" iso-date="2028-08-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">24699.08</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">-84.35</value></budget><transaction ref="220245-1-01-01-2023-04-1"><transaction-type code="1"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">24840.25</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-04-4"><transaction-type code="4"/><transaction-date iso-date="2023-04-30"/><value currency="USD" value-date="2023-04-30">11204.04</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-05-1"><transaction-type code="1"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-05-4"><transaction-type code="4"/><transaction-date iso-date="2023-05-31"/><value currency="USD" value-date="2023-05-31">5279.78</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">7209.36</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">-142.83</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">1580.62</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">134.93</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-11.96</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">3.60</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">4.03</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-226.44</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="220245-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-83.42</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-230070</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Global Quality and Standards Programme South Africa, phase II: unlocking the export potential of essential and vegetable oils</narrative></title><description type="1"><narrative> Since September 2018, the Global Quality Standards Programme (GQSP) has focused on strengthening the South African essential and vegetable oils value chain by leveraging the services of the enablers, which includes the National Quality Infrastructure (NQI), and strengthening conformity assessment services, supporting SME compliance to international standards and technical regulation and generally focus on promoting a culture of quality.  The aim was to facilitate sustainable, profitable, and competitive market access for SMEs within the essential and vegetable oils sector by strengthening the quality of essential and vegetable oils exports from South Africa. Whilst the focus was on South Africa, other SADC Member States also participated and benefitted from events, webinars, conferences and training.  The GQSP-SA Phase II project will intensify the support to develop the essential and vegetable oils value chain with new systems and technologies whilst building on the foundation and success of the GQSP-SA Phase I project. Phase II aims to further strengthen the South(ern) African essential and vegetable oils value chain to enable sustainable and competitive market access for Small and Medium Size Enterprises (SMEs). Following a series of consultations with stakeholders, there was general agreement that the suppo</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-230070"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>SWITZERLAND</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2023-05-31"/><activity-date type="3" iso-date="2027-05-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">98579.12</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">337615.35</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">243010.36</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">429585.91</value></budget><transaction ref="230070-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">104947.91</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">785.09</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">45134.65</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">12262.02</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">78961.20</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">24753.15</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-1"><transaction-type code="1"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">62170.36</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-06-4"><transaction-type code="4"/><transaction-date iso-date="2023-06-30"/><value currency="USD" value-date="2023-06-30">25386.84</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">2150.75</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">5289.73</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">79.10</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">129.63</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">4747.61</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-08-1"><transaction-type code="1"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-08-4"><transaction-type code="4"/><transaction-date iso-date="2023-08-31"/><value currency="USD" value-date="2023-08-31">64.82</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">2839.49</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">5632.65</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">5500.93</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">1454.49</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">2461.29</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">-1.37</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">1597.35</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">2461.97</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-3192.61</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">12.95</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-26102.95</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">6.64</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">29348.98</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">24.25</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-1"><transaction-type code="1"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">-4.32</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-11-4"><transaction-type code="4"/><transaction-date iso-date="2023-11-30"/><value currency="USD" value-date="2023-11-30">20.92</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">134.12</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">82.17</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">158.41</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">2032.07</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">201.14</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">19238.19</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">413.70</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">36071.66</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">226.63</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">19739.10</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">148.85</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">26809.50</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-77.16</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-118.47</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">13.75</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">-142.09</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">2546.68</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">-20.99</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">420.02</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">2530.24</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">114859.79</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">10714.52</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">101856.20</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">7552.01</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">87585.35</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">-45.06</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">136150.01</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">9800.38</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">26600.60</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-33.50</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">-64.89</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">1596.69</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">14365.26</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">42901.01</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">28749.35</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">6771.29</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">16885.35</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">2062.76</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">1615.83</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">9677.89</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">23.29</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">633.63</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">-147.24</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">100.42</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">3946.39</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">6311.50</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">7157.42</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">2483.61</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">18161.72</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">165.24</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">923.86</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">353.72</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-151.23</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">761.89</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">2525.10</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">271.48</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">398.28</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">1331.19</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">-44.18</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">308.58</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">33480.72</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">19315.19</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">34677.92</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">17944.71</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-818.96</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">8.13</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">311.74</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-284.18</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-694.93</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">12.49</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-3648.08</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">936.74</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">1475.74</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">175.49</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">341.74</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">537.18</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">75606.06</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">17941.53</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">127272.73</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">36109.35</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">52522.06</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">1516.80</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">97379.27</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">35744.10</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">8636.93</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">4412.44</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">984.48</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">411.59</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">5033.92</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">247.11</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">316.87</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">7551.30</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">844.38</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">634.51</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">1222.55</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">2394.65</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">639.78</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">258.96</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">670.39</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">459.34</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">6503.67</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">8456.78</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">4778.96</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">6779.51</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">3254.43</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">644.60</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-255.62</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">799.02</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">18.83</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">277.95</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">530.56</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">298.99</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">231.16</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">-276.04</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">-3431.32</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">429.24</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">5103.51</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">34113.43</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">3970.60</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">25624.14</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">6343.03</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">19502.65</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">12738.82</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">19567.58</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">818.03</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">2149.14</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">132.27</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">1815.65</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">776.46</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">6.60</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">1956.18</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-33.83</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-200.92</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">53.90</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">5650.92</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-98.17</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">1336.90</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">29457.95</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">30297.61</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">14829.39</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">327.24</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">374.53</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">14537.16</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">36710.04</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">10240.44</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">-94.10</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">7040.97</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">337.65</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">-12949.66</value><description><narrative> Output 2.4 Management &amp; Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">-35.27</value><description><narrative> Output 2.2  Enhance SME Compliance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">187.74</value><description><narrative> Output 2.3 Policy &amp; quality culture</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230070-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">195.53</value><description><narrative> Output 2.1 Strengthening QI</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-230071</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Circular solutions to plastic pollution in South Africa</narrative></title><description type="1"><narrative> Circular solutions to plastic pollution in South Africa is a Child project of the GEF's Integrated Program of Circular solutions to plastic pollution. It will focus on upstream and midstream of plastic packaging value chains.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-230071"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2023-06-30"/><activity-date type="3" iso-date="2030-05-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2023-01-01"/><period-end iso-date="2023-12-31"/><value currency="USD" value-date="2023-01-01">133807.27</value></budget><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">35684.21</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">1231644.50</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">1300730.56</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">1538708.00</value></budget><budget><period-start iso-date="2028-01-01"/><period-end iso-date="2028-12-31"/><value currency="USD" value-date="2028-01-01">2790053.00</value></budget><transaction ref="230071-1-01-01-2023-07-1"><transaction-type code="1"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">200000.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2023-07-4"><transaction-type code="4"/><transaction-date iso-date="2023-07-31"/><value currency="USD" value-date="2023-07-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2023-09-1"><transaction-type code="1"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2023-09-4"><transaction-type code="4"/><transaction-date iso-date="2023-09-30"/><value currency="USD" value-date="2023-09-30">131945.27</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2023-10-1"><transaction-type code="1"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2023-10-4"><transaction-type code="4"/><transaction-date iso-date="2023-10-31"/><value currency="USD" value-date="2023-10-31">1862.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-01-1"><transaction-type code="1"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">0.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-01-4"><transaction-type code="4"/><transaction-date iso-date="2024-01-31"/><value currency="USD" value-date="2024-01-31">14643.54</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-02-1"><transaction-type code="1"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-02-4"><transaction-type code="4"/><transaction-date iso-date="2024-02-29"/><value currency="USD" value-date="2024-02-29">4125.57</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">6027.86</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">167.76</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-05-1"><transaction-type code="1"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-05-4"><transaction-type code="4"/><transaction-date iso-date="2024-05-31"/><value currency="USD" value-date="2024-05-31">923.46</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">2346.31</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">11.55</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">42.77</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">4736.19</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">4004.04</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-4.76</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">-1340.08</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">1285.64</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">0.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">1324.05</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">6.51</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">1176110.00</value><description><narrative> Component 5</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Component 5</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">222666.00</value><description><narrative> Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">353675.00</value><description><narrative> Component 4</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Component 4</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">3460581.00</value><description><narrative> Component 3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Component 3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">80000.00</value><description><narrative> Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">308474.00</value><description><narrative> Component 2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Component 2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">906446.00</value><description><narrative> Component 1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> Component 1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-1"><transaction-type code="1"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">325687.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-03-4"><transaction-type code="4"/><transaction-date iso-date="2025-03-31"/><value currency="USD" value-date="2025-03-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">6.51</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">60030.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Component 1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">114554.00</value><description><narrative> Component 1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Component 2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">39682.00</value><description><narrative> Component 2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Component 3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">651383.00</value><description><narrative> Component 3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">39500.00</value><description><narrative> Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Component 4</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">57146.00</value><description><narrative> Component 4</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">0</value><description><narrative> Component 5</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">241451.00</value><description><narrative> Component 5</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">6600.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">1677.06</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">34.05</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">10133.34</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">5866.02</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">570.19</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">395.13</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">59015.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">41870.00</value><description><narrative> Monitoring</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Component 5</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">215042.00</value><description><narrative> Component 5</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Component 4</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">87050.00</value><description><narrative> Component 4</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Component 3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">636204.00</value><description><narrative> Component 3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Component 2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">51642.00</value><description><narrative> Component 2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Component 1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">210309.00</value><description><narrative> Component 1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">16.77</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">-293.77</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-3011.46</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230071-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-124.44</value><description><narrative> Project document prepared</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-230229</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Supporting the just energy transition in South Africa by strengthening local value chains and enhancing quality assurance for electric vehicle batteries</narrative></title><description type="1"><narrative> The project#s objective is to mitigate GHG emissions through enhancing quality infrastructure to accelerate the development of low carbon electric mobility market and value chains in South Africa. The project will support the policy framework and the development of quality infrastructure to promote local manufacturing of electric vehicle (EV) components such as batteries, and improving battery end-of-life management. Besides GHG emissions mitigation, the project will help develop green skills and create new jobs in line with the just energy transition policy of South Africa.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-230229"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2026-07-01"/><activity-date type="3" iso-date="2031-06-30"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Cape Town</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-33.92584 18.42322</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">29233.78</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">73516.22</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">261700.00</value></budget><budget><period-start iso-date="2028-01-01"/><period-end iso-date="2028-12-31"/><value currency="USD" value-date="2028-01-01">243392.00</value></budget><budget><period-start iso-date="2029-01-01"/><period-end iso-date="2029-12-31"/><value currency="USD" value-date="2029-01-01">218450.00</value></budget><transaction ref="230229-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">50000.00</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">6013.76</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">28.95</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">14926.14</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">136.68</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">3903.53</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">3845.81</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">378.91</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">19625.87</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">392.95</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-1.62</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">259.07</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">78250.00</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> PMC</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">41500.00</value><description><narrative> 4.2 Terminal Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 4.2 Terminal Evaluation</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">2250.00</value><description><narrative> 4.1 Monitoring &amp; Reporting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 4.1 Monitoring &amp; Reporting</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">161192.00</value><description><narrative> 3.2 Feasibility studies</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 3.2 Feasibility studies</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">75000.00</value><description><narrative> 3.1 Assessments of invest. opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 3.1 Assessments of invest. opportunities</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">35800.00</value><description><narrative> 2.3 Communication &amp; awareness</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 2.3 Communication &amp; awareness</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">104750.00</value><description><narrative> 2.2 Training workshops &amp; study tours</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 2.2 Training workshops &amp; study tours</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">89000.00</value><description><narrative> 2.1 Skills dev programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 2.1 Skills dev programme</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">40000.00</value><description><narrative> 1.3 Roadmap and guidelines EoL</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 1.3 Roadmap and guidelines EoL</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">135000.00</value><description><narrative> 1.2 Pilot testing and certification</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 1.2 Pilot testing and certification</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">100500.00</value><description><narrative> 1.1 Policy framework and quality infr.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> 1.1 Policy framework and quality infr.</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230229-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">445.93</value><description><narrative> PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-230351</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>SAF_KIP Energy Efficiency strategy</narrative></title><description type="1"><narrative> The project aims to accelerate the phase-down of HFC and increase Energy Efficiency in South Africa's refrigeration and air-conditioning service sector and contribute to a reduction in greenhouse gas emissions. By addressing the slow decline in HCFC consumption in the service sector and the challenges associated with HFC alternatives, this initiative aligns with the HPMP Stage II Strategy, the Kigali Implementation Plan (in preparation), and national energy efficiency objectives. The project seeks to identify barriers to alternative refrigerant adoption, quantify potential energy efficiency improvements, develop guidance on suitable technologies, and enhance local capacity for environmentally friendly alternatives.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-230351"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2024-01-01"/><activity-date type="3" iso-date="2026-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Pretoria</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-25.74486 28.18783</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">12668.50</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">337331.50</value></budget><transaction ref="230351-1-01-01-2023-12-1"><transaction-type code="1"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">350000.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2023-12-4"><transaction-type code="4"/><transaction-date iso-date="2023-12-31"/><value currency="USD" value-date="2023-12-31">0.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">12168.35</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">350.15</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="230351-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">150.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-240050</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Fostering low carbon and positive energy industrial spaces to accelerate the just energy transition in South Africa</narrative></title><description type="1"><narrative> The project aims to support the low carbon transformation of South Africa#s Industrial Sector by promoting optimization of energy co nsumption and the enhanced embedded generation of distributed renewable energy in Industrial Spaces.  The project will achieve this through: - Facilitating the creation of an enabling environment through conducting policy analysis, identifying gaps and proposing policy rec ommendations, carrying out assessments, developing guidelines, increasing capacity and forging partnerships.  -Showcasing the potential for renewable energy generation and energy management systems to trigger investments into these Industrial Spaces.  The project will support the development of an investment ready pipeline of projects and implement pilot projects to showcase sustainable business models and the benefits of the Low Carbon Positive Energy industrial Spaces approach.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-240050"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>BELGIUM</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2024-08-31"/><activity-date type="3" iso-date="2028-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Cape Town</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-33.92584 18.42322</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">254746.04</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">886456.63</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">1729.26</value></budget><transaction ref="240050-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">246646.46</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">11340.67</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">96848.06</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">66708.86</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-04-1"><transaction-type code="1"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">263451.86</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-04-4"><transaction-type code="4"/><transaction-date iso-date="2025-04-30"/><value currency="USD" value-date="2025-04-30">29916.64</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">1241.97</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">3142.54</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">3967.89</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">2368.60</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">19170.54</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">6463.19</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">1722.35</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">133.16</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">273.81</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">79.41</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">150.42</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">468.32</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">5838.69</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">8543.13</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">168.47</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">512.93</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">1012.08</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">67.80</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">246.90</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">539.85</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">88.44</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">-6673.10</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">135.88</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">125453.67</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">-2738.02</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">4905.64</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">2439.76</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">112957.21</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">15759.41</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">112957.20</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">25981.55</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">10392.39</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">13251.13</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">3846.37</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-157.66</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-20.64</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">29795.58</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-5.24</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">7100.55</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">-110.31</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">248.13</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">163491.61</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">31928.22</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">321738.67</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">23032.53</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">35294.12</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">7779.60</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">18064.95</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">20790.67</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">6204.10</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">2315.10</value><description><narrative> Demonstration of business models</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">8443.42</value><description><narrative> Enabling policy environment for DRE</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240050-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">77.14</value><description><narrative> Project Management</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-240067</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Child project of the Global clean hydrogen program of South Africa</narrative></title><description type="1"><narrative> The present Child Project of South Africa is part of the Global Clean Hydrogen Programme (GEF-8). This project aims to enhancing national institutional capacities, enabling policy frameworks, improving technological readiness at industrial level, and financial mechanisms for the successful uptake of clean hydrogen in South Africa, to ensure its net zero development with social considerations and benefits.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-240067"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> GEF - Global Environment Facility</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2024-03-26"/><activity-date type="3" iso-date="2029-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">48235.48</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">121904.32</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">107550.00</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">359092.00</value></budget><budget><period-start iso-date="2028-01-01"/><period-end iso-date="2028-12-31"/><value currency="USD" value-date="2028-01-01">210800.00</value></budget><budget><period-start iso-date="2029-01-01"/><period-end iso-date="2029-12-31"/><value currency="USD" value-date="2029-01-01">65150.00</value></budget><transaction ref="240067-1-01-01-2024-03-1"><transaction-type code="1"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">50000.00</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-03-4"><transaction-type code="4"/><transaction-date iso-date="2024-03-31"/><value currency="USD" value-date="2024-03-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-04-1"><transaction-type code="1"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-04-4"><transaction-type code="4"/><transaction-date iso-date="2024-04-30"/><value currency="USD" value-date="2024-04-30">13667.35</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-06-1"><transaction-type code="1"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-06-4"><transaction-type code="4"/><transaction-date iso-date="2024-06-30"/><value currency="USD" value-date="2024-06-30">5654.11</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">-1909.85</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">30362.15</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">69.22</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-10-1"><transaction-type code="1"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-10-4"><transaction-type code="4"/><transaction-date iso-date="2024-10-31"/><value currency="USD" value-date="2024-10-31">35.40</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-11-1"><transaction-type code="1"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">0.00</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-11-4"><transaction-type code="4"/><transaction-date iso-date="2024-11-30"/><value currency="USD" value-date="2024-11-30">-20.91</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">378.01</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">1000.00</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">287.46</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">32500.00</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">10000.00</value><description><narrative> Output 6.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 6.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">78000.00</value><description><narrative> Output 7.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 7.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">59050.00</value><description><narrative> Output 5.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 5.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">60000.00</value><description><narrative> Output 5.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 5.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">134000.00</value><description><narrative> Output 4.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 4.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">172192.00</value><description><narrative> Output 3.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 3.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">50000.00</value><description><narrative> Output 3.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 3.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">24000.00</value><description><narrative> Output 2.3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.3</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">84500.00</value><description><narrative> Output 2.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">50000.00</value><description><narrative> Output 2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">49500.00</value><description><narrative> Output 1.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">59500.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-510.20</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-33.15</value><description><narrative> PA Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 1.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">40000.00</value><description><narrative> Output 1.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 5.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">13050.00</value><description><narrative> Output 5.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">50000.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 7.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">15600.00</value><description><narrative> Output 7.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 6.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">2000.00</value><description><narrative> Output 6.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">50000.00</value><description><narrative> Output 2.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 1.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">9500.00</value><description><narrative> Output 1.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">9500.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 5.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">9700.00</value><description><narrative> Output 5.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 7.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">15600.00</value><description><narrative> Output 7.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Output 6.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">2000.00</value><description><narrative> Output 6.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">2887.97</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">22.54</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240067-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">-168.24</value><description><narrative> Output 6.2</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-240180</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Accelerating South Africa#s Steel Decarbonization</narrative></title><description type="1"><narrative> Focusing on the steel sector, the project catalyzes the industrial decarbonization in South Africa through developing policy frameworks and supporting the shift to near-zero emission steel production. The project will be submitted to the Mitigation Action Facility (MAF) for funding of 25 M EUR. This is a competitive call and the submission will be in collaboration with the consulting firm, Guidehouse Germany GmbH, as well as with the local partners being the DBSA and the IDC.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-240180"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Regular Programme Of Technical Cooperati</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2024-07-01"/><activity-date type="3" iso-date="2029-08-31"/><location><location-reach code="1"/><location-id code="AO" vocabulary="A4"/><name><narrative>Angola</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-11.202692 17.873887</pos></point></location><location><location-reach code="1"/><location-id code="AO" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2024-01-01"/><period-end iso-date="2024-12-31"/><value currency="USD" value-date="2024-01-01">12698.92</value></budget><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">6490.82</value></budget><transaction ref="240180-1-01-01-2024-07-1"><transaction-type code="1"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">20488.34</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-07-4"><transaction-type code="4"/><transaction-date iso-date="2024-07-31"/><value currency="USD" value-date="2024-07-31">12305.43</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-08-1"><transaction-type code="1"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">0</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-08-4"><transaction-type code="4"/><transaction-date iso-date="2024-08-31"/><value currency="USD" value-date="2024-08-31">50.15</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-09-1"><transaction-type code="1"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">0</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-09-4"><transaction-type code="4"/><transaction-date iso-date="2024-09-30"/><value currency="USD" value-date="2024-09-30">69.13</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-12-1"><transaction-type code="1"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">0</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2024-12-4"><transaction-type code="4"/><transaction-date iso-date="2024-12-31"/><value currency="USD" value-date="2024-12-31">-128.00</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-01-1"><transaction-type code="1"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">0</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-01-4"><transaction-type code="4"/><transaction-date iso-date="2025-01-31"/><value currency="USD" value-date="2025-01-31">6269.38</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-02-1"><transaction-type code="1"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">-478.72</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-02-4"><transaction-type code="4"/><transaction-date iso-date="2025-02-28"/><value currency="USD" value-date="2025-02-28">57.12</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">37.20</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">-819.88</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction><transaction ref="240180-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output-1 - PA Create concept</narrative></description><recipient-country code="AO"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-240409</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Accelerating South Africa's steel decarbonization</narrative></title><description type="1"><narrative> Focusing on the steel sector, the project catalyzes the industrial decarbonization in South Africa through developing policy frameworks and supporting the shift to near-zero emission steel production. The project will be submitted to the Mitigation Action Facility (MAF) for funding of 25 M EUR. This is a competitive call and the submission will be in collaboration with the consulting firm, Guidehouse Germany GmbH, as well as with the local partners being the DBSA and the IDC.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-240409"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative>GERMANY</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2025-04-01"/><activity-date type="3" iso-date="2030-01-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">240483.52</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">119872.16</value></budget><transaction ref="240409-1-01-01-2025-05-1"><transaction-type code="1"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">346875.01</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-05-4"><transaction-type code="4"/><transaction-date iso-date="2025-05-31"/><value currency="USD" value-date="2025-05-31">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-06-1"><transaction-type code="1"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-06-4"><transaction-type code="4"/><transaction-date iso-date="2025-06-30"/><value currency="USD" value-date="2025-06-30">9932.06</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">204460.24</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-08-1"><transaction-type code="1"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-08-4"><transaction-type code="4"/><transaction-date iso-date="2025-08-31"/><value currency="USD" value-date="2025-08-31">18939.83</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">44990.37</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">-10822.80</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-320.07</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">13752.70</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">2498.21</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">-272.03</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">109992.08</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">10417.91</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">-6127.69</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">3503.47</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">3120.02</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="240409-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">-176.85</value><description><narrative> Output 1 - PA Create Concept</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-250208</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Institutional strengthening project</narrative></title><description type="1"><narrative> Institutional strengthening (IS) projects have been funded by the Executive Committee since its 7th meeting to provide financial support to Article 5 countries to strengthen their capacity to facilitate expeditious and effective implementation of ozone depleting substances (ODS) phase-out projects, ensuring liaison between the country concerned, the Executive Committee, the Fund Secretariat, and the implementing agencies. These projects have been were fundamental in ensuring wide compliance with the Montreal Protocol. In Armenia, the institutional strengthening project has several objectives, as following: (1) Adoption/implementation of legislation and regulation to control and monitor the imports and use of Montreal Protocol controlled substances and equipment; (2) Accurate and timely data collection and reporting of consumption of all Montreal Protocol controlled substances; (3) Strengthening coordination between national agencies/stakeholders to support the objectives of the Montreal Protocol; (4) Supervision of timely implementation of HCFC phase out/HFC phase down activities and the resulting reduction in consumption of controlled substances; (5) Promoting awareness raising and information exchange on relevant issues of the Montreal Protocol; (6) Regional cooperation and participation in Montreal Protocol</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-250208"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2025-06-17"/><activity-date type="3" iso-date="2030-12-31"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">121593.34</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">378406.66</value></budget><transaction ref="250208-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">500000.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">1224.18</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-09-1"><transaction-type code="1"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-09-4"><transaction-type code="4"/><transaction-date iso-date="2025-09-30"/><value currency="USD" value-date="2025-09-30">80622.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">26206.67</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">11207.90</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">2332.59</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">-794.00</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">18852.97</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">13590.76</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">-2872.63</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">6044.10</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">14924.16</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">2324.82</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250208-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">3878.16</value><description><narrative> Output 1.1</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-250209</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Preparation of national inventory of banks of waste controlled substances and development of a national plan for management of these substances</narrative></title><description type="1"><narrative> Preparation of national inventory of banks of waste controlled substances and development of a national plan for management of these substances (decision 91/66).</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-250209"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2025-06-18"/><activity-date type="3" iso-date="2027-07-01"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2025-01-01"/><period-end iso-date="2025-12-31"/><value currency="USD" value-date="2025-01-01">2196.12</value></budget><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">97803.88</value></budget><transaction ref="250209-1-01-01-2025-07-1"><transaction-type code="1"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">100000.00</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-07-4"><transaction-type code="4"/><transaction-date iso-date="2025-07-31"/><value currency="USD" value-date="2025-07-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-10-1"><transaction-type code="1"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-10-4"><transaction-type code="4"/><transaction-date iso-date="2025-10-31"/><value currency="USD" value-date="2025-10-31">2187.09</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-11-1"><transaction-type code="1"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-11-4"><transaction-type code="4"/><transaction-date iso-date="2025-11-30"/><value currency="USD" value-date="2025-11-30">-8.85</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250209-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">17.88</value><description><narrative> Preparatory Assistance</narrative></description><recipient-country code="ZA"/></transaction></iati-activity><iati-activity last-updated-datetime="2026-08-31T11:21:18" default-currency="USD" xml:lang="en" hierarchy="1"><iati-identifier>XM-DAC-41123-PROJECT-250510</iati-identifier><reporting-org ref="XM-DAC-41123" type="40"><narrative>United Nations Industrial Development Organization</narrative></reporting-org><title><narrative>Preparation of a pilot project on energy efficiency (decision 95/87)</narrative></title><description type="1"><narrative> The project builds on data collection and analysis of national energy use, regulations, and industry performance to establish benchmarks and efficiency targets for heat exchangers. Using inputs from manufacturers and regulators, it will develop an action plan, consolidated in a project document for submission.</narrative></description><participating-org ref="XM-DAC-41123" type="40" role="4" activity-id="XM-DAC-41123-PROJECT-250510"><narrative>United Nations Industrial Development Organization</narrative></participating-org><participating-org role="1"><narrative> Montreal Protocol</narrative></participating-org><activity-status code="2"/><activity-date type="1" iso-date="2025-12-09"/><activity-date type="3" iso-date="2028-01-01"/><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>South Africa</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>-30.559482 22.937506</pos></point></location><location><location-reach code="1"/><location-id code="ZA" vocabulary="A4"/><name><narrative>Not assigned</narrative></name><point srsName="http://www.opengis.net/def/crs/EPSG/0/4326"><pos>. .</pos></point></location><sector vocabulary="2" code="321"/><policy-marker vocabulary="1" code="1" significance=""/><budget><period-start iso-date="2026-01-01"/><period-end iso-date="2026-12-31"/><value currency="USD" value-date="2026-01-01">20000.00</value></budget><budget><period-start iso-date="2027-01-01"/><period-end iso-date="2027-12-31"/><value currency="USD" value-date="2027-01-01">10000.00</value></budget><transaction ref="250510-1-01-01-2025-12-1"><transaction-type code="1"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">30000.00</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2025-12-4"><transaction-type code="4"/><transaction-date iso-date="2025-12-31"/><value currency="USD" value-date="2025-12-31">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-01-1"><transaction-type code="1"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-01-4"><transaction-type code="4"/><transaction-date iso-date="2026-01-31"/><value currency="USD" value-date="2026-01-31">11169.60</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-02-1"><transaction-type code="1"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-02-4"><transaction-type code="4"/><transaction-date iso-date="2026-02-28"/><value currency="USD" value-date="2026-02-28">10.15</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-03-1"><transaction-type code="1"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-03-4"><transaction-type code="4"/><transaction-date iso-date="2026-03-31"/><value currency="USD" value-date="2026-03-31">10.15</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-04-1"><transaction-type code="1"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-04-4"><transaction-type code="4"/><transaction-date iso-date="2026-04-30"/><value currency="USD" value-date="2026-04-30">112.18</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-05-1"><transaction-type code="1"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-05-4"><transaction-type code="4"/><transaction-date iso-date="2026-05-31"/><value currency="USD" value-date="2026-05-31">22.11</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-06-1"><transaction-type code="1"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-06-4"><transaction-type code="4"/><transaction-date iso-date="2026-06-30"/><value currency="USD" value-date="2026-06-30">8.59</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-07-1"><transaction-type code="1"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-07-4"><transaction-type code="4"/><transaction-date iso-date="2026-07-31"/><value currency="USD" value-date="2026-07-31">8.59</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-08-1"><transaction-type code="1"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">0</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction><transaction ref="250510-1-01-01-2026-08-4"><transaction-type code="4"/><transaction-date iso-date="2026-08-31"/><value currency="USD" value-date="2026-08-31">8.59</value><description><narrative> Energy efficiency (decision 95/87)</narrative></description><recipient-country code="ZA"/></transaction></iati-activity></iati-activities>
