<iati-activities version="2.03" generated-datetime="2026-09-30T10:56:18"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:23:32" hierarchy="1"><iati-identifier>44000-P175131</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>COVID-19 Response Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Program Development Objective is to prevent, detect, and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in Turkmenistan.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The proposed Project would be implemented over a period of two years under the Fast-track CCOVID-19 Facility (FTCF) for a total amount of US$20 million and is organized into three components as presented below. Component 1. Improving COVID-19 Prevention, Detection and Emergency Response; Subcomponent 1.1: Strengthening surveillance and rapid response to suspected cases of COVID-19 Subcomponent 1.2: Strengthening risk communication and community engagement Component 2: Improving Health System Preparedness for COVID-19 and Component 3: Project Management and Monitoring and EvaluationThe first two components cover seven critical pillars of an effective pandemic response plan, as outlined by WHO . Specifically, •	Component 1 will aim to strengthen country level coordination, risk communication, early case detection, isolation and contact tracing, testing, and response capacities (activities which mostly fall within the responsibility of the MoHMI Division for Sanitary and Epidemiological Safety and Control). •	Component 2 will focus on strengthening infection prevention and control and cases management practices in health facilities (activities which mostly fall within the responsibility of the MoHMI Division for Patient Care).The third component of the project will focus on project management and evaluation and monitoring activities. ]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="TM–ORP0047212"><narrative>Ministry of Finance and Economy of Turkmenistan</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="TM–ORP0047211"><narrative>Ministry of Health and Medical Industry of Turkmenistan</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-12-22">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2021-06-30">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2023-12-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2023-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Oraz Sultanov</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>osultanov@worldbankgroup.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="TM" percentage="100"><narrative xml:lang="en">TURKMENISTAN</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0001218197" />
						<name><narrative>Turkmenistan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>39.75 59.66667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000162182" />
						<name><narrative>Ashgabat</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>37.95 58.38333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="12250" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="85.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="71" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="15" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="71" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="100" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="15" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="3" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="100" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="100" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="71" xml:lang="en"><narrative>ICT</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope>
		<humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">49800.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">59740.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">69500.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">78640.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">133060.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">101220.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">113920.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">122140.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">126180.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">129500.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">202180.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">136720.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">133840.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">131680.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">134560.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">217920.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">154000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">159360.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">170320.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">181840.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">189540.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">306740.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">223080.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">49800.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">59740.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">69500.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">78640.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">133060.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">101220.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">113920.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">122140.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">126180.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">129500.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">202180.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">136720.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">133840.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">131680.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">134560.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">217920.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">154000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">159360.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">170320.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">181840.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">189540.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">50000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">14955481</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">4994519</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-50000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-61600</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-205085</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-461393</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-607804</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-657039</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-652268</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-558816</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-550695</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-489606</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175131"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175131?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175131"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 3: Number of designated beds for COVID-19 patients with access to continuous oxygen supply
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="600.00">

</target>
<actual value="1000.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
List of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lung function disorders is defined and regularly updated.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No verified list of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lungfunction disorders exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="A verified list of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lungfunction disorders is defined and regularly updated">

</target>
<actual value="A verified list of equipment, consumables and medications for resuscitation and management of SARI patients with lung functiondisorders is defined. No updates are required.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 3: Number of designated beds for COVID-19 patients with access to continuous oxygen supply
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="600.00">

</target>
<actual value="1000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 2: Number of COVID-19 designated laboratories with verified diagnostic equipment and test kits.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clinical protocols, including a referral system, to care for COVID-19 patients are regularly reviewed or updated
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="Clinical protocols, including a referral system, for COVID-19 patients established"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="Clinical protocols, including a referral system, for COVID-19 patients are regularly reviewed or updated as necessary">

</target>
<actual value="New Clinical protocols were approved. Seminars and workshops on the new protocols have been conducted.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of risk communication messages targeted to different population groups developed
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in risk awareness of COVID-19 among PHC nurses
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Electronic program for tracking and monitoring contacts developed and set up in Sanitary and Epidemiological Safety and Control (SESC) offices in Ashgabat and in five velayats
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No electronic program for tracking and monitoring contacts exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="An electronic program for tracking and monitoring contacts is set up in SESC offices in Ashgabat and in five velayats">

</target>
<actual value="Contract award is expected by September 2023, with delivery and installation by November 2023.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospital and primary care physicians trained in the management of COVID-19 and SARI patients and adherence to COVID-19 protocols
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="2000.00">

</target>
<actual value="2164.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff (physicians and nurses) trained in infection prevention and control in accordance with approved protocols
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="4000.00">

</target>
<actual value="4001.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of focus groups conducted to engage communities, understand their needs and receive feedback on the project
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="16.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of risk communication messages targeted to different population groups developed
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hospital preparedness plans on COVID-19 are prepared in 5 infectious disease hospitals in 5 districts and health workers trained
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 3: Number of designated beds for COVID-19 patients with access to continuous oxygen supply
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="600.00">

</target>
<actual value="1000.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of focus groups conducted to engage communities, understand their needs and receive feedback on the project
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="16.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO Indicator 4: A National Pandemic Preparedness and Response Plan is regularly updated and tailored for each region.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="A national Pandemic Preparedness and Response Plan has been adopted exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="The National Pandemic Preparedness and Response Plan tailored to each region is regularly updated">

</target>
<actual value="The National Pandemic Preparedness and Response Plan is being implemented. No updates necessary.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
List of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lung function disorders is defined and regularly updated.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No verified list of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lungfunction disorders exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="A verified list of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lungfunction disorders is defined and regularly updated">

</target>
<actual value="A verified list of equipment, consumables and medications for resuscitation and management of SARI patients with lung functiondisorders is defined. No updates are required.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
List of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lung function disorders is defined and regularly updated.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No verified list of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lungfunction disorders exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="A verified list of equipment, consumables and medications for resuscitation and management of COVID-19 and SARI patients with lungfunction disorders is defined and regularly updated">

</target>
<actual value="A verified list of equipment, consumables and medications for resuscitation and management of SARI patients with lung functiondisorders is defined. No updates are required.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of gender-specific information campaigns delivered.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of gender-specific information campaigns delivered.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospital and primary care physicians trained in the management of COVID-19 and SARI patients and adherence to COVID-19 protocols
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="2000.00">

</target>
<actual value="2164.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in risk awareness of COVID-19 among PHC nurses
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of risk communication messages targeted to different population groups developed
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health specialists trained on climate-induced vector borne diseases and waterborne diseases
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="100.00">

</target>
<actual value="103.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff (physicians and nurses) trained in infection prevention and control in accordance with approved protocols
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="4000.00">

</target>
<actual value="4001.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO Indicator 1: Development and periodic update of a comprehensive national COVID-19 risk communication plan, including standardized, evidence-based information targeted to different population group
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No comprehensive national COVID-19 risk communication plan exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="A comprehensive national COVID-19 risk communication plan has been developed and is periodically updated to include standardized,evidence-based information targeted to different population groups.">

</target>
<actual value="The comprehensive national COVID-19 risk communication plan, including standardized, evidence-based information targeted todifferent population group developed with support of the Dornsife School of Public Health of Drexel University jointly with MoHMIand other national partners.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO Indicator 4: A National Pandemic Preparedness and Response Plan is regularly updated and tailored for each region.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="A national Pandemic Preparedness and Response Plan has been adopted exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="The National Pandemic Preparedness and Response Plan tailored to each region is regularly updated">

</target>
<actual value="The National Pandemic Preparedness and Response Plan is being implemented. No updates necessary.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospital and primary care physicians trained in the management of COVID-19 and SARI patients and adherence to COVID-19 protocols
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="2000.00">

</target>
<actual value="2164.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Electronic program for tracking and monitoring contacts developed and set up in Sanitary and Epidemiological Safety and Control (SESC) offices in Ashgabat and in five velayats
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No electronic program for tracking and monitoring contacts exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="An electronic program for tracking and monitoring contacts is set up in SESC offices in Ashgabat and in five velayats">

</target>
<actual value="Installed and available on the state telecom company server with access for the SES staff. Training was delivered in early December2023.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hospital preparedness plans on COVID-19 are prepared in 5 infectious disease hospitals in 5 districts and health workers trained
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of focus groups conducted to engage communities, understand their needs and receive feedback on the project
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="16.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clinical protocols, including a referral system, to care for COVID-19 patients are regularly reviewed or updated
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="Clinical protocols, including a referral system, for COVID-19 patients established"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="Clinical protocols, including a referral system, for COVID-19 patients are regularly reviewed or updated as necessary">

</target>
<actual value="New Clinical protocols were approved. Seminars and workshops on the new protocols have been conducted.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of COVID-19 designated laboratories with staff trained to conduct COVID-19 diagnosis
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="13.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 2: Number of COVID-19 designated laboratories with verified diagnostic equipment and test kits.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants in community meetings/events reporting that the local outreach and community engagement process is effective (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="75.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants in community meetings/events reporting that the local outreach and community engagement process is effective (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="75.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO Indicator 1: Development and periodic update of a comprehensive national COVID-19 risk communication plan, including standardized, evidence-based information targeted to different population group
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No comprehensive national COVID-19 risk communication plan exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="A comprehensive national COVID-19 risk communication plan has been developed and is periodically updated to include standardized,evidence-based information targeted to different population groups.">

</target>
<actual value="The comprehensive national COVID-19 risk communication plan, including standardized, evidence-based information targeted todifferent population group developed with support of the Dornsife School of Public Health of Drexel University jointly with MoHMIand other national partners.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of participants in community meetings/events reporting that the local outreach and community engagement process is effective (disaggregated by gender)
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="75.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO Indicator 4: A National Pandemic Preparedness and Response Plan is regularly updated and tailored for each region.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="A national Pandemic Preparedness and Response Plan has been adopted exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="The National Pandemic Preparedness and Response Plan tailored to each region is regularly updated">

</target>
<actual value="The National Pandemic Preparedness and Response Plan is being implemented. No updates necessary.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of gender-specific information campaigns delivered.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of COVID-19 designated laboratories with staff trained to conduct COVID-19 diagnosis
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="13.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of COVID-19 designated laboratories with staff trained to conduct COVID-19 diagnosis
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="13.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 2: Number of COVID-19 designated laboratories with verified diagnostic equipment and test kits.
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health specialists trained on climate-induced vector borne diseases and waterborne diseases
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="100.00">

</target>
<actual value="103.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public health specialists trained on climate-induced vector borne diseases and waterborne diseases
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="100.00">

</target>
<actual value="103.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health staff (physicians and nurses) trained in infection prevention and control in accordance with approved protocols
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="4000.00">

</target>
<actual value="4001.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hospital preparedness plans on COVID-19 are prepared in 5 infectious disease hospitals in 5 districts and health workers trained
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Electronic program for tracking and monitoring contacts developed and set up in Sanitary and Epidemiological Safety and Control (SESC) offices in Ashgabat and in five velayats
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No electronic program for tracking and monitoring contacts exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="An electronic program for tracking and monitoring contacts is set up in SESC offices in Ashgabat and in five velayats">

</target>
<actual value="Installed and available on the state telecom company server with access for the SES staff. Training was delivered in early December2023.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Clinical protocols, including a referral system, to care for COVID-19 patients are regularly reviewed or updated
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="Clinical protocols, including a referral system, for COVID-19 patients established"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="Clinical protocols, including a referral system, for COVID-19 patients are regularly reviewed or updated as necessary">

</target>
<actual value="New Clinical protocols were approved. Seminars and workshops on the new protocols have been conducted.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in risk awareness of COVID-19 among PHC nurses
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="0.00"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO Indicator 1: Development and periodic update of a comprehensive national COVID-19 risk communication plan, including standardized, evidence-based information targeted to different population group
</narrative></title>
<baseline year="2021" iso-date="2021-01-29" value="No comprehensive national COVID-19 risk communication plan exists"></baseline>
<period>
<period-start iso-date="2021-01-29" />
<period-end iso-date="2023-12-31" />
<target value="A comprehensive national COVID-19 risk communication plan has been developed and is periodically updated to include standardized,evidence-based information targeted to different population groups.">

</target>
<actual value="The comprehensive national COVID-19 risk communication plan, including standardized, evidence-based information targeted todifferent population group developed with support of the Dornsife School of Public Health of Drexel University jointly with MoHMIand other national partners.">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>