<iati-activities version="2.03" generated-datetime="2026-09-30T10:54:31"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:47:08" hierarchy="1"><iati-identifier>44000-P175235</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Central Africa Regional Waterways Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to enhance transport and trade efficiency, infrastructure climate-resilience, and socio-economic inclusion, along the selected waterway and road corridor sections between the Central African Republic (CAR) and Republic of Congo (ROC).]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[With a population of nearly 5.4 million, the CAR is a sparsely populated, landlocked country in the heart of Africa. Despite its vast 623,000 km² area, rich in arable land, large mineral deposits, and dense tropical forests, CAR remains one of the poorest nations in Africa. Agriculture dominates the economy, employing 80% of the active population and contributing to half of the country's GDP. However, with a GDP per capita of US$ 775, CAR faces immense development challenges. In terms of social inclusion challenges, gender inequalities indeed persist in the country, as demonstrated by significant gender gaps in human capital, employment opportunities, and high levels of violence. ROC, which covers 342,000 km2 and with a population of 5.61 million, is home to the region's deepest shore port in Pointe-Noire. However, its potential as a response to neighboring countries' (CAR, DRC, Chad) need for sea access remains underutilized. Majority of the population (56%) is under 20 years old, and 52.5% live below the national poverty line. Approximately 65% of the poor reside along the Brazzaville-Pointe Noire corridor and in the major cities of Pointe Noire and Brazzaville. The economy has experienced a downturn since 2014, largely attributed to the country's substantial dependence on oil exports and subsequent oil price shocks. Gender disparities persist in the Republic of Congo. With a Gender Inequality Index (GII) of 0.564, the nation ranks 147 out of 170 countries. The transport sector remains a key enabler for CAR's economic development, facilitating intra-community trade and its connection to neighboring countries but vastly underperforms its role. As a landlocked country, internally and regionally, roads are the main mode of transport, but road density is low, and in poor condition, hindering CAR's integration with the region. The Congo Basin, the world's second-largest river basin, spans six countries: ROC, DRC, CAR, western Zambia, northern Angola, and portions of Cameroon and Tanzania. Many ports and piers located along the Congo and Ubangi rivers need support for managing operations and rehabilitation activities. The Congo and Ubangi rivers have been the principal trade route for CAR and Chad since the 1960s. However, the substantial decline in the navigability period for the river corridor has deviated traffic to the Bangui-Douala corridor. The means of transport on the river are very rustic, and generally in very deteriorated conditions, with regular accidents resulting in a high rate of fatality. Three public institutions oversee the development and maintenance of navigability on the Congo, Ubangi, and Sangha rivers in the Congo basin. These include the national waterways authority in DRC (Regie des Voies Fluviales - RVF), the economic interest group for common waterways maintenance (GIE-SCEVN) in CAR and ROC, and the International Commission of the Congo-Ubangi-Sangha Basin (CICOS). The proposed project supports the World Bank Group's (WBG) Regional Integration and Cooperation Assistance Strategy updated in 2020. The proposed project also supports the CPF CAR Country Partnership Framework FY21-25 (CPF) and is aligned with CAR's transport strategy. The ROC CPF FY20-24 emphasizes “interventions to strengthen natural resources management.” The proposed project will have five components: (i) waterways, ports, and road infrastructure improvement program (US$ 274 million), (ii) support for waterway and road sectors governance and trade facilitation (US$ 22.5 million), (iii) socially inclusive investments and capacity building for riparian communities (US$ 18.5 million), (iv) project management, implementation support, and institutional strengthening (US$15 million) and (v) Contingent Emergency Response (US$ 0). ]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–P0055288"><narrative>Central African Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–P0055289"><narrative>Republic of Congo</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3T-COA-0047335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-10-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Francis Eric Ovanda Mbele</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fovandambele@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>








<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007731907" />
            <name><narrative>Mossaka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.72757 16.58471</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007731900" />
            <name><narrative>Impfondo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1.61694 17.97968</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002572183" />
            <name><narrative>Brazzaville department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.2657 15.28048</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007731898" />
            <name><narrative>Mongoumba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.72637 18.47591</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011996236" />
            <name><narrative>Betou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.12278 18.39768</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011996238" />
            <name><narrative>Liranga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.10446 17.69229</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21021" percentage="59" xml:lang="en"/><sector vocabulary="1" code="21040" percentage="28" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="3" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="6" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000143" percentage="10" xml:lang="en"><narrative>Trade Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="93" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="43" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="10" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="6" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="6" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="93" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="16" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="93" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="7" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="11" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="6" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="6" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="11" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="10" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="90" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">3100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">5220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">5900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">6610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">3590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">7540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">3950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">8710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">8800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">9270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">9390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">9380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">4690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">9380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">4680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">4680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">9360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">9350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">9340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">9340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">9330000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">4670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">7720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">4790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">4790000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">287147451.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">287147451.97</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">240000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">90000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">9767215</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">5420313</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">58485</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">25495</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1415903</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">33085</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2481896</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1163930</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">182253</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">182110</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1050970</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">198987</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">98172</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">93592</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">122373</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">817221</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">375692</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">15468</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">67589</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">457070</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">385667</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">16343576</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2095487</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-38415</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-47934</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-72574</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-47335"><narrative>Ministry of Equipment and Public Works (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47336"><narrative>Ministry of Planning, Statistics and Regional Integration (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47337"><narrative>Ministry of Transport and Civil Aviation (CAR)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-47338"><narrative>Ministry of the River Economy and Waterways (ROC)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-55680"><narrative>Ministry of Digital Economy, Posts, and Telecommunications (CAR)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175235"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175235?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175235"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with all-weather access along the Brazzaville-Bangui waterway and BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="2,922,000.00">
<comment><narrative>
The number of people expected to have direct access to an improved climate-resilient road and waterway corridor along Brazzaville-Bangui and Bossembele-Bossangoa sections will be assessed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of project-funded storage facilities leased to or used by women in local markets
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="60.00">
<comment><narrative>
Indicator to measure the percentage of project-funded storage facilities leased to women traders in local markets after completion of small-scale works
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased throughput at selected ports along the Brazzaville-Bangui waterway section
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="10.00">
<comment><narrative>
Indicator to measure the combined increase in freight throughput at selected primary ports, considering the planned works.
Baseline: 380,000 tons (290,000 tons for Brazzaville + 90,000 tons for Bangui in 2021)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduced travel time along the Brazzaville-Bangui waterway and the BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="30.00">
<comment><narrative>
Indicator to measure reduction of travel time after completion of BossembElE-Bossangoa road improvement; after completion of regular waterways maintenance and dredging of access to the ports of Bangui and Brazzaville.
Baseline: 260 minutes (road) - 14 days (waterway)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduced travel time along the Brazzaville-Bangui waterway and the BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="30.00">
<comment><narrative>
Indicator to measure reduction of travel time after completion of BossembElE-Bossangoa road improvement; after completion of regular waterways maintenance and dredging of access to the ports of Bangui and Brazzaville.
Baseline: 260 minutes (road) - 14 days (waterway)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with all-weather access along the Brazzaville-Bangui waterway and BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="2,922,000.00">
<comment><narrative>
The number of people expected to have direct access to an improved climate-resilient road and waterway corridor along Brazzaville-Bangui and Bossembele-Bossangoa sections will be assessed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with all-weather access along the Brazzaville-Bangui waterway and BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="2,922,000.00">
<comment><narrative>
The number of people expected to have direct access to an improved climate-resilient road and waterway corridor along Brazzaville-Bangui and Bossembele-Bossangoa sections will be assessed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted local traders in CAR and ROC demonstrating improved trade and business competency
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="75.00">
<comment><narrative>
Number of local traders who pass the training program tests on trade and business practices, divided by the total number of local traders attending the proposed training programs in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted local traders in CAR and ROC demonstrating improved trade and business competency
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="75.00">
<comment><narrative>
Number of local traders who pass the training program tests on trade and business practices, divided by the total number of local traders attending the proposed training programs in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased throughput at selected ports along the Brazzaville-Bangui waterway section
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="10.00">
<comment><narrative>
Indicator to measure the combined increase in freight throughput at selected primary ports, considering the planned works.
Baseline: 380,000 tons (290,000 tons for Brazzaville + 90,000 tons for Bangui in 2021)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased throughput at selected ports along the Brazzaville-Bangui waterway section
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="10.00">
<comment><narrative>
Indicator to measure the combined increase in freight throughput at selected primary ports, considering the planned works.
Baseline: 380,000 tons (290,000 tons for Brazzaville + 90,000 tons for Bangui in 2021)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training person-days completed (certification/training programs on navigation)
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="12,000.00">
<comment><narrative>
Indicator to measure the number of training person days completed on navigation related topics, under certification/training programs targeting registered professionals and students.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduced travel time along the Brazzaville-Bangui waterway and the BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="30.00">
<comment><narrative>
Indicator to measure reduction of travel time after completion of BossembElE-Bossangoa road improvement; after completion of regular waterways maintenance and dredging of access to the ports of Bangui and Brazzaville.
Baseline: 260 minutes (road) - 14 days (waterway)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Zinga feasibility study completed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the completion of the Zinga feasibility study
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital trade data collection system established in CAR and ROC
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure whether the system was developed
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Villages provided with new or rehabilitated socio-economic infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="10.00">
<comment><narrative>
Indicator to measure the number of villages where community-level infrastructure works are completed
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financially sustainable asset management strategies for the whole corridor endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the endorsement of said strategies by the regional committee. In particular, these strategies will look at the potential for private capital mobilization.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bossembele-Bossangoa road section upgraded to 2-lane climate-resilient paved road standard
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="150.00">
<comment><narrative>
Indicator to measure the length of road upgraded to 2-lane climate-resilient paved road standard
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted local traders in CAR and ROC demonstrating improved trade and business competency
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="75.00">
<comment><narrative>
Number of local traders who pass the training program tests on trade and business practices, divided by the total number of local traders attending the proposed training programs in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-15" />
<target value="292,2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ports and quays rehabilitated or upgraded with green, climate-resilient and universal access standards
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="18.00">
<comment><narrative>
Indicator to measure the number of ports rehabilitated or upgraded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Congo Basin Information System (SIBCO), including early warning system, upgraded
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the completion of the SIBCO system upgrade
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with all-weather access along the Brazzaville-Bangui waterway and BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="2,922,000.00">
<comment><narrative>
The number of people expected to have direct access to an improved climate-resilient road and waterway corridor along Brazzaville-Bangui and Bossembele-Bossangoa sections will be assessed.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
All-weather connection for people in Bossangoa along project feeder roads
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the completion of civil works for targeted feeder roads under the project to be upgraded to climate-resilient standard. Km of feeder roads to be completed will be defined during the first year of implementation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator must be removed by OPCS as it is not relevant to this project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital trade data collection system established in CAR and ROC
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure whether the system was developed
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road and navigation safety awareness campaigns implemented
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="8.00">
<comment><narrative>
Number of safety campaigns implemented on a yearly basis (minimum once a year from Year 2 of project implementation):
4 road safety campaigns and 4 navigation safety campaigns to be conducted during project implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bossembele-Bossangoa road section upgraded to 2-lane climate-resilient paved road standard
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="150.00">
<comment><narrative>
Indicator to measure the length of road upgraded to 2-lane climate-resilient paved road standard
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased throughput at selected ports along the Brazzaville-Bangui waterway section
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="10.00">
<comment><narrative>
Indicator to measure the combined increase in freight throughput at selected primary ports, considering the planned works.
Baseline: 380,000 tons (290,000 tons for Brazzaville + 90,000 tons for Bangui in 2021)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Terrestrial and aquatic areas under enhanced conservation and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator must be removed by OPCS as it is not relevant to this project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Congo Basin Information System (SIBCO), including early warning system, upgraded
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the completion of the SIBCO system upgrade
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
All-weather connection for people in Bossangoa along project feeder roads
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the completion of civil works for targeted feeder roads under the project to be upgraded to climate-resilient standard. Km of feeder roads to be completed will be defined during the first year of implementation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training person-days completed (certification/training programs on navigation)
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="12,000.00">
<comment><narrative>
Indicator to measure the number of training person days completed on navigation related topics, under certification/training programs targeting registered professionals and students.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community feedback on community-level infrastructure works
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="80.00">
<comment><narrative>
Indicator to measure the percentage of satisfaction of local beneficiaries after completion of community-level infrastructure works in villages
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financially sustainable asset management strategies for the whole corridor endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the endorsement of said strategies by the regional committee. In particular, these strategies will look at the potential for private capital mobilization.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-15" />
<target value="292,2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduced travel time along the Brazzaville-Bangui waterway and the BossembElE-Bossangoa road sections
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="30.00">
<comment><narrative>
Indicator to measure reduction of travel time after completion of BossembElE-Bossangoa road improvement; after completion of regular waterways maintenance and dredging of access to the ports of Bangui and Brazzaville.
Baseline: 260 minutes (road) - 14 days (waterway)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green and Resilient Ports and Waterways Development Strategies in ROC and CAR endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the endorsement of said strategy and master plan by the national committees.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-15" />
<target value="292,2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Zinga feasibility study completed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the completion of the Zinga feasibility study
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ports and quays rehabilitated or upgraded with green, climate-resilient and universal access standards
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="18.00">
<comment><narrative>
Indicator to measure the number of ports rehabilitated or upgraded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GIE-SCEVN annual campaigns for maintenance and replacement of river markings and buoys completed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="5.00">
<comment><narrative>
The first campaign is ongoing and will be completed by end of 2025 (related contract was signed in December 2024).
</narrative></comment>
</target>
<actual value="0.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of project-funded storage facilities leased to or used by women in local markets
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="60.00">
<comment><narrative>
Indicator to measure the percentage of project-funded storage facilities leased to women traders in local markets after completion of small-scale works
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GIE-SCEVN annual campaigns for maintenance and replacement of river markings and buoys completed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="5.00">
<comment><narrative>
The first campaign is ongoing and will be completed by end of 2025 (related contract was signed in December 2024).
</narrative></comment>
</target>
<actual value="0.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green and Resilient Ports and Waterways Development Strategies in ROC and CAR endorsed
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="Yes">
<comment><narrative>
Indicator to measure the endorsement of said strategy and master plan by the national committees.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-15" />
<target value="292,2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved related to the delivery of project activities within the timeframe stipulated in the PIM
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="100.00">
<comment><narrative>
Indicator to measure the efficiency of the grievance redress mechanism  for project activities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances resolved related to the delivery of project activities within the timeframe stipulated in the PIM
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="100.00">
<comment><narrative>
Indicator to measure the efficiency of the grievance redress mechanism  for project activities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community feedback on community-level infrastructure works
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="80.00">
<comment><narrative>
Indicator to measure the percentage of satisfaction of local beneficiaries after completion of community-level infrastructure works in villages
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road and navigation safety awareness campaigns implemented
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="8.00">
<comment><narrative>
Number of safety campaigns implemented on a yearly basis (minimum once a year from Year 2 of project implementation):
4 road safety campaigns and 4 navigation safety campaigns to be conducted during project implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Villages provided with new or rehabilitated socio-economic infrastructure
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="10.00">
<comment><narrative>
Indicator to measure the number of villages where community-level infrastructure works are completed
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of targeted local traders in CAR and ROC demonstrating improved trade and business competency
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2029-10-31" />
<target value="75.00">
<comment><narrative>
Number of local traders who pass the training program tests on trade and business practices, divided by the total number of local traders attending the proposed training programs in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T19:47:08" hierarchy="1"><iati-identifier>44000-P505923</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sustainable Congo Basin Forest Economies</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve forest management, strengthen forest value chains, and create jobs in targeted areas in Congo Basin Forest countries. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[This horizontal MPA - The Sustainable Congo Basin Forest Economies (SCBFE) Program is an ambitious commitment to create jobs and economic opportunities through sustainable management of Congo Basin Forests (CBF). It will operationalize the Global Challenge Program - Forests for development, climate and biodiversity by focusing on sustainably developing value-added products and services from the forest sector, increasing jobs and improving regional cooperation and national capacity for biodiversity conservation. The proposed program responds to the World Bank Group's 3-pillar approach to job creation: (i) strengthening governance and policies; (ii) establishing the foundational infrastructure for forest jobs; and (iii) mobilizing private capital to deliver solutions at scale. It leverages globally tested approaches for sustainable management of forests, including strengthening value chains that deliver jobs and economic opportunities to reduce poverty, while promoting the rich biodiversity of the forests. The project will enhance regional and global climate and biodiversity benefits and help Congo Basin Forest countries coordinate their climate and forest policies for greater development impact.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00007002"><narrative>Central African Economic and Monetary Community (CEMAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00007002"><narrative>Central African Economic and Monetary Community (CEMAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00007003"><narrative>Central African Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00007003"><narrative>Central African Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00010412"><narrative>Central African Forest Commission (COMIFAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00010412"><narrative>Central African Forest Commission (COMIFAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00012567"><narrative>Ministry of Economy, Planning and International Cooperation</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00012567"><narrative>Ministry of Economy, Planning and International Cooperation</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00012568"><narrative>Republic of Congo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00012568"><narrative>Republic of Congo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00012759"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00012759"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00013121"><narrative>Republic of Congo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00013121"><narrative>Republic of Congo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00013122"><narrative>Central African Economic and Monetary Community (CEMAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00013122"><narrative>Central African Economic and Monetary Community (CEMAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00013123"><narrative>Central African Forest Commission (COMIFAC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–00013123"><narrative>Central African Forest Commission (COMIFAC)</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3T-COA-00013069"><narrative>Ministry of Forestry and Wildlife</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-31"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2033-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2033-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Madhavi M. Pillai</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mpillai3@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Opposite Carrefour Hilton, Yaounde, Yaounde
, www.mepci.cf
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Opposite Carrefour Hilton, Yaounde, Yaounde
, www.mepci.cf
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
BP: 20818 , Yaounde
, https://comifac.org/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
BP: 20818 , Yaounde
, https://comifac.org/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rue Martin Luther King B.P. 696 , Bangui 

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rue Martin Luther King B.P. 696 , Bangui 

</narrative></mailing-address></contact-info>






















<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="0000000" />
                    <name>
                        <narrative>No Data Available</narrative>
                    </name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                    <pos>0.00 0.00</pos>
                </point>
                <exactness code="2"/>
                <location-class code="4" />
            </location><sector vocabulary="1" code="31220" percentage="53" xml:lang="en"/><sector vocabulary="1" code="32162" percentage="33" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="14" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAT" percentage="63.0000000" xml:lang="en"><narrative>Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="7.00000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFK" percentage="30.0000000" xml:lang="en"><narrative>Capital Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4964285.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4964285.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">4964285.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4964289.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">6250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">5416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">4583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">4583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">3166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">3166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">3224165.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">3224177.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">2916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">713808.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">713808.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">713808.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">713808.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">713808.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">713814.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-30"/>
<value currency="USD" value-date="2033-12-30">385830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-30"/>
<value currency="USD" value-date="2033-12-30">385830000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-13069"><narrative>Ministry of Forestry and Wildlife</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13070"><narrative>Ministry of Forest Economy</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13071"><narrative>Ministry of Water, Forests, Hunting and Fisheries </narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13124"><narrative>Ministry of Forestry and Wildlife (Cameroon)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13125"><narrative>Ministry of Water, Forests, Hunting and Fisheries (Central African Republic)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13126"><narrative>Ministry of Forest Economy (Republic of Congo)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">193830000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-13069"><narrative>Ministry of Forestry and Wildlife</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13070"><narrative>Ministry of Forest Economy</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13071"><narrative>Ministry of Water, Forests, Hunting and Fisheries </narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13124"><narrative>Ministry of Forestry and Wildlife (Cameroon)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13125"><narrative>Ministry of Water, Forests, Hunting and Fisheries (Central African Republic)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13126"><narrative>Ministry of Forest Economy (Republic of Congo)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">60000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-13069"><narrative>Ministry of Forestry and Wildlife</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13070"><narrative>Ministry of Forest Economy</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13071"><narrative>Ministry of Water, Forests, Hunting and Fisheries </narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13124"><narrative>Ministry of Forestry and Wildlife (Cameroon)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13125"><narrative>Ministry of Water, Forests, Hunting and Fisheries (Central African Republic)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13126"><narrative>Ministry of Forest Economy (Republic of Congo)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">6000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-13069"><narrative>Ministry of Forestry and Wildlife</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13070"><narrative>Ministry of Forest Economy</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13071"><narrative>Ministry of Water, Forests, Hunting and Fisheries </narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13124"><narrative>Ministry of Forestry and Wildlife (Cameroon)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13125"><narrative>Ministry of Water, Forests, Hunting and Fisheries (Central African Republic)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13126"><narrative>Ministry of Forest Economy (Republic of Congo)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">6000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3T-COA-13069"><narrative>Ministry of Forestry and Wildlife</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13070"><narrative>Ministry of Forest Economy</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13071"><narrative>Ministry of Water, Forests, Hunting and Fisheries </narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13124"><narrative>Ministry of Forestry and Wildlife (Cameroon)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13125"><narrative>Ministry of Water, Forests, Hunting and Fisheries (Central African Republic)</narrative></receiver-org><receiver-org xml:lang="en" ref="3T-COA-13126"><narrative>Ministry of Forest Economy (Republic of Congo)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505923"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505923?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505923"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities benefitting from assets and services provided by the Project
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community or council forests benefitting from sustainable management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="2,955,482">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with matching grants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with guarantees
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with matching grants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management of protected areas improved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="4,930,111">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities benefitting from assets and services provided by the project
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National traceability or legality verification systems improved and functional
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional platform operational and facilitating stakeholder management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from capacity development
</narrative></title>
<baseline year="2025" iso-date="2025-12-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-16" />
<period-end iso-date="2033-12-15" />
<target value="20,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key regional policy initiatives supported by the programme
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with guarantees
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional platform operational and facilitating stakeholder management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities benefitting from assets and services provided by the project
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Proposed special economic zones and wood service centers receiving program support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the stipulated service standards for response times as outlined in countiry's Project Implementation Manual
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National traceability or legality verification systems improved and functional
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National traceability or legality verification systems improved and functional
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with matching grants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from capacity development
</narrative></title>
<baseline year="2025" iso-date="2025-12-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-16" />
<period-end iso-date="2033-12-15" />
<target value="20,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Newly established plantations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="100,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest management plans developed with communities and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-14" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key regional policy initiatives supported by the Program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes benefitting from sustainable community or council forestry management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="2,955,482">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Newly established or improved plantations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="100,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management of protected areas improved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="4,930,111">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management of protected areas improved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="4,930,111">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the stipulated service standards for response times as outlined in country's Project Implementation Manual
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest management plans developed with communities and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Proposed special economic zones and wood service centers receiving program support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies achieving recognized legality certification for wood processing
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key regional policy initiatives supported by the programme
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from capacity development
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional platform operational and facilitating stakeholder management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with guarantees
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies achieving recognized legality certification for wood processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest management plans developed with communities and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes benefitting from sustainable community or council forestry management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="2,955,482">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the stipulated service standards for response times as outlined in countiry's Project Implementation Manual
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Proposed Special Economic Zones and wood service centers receiving Program support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Newly established or improved plantations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="100,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies achieving recognized legality certification for wood processing
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with guarantees
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="40">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses reached with matching grants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community or council forests benefitting from sustainable management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="2,955,482">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net Greenhouse Gas Emissions (tCO2eq/year)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="-17,670,269">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Key regional policy initiatives supported by the Program
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="6">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional platform operational and facilitating stakeholder management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the stipulated service standards for response times as outlined in country's Project Implementation Manual
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="95">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Proposed Special Economic Zones and wood service centers receiving Program support
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefitting from capacity development
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20,000">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management of protected areas improved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="4,930,111">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities benefitting from assets and services provided by the Project
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="500">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies achieving recognized legality certification for wood processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest management plans developed with communities and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="400">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Newly established plantations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="100,000">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National traceability or legality verification systems improved and functional
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="220,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="15">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-14" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in volume of legal wood undergoing secondary, domestic processing
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">
<comment><narrative>
The project is not effective yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="7,985,593">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P055120</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Tanzania-Transport Sector Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objectives of the project are to improve the condition of the national paved road network, to lower transport cost on selected roads, and to expand the capacity of selected regional airports.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Transport Sector Support Project for Tanzania are to improve the condition of the national paved road network, to lower transport cost on selected roads, and to expand the capacity of selected regional airports. There are five components to the project, the first component being rehabilitation and preparation of designs for the rehabilitation of paved trunk roads. The second component is the improvement of regional airports. This component will be implemented by the Tanzanian Airports Authority (TAA). Under this component the paving and rehabilitation of the runway at Kigoma airport, the rehabilitation of the main runway at Tabora airport, as well as the extension, rehabilitation, and resurfacing of the runway at Bukoba airport, with the replacement of the current apron, terminal, car parking, and other facilities, will be financed. The third component is the improvement of road safety. This component will be implemented by Ministry of Infrastructure Development (MoID). It will support the establishment of the National Road Safety Agency (NRSA), the Driver and Vehicle Examination and Licensing Agency (DVELA), and the development of a Road Accident Information System (RAIS), as proposed in the recently adopted National Road Safety Policy (NRSP). The fourth component is the promotion of public-private partnerships; (ii) feasibility studies of potential Public-Private Partnership (PPP) projects; and (iii) transaction advisors for projects that were found feasible. Finally, the fifth component is the emergency road and bridge repair.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0000079"><narrative>MINISTRY OF FINANCE AND PLANNING</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0000079"><narrative>MINISTRY OF FINANCE AND PLANNING</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0000080"><narrative>TANROADS</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2001-01-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-06-20"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-06-20"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Yonas Eliesikia Mchomvu</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ymchomvu@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000149606" />
            <name><narrative>Tanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.0689301 39.098751</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000149879" />
            <name><narrative>Singida</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.8162899 34.74358</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000160960" />
            <name><narrative>Bukoba District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.4157 31.64538</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000151477" />
            <name><narrative>Njombe District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.2090902 35.132542</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000153209" />
            <name><narrative>Moshi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.3499999 37.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000153259" />
            <name><narrative>Mombo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.8833299 38.283329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000153518" />
            <name><narrative>Mkumbara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.7666702 38.183331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000447874" />
            <name><narrative>Nyakasanza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.4983301 30.852221</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000151988" />
            <name><narrative>Namanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.5511601 36.783772</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000150275" />
            <name><narrative>Same District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.2219901 37.882778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000150276" />
            <name><narrative>Same</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.0666699 37.73333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000150387" />
            <name><narrative>Rusumo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.385 30.78583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000153809" />
            <name><narrative>Minjingu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.7 35.866669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000155568" />
            <name><narrative>Lushoto District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.54528 38.43927</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000155579" />
            <name><narrative>Lusahunga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.9097199 31.203609</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000156478" />
            <name><narrative>Korogwe District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.0827398 38.419189</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000156479" />
            <name><narrative>Korogwe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.1500001 38.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000159442" />
            <name><narrative>Igawa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.53333 35.200001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000159617" />
            <name><narrative>Himo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.3833301 37.549999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000161312" />
            <name><narrative>Babati</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.21667 35.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000161325" />
            <name><narrative>Arusha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.3666699 36.683331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000877400" />
            <name><narrative>Songea District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.39061 35.40004</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000877401" />
            <name><narrative>Songea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.68333 35.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000877746" />
            <name><narrative>Mtwara Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.25 40.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000877747" />
            <name><narrative>Mtwara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.26667 40.183331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000878023" />
            <name><narrative>Mbamba Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.28333 34.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000878057" />
            <name><narrative>Masasi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.76162 38.982899</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000878058" />
            <name><narrative>Masasi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.71667 38.799999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006297352" />
            <name><narrative>Bukoba Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.33333 31.816669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006297356" />
            <name><narrative>Kigoma Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.8833299 29.633329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000155405" />
            <name><narrative>Mafinga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 35.066669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000155569" />
            <name><narrative>Lushoto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.78333 38.283329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000154777" />
            <name><narrative>Marangu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.28333 37.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000154849" />
            <name><narrative>Manyara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.5999999 35.933331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000155077" />
            <name><narrative>Makuyuni</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.55 36.099998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000155101" />
            <name><narrative>Makumbako</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8500004 34.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="25" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="25" xml:lang="en"/><sector vocabulary="1" code="21050" percentage="25" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="72.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TV" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Aviation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="9" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="2" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="9" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">9666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">9666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">9666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">6588888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">6588888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">6588888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">7333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">7333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">7333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">8333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">6000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">6000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">6000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">3666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">3666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">878518.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">658888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">658888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">658888.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">9666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">9666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">9666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2017-06-20"/>
<value currency="USD" value-date="2017-06-20">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2017-06-20"/>
<value currency="USD" value-date="2017-06-20">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">270000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">59000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-3118</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">43740000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">6172496</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">7123615</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1306385</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">22049066</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">10062265</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">9828195</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">25154075</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">15238900</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">19099745</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">9850876</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">22380824</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2989301</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">15729062</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">20765778</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">8438920</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">11101448</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2328143</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">2321234</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">10780957</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">850088</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">33059914</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">164682</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">469669</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">3272270</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">6609131</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1100058</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">317589</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">5798001</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">395109</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">2110349</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-78478</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-166279</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-163004</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-186368</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-17061</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-52810</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-307485</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-97418</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-394030</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-494045</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-144446</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-648600</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-148106</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-161256</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-674177</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-780452</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-179918</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-1610</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-386</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-182540</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-868331</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-881641</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-183125</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-871208</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-179244</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-192114</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-941578</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-972703</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-198902</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-188820</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-922887</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-932612</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-190810</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-187628</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-917061</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-911700</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-186531</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-192410</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-937426</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-948724</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-195424</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-192710</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-923115</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-880130</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-183785</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-170814</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-817850</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-170801</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-816973</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-861602</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-179903</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-170413</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-815383</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-819970</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-171410</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-150672</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-718949</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-922348</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-192551</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-170507</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-815064</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-2510827</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-2544059</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-2511735</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-513894</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-495063</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-2419695</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-2270894</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-464618</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-2409816</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-493041</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-476783</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-2330348</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2338104</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-478370</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-486242</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2376584</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2407894</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-492648</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-496383</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2426147</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2442150</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-499657</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-80"><narrative>TANROADS</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P055120"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P055120?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P055120"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Songosongo jetty rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-01" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport Sector PPP transactions which have reaqched bidding stage
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Songosongo jetty rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-01" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (a) Korogwe-Same
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="23.00">

</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Driver and Vehicle Examination and Licencing Agency (DVELA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (a) Korogwe-Same
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="23.00">

</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Three Regional airport Runways paved and Zanzibar airport taxiways and apron improved
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Driver and Vehicle Examination and Licencing Agency (DVELA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Accident Information System established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National Road/Bridge sections improved
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="100.00">

</target>
<actual value="109.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Accident Information System established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National Road/Bridge sections improved
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="100.00">

</target>
<actual value="109.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Accident Information System established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National Road/Bridge sections improved
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="100.00">

</target>
<actual value="109.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Songosongo jetty rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-01" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (b) Arusha - Minjingu Roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="25.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Road Saftey Agency (NRSA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National Road/Bridge sections improved
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="100.00">

</target>
<actual value="109.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="70.00">

</target>
<actual value="86.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport Sector PPP transactions which have reaqched bidding stage
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Design and bidding documents for rehabilitation prepared
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="911.00">

</target>
<actual value="918.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="270.00">

</target>
<actual value="270.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Road Saftey Agency (NRSA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="70.00">

</target>
<actual value="86.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Road Saftey Agency (NRSA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Design and bidding documents for rehabilitation prepared
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="911.00">

</target>
<actual value="918.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Accident Information System established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (a) Korogwe-Same
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="23.00">

</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Songosongo jetty rehabilitated
</narrative></title>
<baseline year="2011" iso-date="2011-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-01" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport Sector PPP transactions which have reaqched bidding stage
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Design and bidding documents for rehabilitation prepared
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="911.00">

</target>
<actual value="918.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passenger Volume at airports
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="78,399.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="104,000.00">

</target>
<actual value="79,424.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport Sector PPP transactions which have reaqched bidding stage
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (a) Korogwe-Same
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="23.00">

</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (b) Arusha - Minjingu Roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="25.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Driver and Vehicle Examination and Licencing Agency (DVELA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="5,150,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-03-31" />
<target value="5,750,000.00">

</target>
<actual value="6,000,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="70.00">

</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (b) Arusha - Minjingu Roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="25.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Road Saftey Agency (NRSA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Design and bidding documents for rehabilitation prepared
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="911.00">

</target>
<actual value="918.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="70.00">

</target>
<actual value="86.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Driver and Vehicle Examination and Licencing Agency (DVELA) established and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average vehicle operating costs on (b) Arusha - Minjingu Roads
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2015-06-30" />
<target value="25.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P097201</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AFCC2/RI-Regional and Domestic Power Markets Development Project  (Southern Africa Power Market Project:  APL-1b)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Project development objective  Ref. PAD B.3, Technical Annex 3  The development objectives of the Project are to improve operational efficiency in the electricity sector and expand generation, transmission and distribution capacity in order to better serve domestic power demand and to support regional power market integration.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Regional and Domestic Power Markets Development Project of the Congo are to improve operational efficiency in the electricity sector and expand generation, transmission and distribution capacity in order to better serve domestic power demand and to support regional power market integration. The Project will have five components: (a) rehabilitation of generation capacities at the Inga 1 and 2 power plants to provide power to the Democratic Republic of Congo (DRC), as well as to the Southern African Power Pool and to Central Africa, (b) construction of a transmission line from Inga to Kinshasa (also serving the Republic of Congo), (c) expansion and rehabilitation of the distribution network in Kinshasa, including powering of un-electrified areas and 50,000 new connections, (d) strengthening the capacities of SNEL (notably via a program to enhance governance, including the reduction of losses in commercial operations) and of the Ministry of Energy, and (e) support to execution of the Project, including on engineering and environmental/social aspects. The project will support the Southern African Power Market Program APL series, and notably complements Phase 1 which involves the rehabilitation of the transmission line from Inga to the border of the Republic of Zambia.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0001181"><narrative>Ministry Of Finances</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0001182"><narrative>CDP-SNEL-DRC</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-03-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-05-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Frederic Verdol</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fverdol@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002593463" />
            <name><narrative>Kimbanseke II</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.4211102 15.36583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000205703" />
            <name><narrative>Province du Katanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 26</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002315443" />
            <name><narrative>Inga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.65064 13.64694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002314869" />
            <name><narrative>Kibanseke I</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.4310999 15.37999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002255459" />
            <name><narrative>Mpasa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.45583 15.88972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002314302" />
            <name><narrative>Kinshasa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.32758 15.31357</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="23111" percentage="24" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="9" xml:lang="en"/><sector vocabulary="1" code="23220" percentage="67" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LH" percentage="67.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Hydro</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="8" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="25" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="8" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="32" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="13" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="13" xml:lang="en"><narrative>Regional Integration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2007-05-31"/><value value-date="2007-05-31">296700000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">283000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-734524</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1437105</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">179787</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">2668011</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">110990</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">825296</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">65884</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">666493</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">139636</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">307640</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">94951</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">1809680</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">144186</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">56988</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">2314122</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">643200</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">5505246</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">418134</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">1308109</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">230584</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">1520282</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">109350</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">1276313</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">842619</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">1633220</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">680223</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">8758475</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">2600366</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1358321</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">1113260</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">900967</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">604993</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">1168388</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">648170</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">5888828</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">6322728</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">6173392</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">152353</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">4811374</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">25775791</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">564034</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">868236</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2658311</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">23064</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">800000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">3225526</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">577573</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">1611371</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">605707</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">1161767</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">167256</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">2004413</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">2729645</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">235766</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">326481</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">-258083</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">2260759</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">504697</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">4423568</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">1224111</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">488856</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">141911</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">3068706</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">11107428</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">10192013</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">10451129</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">2113531</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">3727021</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">544600</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">272821</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">8347326</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">2479782</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">94156</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">3469605</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">345139</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">7254307</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">4157338</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">1607767</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">18750</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1134032</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">5220811</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">4806933</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">10377243</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">6088040</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">7281612</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1970221</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">134217</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">692258</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">6694063</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">2466562</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">2206186</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1979073</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">3502614</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">862203</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2829402</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">3777685</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1683439</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">5222554</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">10754373</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">4213352</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1670977</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">1110912</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2611437</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">2536143</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">5256904</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1745513</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">2795970</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1821700</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">3070265</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">5352418</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">3364873</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">290413</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">917775</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">4261726</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1865871</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">841287</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">5779685</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">6198918</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">5178540</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">9548181</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">2591767</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">4117557</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">2797663</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">2562813</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">11073295</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">3779752</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">10403466</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">911824</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">2920146</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">457153</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1106156</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">661970</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">2069339</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2524785</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">948764</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">870550</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">1322333</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">5658674</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">2740156</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">218691</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-45312</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">2448065</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">448804</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">165679</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">186030</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">10698095</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1579018</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">883226</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">2890465</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">1049961</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">3617463</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">6217184</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">8452641</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">416137</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1348583</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">966207</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">6501719</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">434787</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">5907810</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">2763530</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">978130</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">6069099</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1799796</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">220686</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">447356</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">1094388</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">6854305</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">2267571</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">6786367</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1475461</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">7243163</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2180909</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">11609058</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">2417181</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">461104</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">717706</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">13494289</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">196453</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">4350915</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">5346656</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">3414107</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">893981</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1720643</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">1055103</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">110551</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1670359</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1993553</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-66163</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-130021</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-177720</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1182"><narrative>CDP-SNEL-DRC</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P097201"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P097201?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P097201"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total available capacity at the Inga 1 and 2 plants
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="1432.00">
<comment><narrative>
Exceeded: While total capacity stood at 700 MW when the project was launched, rehabilitated capacity will reach 860 MW, bringing total capacity at Inga plants 1 and 2 at 1,560 MW. However, reported available capacity stands currently at 1,432 MW, largely exceeding the target.
</narrative></comment>
</target>
<actual value="1310.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Hydropower constructed or rehabilitated under the project
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="632.00">
<comment><narrative>
Potentially achieved. The target was achieved at 73.5 percent and reached 632 MW against a target of 860.00 MW. Six groups were rehabilitated (G11, G12, G14, G15, G21, G22), and five groups were tuned up (G16, G24, G25, G26, and G28).
</narrative></comment>
</target>
<actual value="860.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of solar lighting products provided in off-grid areas
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="24347.00">
<comment><narrative>
Practically achieved: The target was achieved at 97 percent, following the distribution of 4,830 immovable solar lighting kits, and 19,517 portable solar lighting kits, totaling 24,347 kits.
</narrative></comment>
</target>
<actual value="25000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution lines constructed or rehabilitated under the project
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="832.00">
<comment><narrative>
Exceeded: The target of lines constructed or rehabilitated was exceeded by 34 percent, reaching 832 km and surpassing the target of 620 km, following Government's policy shift toward increased energy access in Kinshasa.
</narrative></comment>
</target>
<actual value="620.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Transmission losses Inga-Kinshasa lines
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="3.12">
<comment><narrative>
Achieved: Transmission losses were contained and were below 3% after the completion of the second T-line linking Inga and the Kinshasa, and the upgrading of the transmission and distribution network in Kinshasa
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual hours of unavailability of Inga-Kinshasa transmission lines
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="0.00">
<comment><narrative>
Achieved: With the completion of the second-high voltage transmission line Inga-Kinshasa in 2016, delivery of electricity has been continuous, and availability fully warranted.
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed or rehabilitated under the project
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="277.38">
<comment><narrative>
Exceeded: The target was exceeded by 6.7 percent, reaching 277.38 km against a target of 260km, following the completion of the second Inga-Kinshasa high voltage line in September 2016.
</narrative></comment>
</target>
<actual value="260.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy delivered  to
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="6142.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="5778.00">
<comment><narrative>
Partially Achieved: The target was achieved at 67 percent (actual delivery of 5,778.00 GWh against a target of 8,593.00 GWh), due to the rehabilitation of 6 turbines and tuning up of 5 turbines at Inga 1 and 2, and the completion of the 400 kV second line Inga-Kinshasa, and the high voltage linking Inga and Kolwezi completed under SAPMP.
</narrative></comment>
</target>
<actual value="8593.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GWhs of renewable energy generated at Inga
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="3715.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="9801.00">
<comment><narrative>
Exceeded:  Renewable energy generated by the Inga plants was multiplied by 2.6, reaching 9,801 GWHs against a target of 9,039 GWhs compared to the 2007 baseline.  Six groups were rehabilitated (G11, G12, G14, G15, G21, G22), and five groups were tuned up (G16, G24, G25, G26, and G28).
</narrative></comment>
</target>
<actual value="9039.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of qualifications to external audits
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="0.00">
<comment><narrative>
Partially Achieved: No qualifications were identified, following the support provided by the MHI in the context of the service contract.  However, there are unjustified delays in completing the last three compulsory audits of the project financial accounts
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revenues collected by SNEL per generated kWh (US$/kWh)
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.028"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="0.069">
<comment><narrative>
Achieved: The target was almost doubled, reaching US$0.069/KWh against a target of US$0.039/KWh, reflecting enhanced collection efforts, especially toward medium and high-voltage clients.
</narrative></comment>
</target>
<actual value="0.039">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable Energy  exported to SAPP
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="97.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="3.97">
<comment><narrative>
Largely missed:  The target was missed, because the energy demand in Kinshasa and in the Katanga mining region absorbed the quasi-totality of the additional electricity production by the Inga 1 and 2 plants.  Therefore, the energy demand from the SAPP region remains unfulfilled.
</narrative></comment>
</target>
<actual value="1349.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="662027.00">
<comment><narrative>
Practically Achieved:With 22,900 households connected under the project, with an average of 8 people per household, the target was achieved at 65.4 percent, beneficiaries reaching the number of 183,200, against a target of 280,000. Additional new connections supported by the Bank project (EASE) and other partners (AfDB) will be completed soon, and the target achievement is warranted in the medium term.
</narrative></comment>
</target>
<actual value="280000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ratio between number of customers and SNEL employees
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="62.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="96.00">
<comment><narrative>
Exceeded:  Following staff retirement and increase in new SNEL's clients due to new connections, the target was missed by 20 percent, with a ratio of 96 customers per employee, against a target of 120 to 150 customers per employee.
</narrative></comment>
</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of public/private partnership agreements for electricity sector
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="All"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="Zero">
<comment><narrative>
A commission has been set up to examine the existing PPP contracts, but no report has been published so far.
</narrative></comment>
</target>
<actual value="All">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people provided with access to electricity under the project by household connections
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="12301.00">
<comment><narrative>
Potentially achieved: Following connections completed in the Kimbanseke (16,500), and the Kinsenso (6,400) urban areas, the target was achieved at 65 percent of the target.  Additional new connections supported by the Bank project (EASE) and other partners (AfDB) will be completed soon, and the target achievement is warranted in the medium term.
</narrative></comment>
</target>
<actual value="35000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unserved Energy in Kinshasa
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="504.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="1.47">
<comment><narrative>
Unknown:  Estimation of unserved energy in Kinshasa will be accurately assessed only when a reliable metering system will be installed, which is financed by the AfDB and the World Bank (EASE project).
</narrative></comment>
</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable capacity rehabilitated under the project
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="632.00">
<comment><narrative>
Partially Achieved. Six groups were rehabilitated (G11, G12, G14, G15, G21, G22), and five groups were tuned up (G16, G24, G25, G26, and G28).
</narrative></comment>
</target>
<actual value="860.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SNELs actual spending on Inga maintenance based on operational maintenance plan
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="3900000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="38400000.00">
<comment><narrative>
An account in foreign currency was set up and credited with about US$35 million during the period of 2012-June 2018, with disbursements amounting to US$38.4 million over the same period.  However, the ICR team could not get adequate information on the oversight quality in the management of maintenance resources.
</narrative></comment>
</target>
<actual value="6000000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of collection of accounts receivable
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="0.00">
<comment><narrative>
Non-Achieved: By end-June 2018, collection rates had significantly improved for the middle and high voltage clients, reaching 72 percent and 82 percent respectively, but it was still very low for the low voltage segment, which reached 46 percent, against a target of 80 percent.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission capacity Inga-Kinshasa lines
</narrative></title>
<baseline year="2007" iso-date="2007-05-02" value="420.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-05-02" />
<period-end iso-date="2018-06-30" />
<target value="1350.00">
<comment><narrative>
Exceeded: Following the completion of the second T-line Inga- Kinshasa in September 2016, the transit capacity of the high voltage Inga-Kinshasa jumped from 350MW to 1,350 MW, more than tripling the target.
</narrative></comment>
</target>
<actual value="1070.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P099833</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Economic &amp; Monetary Community of Central Africa Financial Institutions</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project aims to strengthen Central African regional institutions so that they can fulfill their mandates to encourage an expanded, better governed regional market, and a more transparent, better regulated and more competitive financial system. This will facilitate the re-utilization of oil revenues for investment in Central Africa. The project supports programs approved by the member governments designed to improve the efficiency of regional institutions. This will be accomplished by strengthening regional institutions. Project outcome indicators are given in Annex 3 and include increases in the percentage of foreign reserves managed regionally byBEAC, growth of investment in regional projects (primarily infrastructure investments), and increases in the percentage of banks meeting key prudential norms.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The CEMAC (Commission de la Communaute' Economique et Mone'taire de l 'Afrique Centrale)  Regional Institutions Support Project aims to strengthen Central African regional institutions so that they can fulfill their mandates to encourage an expanded, better governed regional market, and a more transparent, better regulated and more competitive financial system. This will facilitate the reutilization of oil revenues for investment in Central Africa. There are four components to the project. The first component of the project is strengthening the Central Bank-BEAC (Banque des Etats de l 'Afrique Centrale). The project will support the implementation of the strategic plan of BEAC which covers four strategic themes: increasing the effectiveness of monetary policy; modernizing BEAC's operations; improving BEAC's governance and its policies and procedures; and enhancing BEAC's role in the region. The second component of the project is encouraging regional investment financing. This component will support BDEAC, (Banque de Developpement des Etats de l 'Afrique Centrale) implement its business plan for the next five years. The objective of BDEAC's business plan is to modernize and strengthen the institution so that it better performs its functions of promoting economic development and regional integration. The program aims to improve governance, project evaluation and portfolio management; financial management; and support activities. The third component of the project is improving regional economic policy coordination, financial sector supervision, and financial integrity. This component of the project is aims to strengthen institutions which focus on regional economic policy coordination, financial sector supervision and financial integrity. The fourth and final component of the project is support for project implementation. This component of the project will support the regional coordination team in BEAC as well as technical assistance as required for project implementation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0001297"><narrative>BEAC</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0001298"><narrative>PIU - UGRIF</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-06-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-12-04"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-02-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-02-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Gilberto de Barros</narrative></person-name><telephone>+1-202-473-1000</telephone><email>gdebarros@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000239880" />
            <name><narrative>Central African Republic</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7 21</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002260494" />
            <name><narrative>Republic of the Congo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1 15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002434508" />
            <name><narrative>Republic of Chad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 19</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="24010" percentage="33" xml:lang="en"/><sector vocabulary="1" code="24020" percentage="33" xml:lang="en"/><sector vocabulary="1" code="24030" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YS" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FP" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Financial Sector</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="3" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="6" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000142" percentage="6" xml:lang="en"><narrative>Trade Logistics</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="3" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="18" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="3" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="41" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000012" percentage="9" xml:lang="en"><narrative>Macro-financial policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="10" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="9" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000143" percentage="6" xml:lang="en"><narrative>Trade Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000031" percentage="15" xml:lang="en"><narrative>Financial Stability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000311" percentage="15" xml:lang="en"><narrative>Financial Sector oversight and policy/banking regulation &amp; restructuring</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="9" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">796875.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">416666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">796875.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">833333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">10846701.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">10846701.11</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">32000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">18000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-6544036</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-825871</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">252176</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">55660</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">886918</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">886918</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">1638400</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">817621</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">1434738</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">3311733</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-1330</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2181718</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">1343819</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1000577</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1680160</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">34116</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">503749</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">872493</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">2159187</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">3017061</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1050089</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">420036</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">995322</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">995322</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">949938</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">949938</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1291781</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">322945</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1557373</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1399836</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">3011556</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">84633</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">2437506</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">147780</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">680070</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">20561</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">975197</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-212298</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-3167</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-16081</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-22910</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-21989</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-22982</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-26949</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-32279</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-35571</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-49363</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-49574</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-51483</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-65193</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-76596</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-79193</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-80188</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-83984</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-85191</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-83081</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-79511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-78241</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-79423</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-83652</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-78454</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-82142</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-70639</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-76447</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-70919</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-65405</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-76100</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-71520</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-69516</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-70405</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-65885</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-218871</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-214953</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-211818</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-222638</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-224499</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-224109</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-216775</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-203507</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-209217</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-207286</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-208752</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-212242</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-209413</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-215800</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-213415</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1298"><narrative>PIU - UGRIF</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P099833"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P099833?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P099833"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monetary programming conducted at regional level by Y4
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="At national level"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2016-02-29" />
<target value="At regional (CEMAC) level">

</target>
<actual value="Computer model has been completed, training of staff done. Testing is underway.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated accounting plan for banks in place and used by banks by Y3
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Outdated accounting plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2016-02-29" />
<target value="In place and used by banks by Y3">

</target>
<actual value="New accounting for cross border and consolidated financial statements in place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cross-border electronic payments transactions in wholesale and retail systems (SYGMA and SYSTAC) cumulative increase of 33% by Y3 and 61% by Y5.
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="(SYGMA and SYSTAC) cumulative increase of 33% by Y3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2016-02-29" />
<target value="(SYGMA and SYSTAC) cumulative increase of 61% by Y5.">

</target>
<actual value="Cross-border payment are said to have increased by over 70%.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New BDEAC's MIS, including accounting system, substantially in place by mid-term and generating financial reports in line with international standards by Y5
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Lack of MIS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2016-02-29" />
<target value="In place by mid-term and generating financial reports in line with international standards by Y5">

</target>
<actual value="Part of the system is in place and should be completed by Project's end.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
All projects evaluated by BDEAC according to new policies by Y3.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Non-standard policies"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2016-02-29" />
<target value="All projects evaluated">

</target>
<actual value="The new policy is being finalized. New BDEAC management is keen to using it.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Growth of BDEAC financing of regional projects.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="8.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2016-02-29" />
<target value="15.00">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Plan for application of microfinance regulatory framework and supervision system in place and applied by mid-term review
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Not applied"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2016-02-29" />
<target value="In place and applied by mid-term review">

</target>
<actual value="Plan is in place.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Banks accounting for percentage increase of sector assets complying with agreed prudential norms by end of project.
</narrative></title>
<baseline year="2010" iso-date="2010-05-03" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-03" />
<period-end iso-date="2016-02-29" />
<target value="80.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in percentage of foreign reserves managed regionally by BEAC
</narrative></title>
<baseline year="2007" iso-date="2007-11-11" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-11" />
<period-end iso-date="2015-09-21" />
<target value="50.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved portfolio performance of BDEAC, as measured by increased ratio of annual disbursements/commitments in the preceding year from 43% in 2007 to 70% by Y3
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="43% in 2007"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2016-02-29" />
<target value="70% by Y3">

</target>
<actual value="60%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Central Bank/Government paper issued by Y3 (none issued now)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="None issued now"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2016-02-29" />
<target value="Central Bank/Government paper issued by Y3">

</target>
<actual value="Cameroon, Gabon and Tchad have all succesfully issued paper.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revised and applied BDEAC's policies, procedures and internal controls  by Y3
</narrative></title>
<baseline year="2008" iso-date="2008-09-30" value="Outdated policies and procedures"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-09-30" />
<period-end iso-date="2016-02-29" />
<target value="Revised and applied by Y3">

</target>
<actual value="Procedures are being developed.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P100406</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AFCC2/RI-Lake Victoria Environmental Management Project Phase II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to contribute to: (i) the improvement of the collaborative management of the trans-boundarynatural resources of the LVB among the Partner States; and (ii) the improvement of environmental management of targeted pollutionhotspots and selected degraded sub-catchments for the benefit of communities who depend on the natural resources of LVB.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Lake Victoria Environmental Management Project for Eastern Africa development objectives are to: (i) improve collaborative management of the transboundary natural resources of Lake Victoria basin (LVB) for the shared benefits o f the East African Community (EAC) partner states; and (ii) reduce environmental stress in targeted pollution hotspots and selected degraded sub catchments to improve the livelihoods of communities, who depend on the natural resources of LVB. There are four components to the project. The first component of the project is strengthening institutional capacity for managing shared water and fisheries resources. This component will focus on building the capacity of existing regional and national institutions to harmonize policies, legislation, and regulatory standards, and develop basin-wide management frameworks, to improve cooperative management of the shared transboundary water and fisheries resources of the LVB. The second component of the project is point source pollution control and prevention. This component aims at reducing environmental stresses within the lake and its littoral zone, through the rehabilitation of priority wastewater treatment facilities, promotion of industrial cleaner production technologies, installation of the lake navigation equipment, and implementation of a contingency plan for the oil spills and hazardous wastes management in the LVB. The third component of the project is watershed management. This component seeks to reduce environmental stresses from the lake basin through the implementation of sustainable soil and water management practices and livelihoods improvement interventions, using community-driven development approaches, to improve water use efficiency in the LVB and generate positive externalities to downstream countries. The fourth component of the project is project coordination and management. This component will provide resources necessary for the effective project coordination, regional and national levels communication, monitoring and evaluation activities, and sharing of information among countries.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0001336"><narrative>East African Community</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0001337"><narrative>Uganda Ministry of Finance, Planning and Economic Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0001338"><narrative>Tanzania Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0001339"><narrative>Kenya National Treasury</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0001332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-07-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-03-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jian Xie</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jxie@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000192900" />
            <name><narrative>Kericho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.36774001 35.283138</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000152221" />
            <name><narrative> Mwanza Gulf</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.5833299 32.849998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000152224" />
            <name><narrative> Mwanza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.51667 32.900002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000152451" />
            <name><narrative> Musoma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.5 33.799999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000186731" />
            <name><narrative>Migori</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.06343 34.473129</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000191242" />
            <name><narrative>Kisumu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.069 34.64</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000191299" />
            <name><narrative>Kisii</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.68173999 34.766659</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000184471" />
            <name><narrative>Nandi Hills</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.1066 35.183781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000149899" />
            <name><narrative> Simiyu River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.55 33.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000160961" />
            <name><narrative> Bukoba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.33167 31.81222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000196742" />
            <name><narrative>Homa Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.52731001 34.457142</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000199989" />
            <name><narrative>Busia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.46004999 34.111691</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000200308" />
            <name><narrative>Bomet</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.78128999 35.34156</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000228028" />
            <name><narrative> Napoleon Gulf</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.41666999 33.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000228781" />
            <name><narrative> Murchison Bay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.11667 32.616669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000231833" />
            <name><narrative> Katonga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.33333001 32.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000232422" />
            <name><narrative> Kampala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.31628001 32.582191</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000233114" />
            <name><narrative> Jinja</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.43902001 33.203171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000233508" />
            <name><narrative> Entebbe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.06444 32.44694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000383388" />
            <name><narrative>Siaya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.06116 34.28823</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000443339" />
            <name><narrative> Kampala District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.33508 32.58313</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000443359" />
            <name><narrative> Mukono District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.30000001 32.775002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000448224" />
            <name><narrative> Wakiso District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.23762999 32.478359</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="9" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="47" xml:lang="en"/><sector vocabulary="1" code="41020" percentage="30" xml:lang="en"/><sector vocabulary="1" code="73010" percentage="14" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="15" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="5" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="40" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="40" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="5" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="15" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="5" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="15" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="10" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="10" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="5" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="40" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">32500000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">27500000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">2000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">10000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">10000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-39318</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-280</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-7272</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-195088</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1386979</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-142377</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">54035</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">-2008</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">-30821</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">-5581</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">-1635</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">403613</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">4461338</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">2779333</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">737811</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-1587</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">715870</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">772232</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">480043</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-323</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">2531749</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1068335</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">3204577</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1689170</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">2326731</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">1009427</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1875535</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-4</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">-1456421</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">3826651</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">2028036</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">3632456</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">2574306</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">2006554</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1644607</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-210155</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">2637723</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2583851</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2449501</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">-208299</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">1786465</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">1439806</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">5626017</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">6771502</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-207904</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">2126002</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2280775</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">3278567</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">2260668</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-15398</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">4205782</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">2902441</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1100000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2350277</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1041817</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">551207</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">2938131</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-67451</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1875607</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">3965571</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">279364</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1429182</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1335659</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">236686</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">3276782</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">235183</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">309500</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">243281</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">299234</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-86725</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">149348</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-78989</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">331518</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-55746</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">-1123</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-15229</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">-12012</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-10388</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-16040</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">-11713</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-12545</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-17012</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">-12172</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-16754</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-18819</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">-19093</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-15970</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-22107</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">-28908</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-23693</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-25516</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">-41366</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-37294</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-27475</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">-55443</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-36346</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-38847</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">-73695</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-37266</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-49737</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">-86941</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-35300</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-67877</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-93249</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-52389</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-89150</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-105227</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-63794</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-101736</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-107042</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-64438</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-97752</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-11553</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-18695</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-108218</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-68891</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-14115</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-98460</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-23338</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-104216</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-71707</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-28593</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-33773</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-96633</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-106162</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-89291</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-38364</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-103113</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-31030</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-110645</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-95903</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-101827</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-39245</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-30718</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-110521</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-90713</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-98857</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-37919</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-31558</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-107457</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-90946</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-32603</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-37955</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-98293</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-107794</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-89607</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-96638</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-37432</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-32446</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-105504</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-88118</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-95249</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-32151</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-37576</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-103206</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-89241</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-38616</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-33473</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-97287</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-102494</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-90307</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-96579</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-39282</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-33828</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-113996</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-87832</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-97664</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-33432</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-38594</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-103075</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-84103</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-89113</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-36200</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-30953</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-96911</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-77734</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-81789</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-27567</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-34072</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-83365</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-78462</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-33206</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-90537</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-31441</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-107437</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-80800</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-86950</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-35451</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-29839</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-85533</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-77450</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-29751</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-33323</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-86800</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-100323</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-77858</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-83347</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-33022</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-28150</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-90475</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-67830</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-26550</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-80412</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-26423</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-87254</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-88108</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-88510</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-39027</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-30109</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-96026</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-77366</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-26555</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-32299</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-81228</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-242707</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-262124</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-286955</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-240288</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-261113</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-285868</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-238628</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-258240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-284677</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-246444</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-269720</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-297742</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-249705</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-273307</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-294364</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-246533</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-266892</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-160808</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-138317</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-289332</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-238591</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-153226</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-252804</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-131016</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-274924</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-222894</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-249992</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-129559</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-146548</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-275120</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-235627</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-255062</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-132187</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-153610</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-274961</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-228729</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-149214</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-251964</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-130581</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-277444</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-229490</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-251388</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-130282</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-150597</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-272160</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-233267</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-249730</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-129423</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-151742</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-269598</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-236502</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-256251</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-132803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-154544</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-285035</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-238460</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-154832</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-258461</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-133948</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-283112</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-239878</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-259933</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-156600</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-134711</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-1332"><narrative>Tanzania Ministry of Water and Irrigation</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1333"><narrative>Uganda Ministry of Water and Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1334"><narrative>Kenya Ministry of Environment and Mineral Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-1335"><narrative>Lake Victoria Basin Commission (LVBC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P100406"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P100406?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P100406"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of locations equipped with aids to navigation
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-06-29" />
<target value="8.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication notes, with summary reports on project achievements and progress on indicators, are made available to stakeholders atleast on a quarterly basis.
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people provided with access to improved sanitation facilities under the project
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="150000.00">

</target>
<actual value="122507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional standards for industrial and municipal effluent discharges for adoption by participating countries in place
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted industries adopting cleaner production in-plant assessments and/or generated cleaner production options
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="35.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GIS-based database and WRIS developed and available for public access
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication notes, with summary reports on project achievements and progress on indicators, are made available to stakeholders atleast on a quarterly basis.
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban pollution hotspots addressed through investment to control wastewater pollution
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="9.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regional strategy on water hyacinth monitoring and control, submitted by LVBC and approved by the Council of Ministers
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A draft harmonized policy on fisheries management and agreement on a strategy and timeframe for adoption, sumitted by LVBC and approved by the Council of Ministers
</narrative></title>
<baseline year="2011" iso-date="2011-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-30" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Same as for PDO indicators
</narrative></title>
<baseline year="2015" iso-date="2015-11-30" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-11-30" />
<period-end iso-date="2015-11-30" />
<target value="-">

</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of targeted industries trained on Cleaner Production Technologies
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="280.00">

</target>
<actual value="284.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people provided with access to improved sanitation facilities under the project
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="150000.00">

</target>
<actual value="245000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CDD sub-projects implemented under the project
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="660.00">

</target>
<actual value="292.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of targeted industries trained on Cleaner Production Technologies
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="280.00">

</target>
<actual value="284.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GIS-based database and WRIS developed and available for public access
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of identified water hyacinth hotspots with active monitoring and removal activities
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="41.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Fisheries Management Plan (FMP) updated
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative hectares of degraded wetlands restored and/or rehabilitated by communities in targeted sub-catchments
</narrative></title>
<baseline year="2011" iso-date="2011-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-15" />
<period-end iso-date="2017-12-29" />
<target value="1450.00">

</target>
<actual value="905.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hectares under sustainable land management practices in the targeted sub-catchments
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="8000.00">

</target>
<actual value="12337.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sanitation  facilities (public/schools) constructe/pprovided
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="67.00">

</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals trained in improved sustainable land management (SLM) practices
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="12000.00">

</target>
<actual value="18576.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Individuals adopting improved SLM under the project
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="10000.00">

</target>
<actual value="8762.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E and MIS system implemented and updated according to schedule
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A draft harmonized policy on water management and agreement on a strategy and timeframe for adoption, submitted by LVBC and approved by the Council of Ministers
</narrative></title>
<baseline year="2011" iso-date="2011-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-31" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of identified water hyacinth hotspots with active monitoring and removal activities
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="41.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Fisheries Management Plan (FMP) updated
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CDD sub-projects implemented under the project
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="660.00">

</target>
<actual value="316.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of locations equipped with aids to navigation
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-06-29" />
<target value="8.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative hectares of degraded wetlands restored and/or rehabilitated by communities in targeted sub-catchments
</narrative></title>
<baseline year="2011" iso-date="2011-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-15" />
<period-end iso-date="2017-12-29" />
<target value="1450.00">

</target>
<actual value="938.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A draft harmonized policy on fisheries management and agreement on a strategy and timeframe for adoption, sumitted by LVBC and approved by the Council of Ministers
</narrative></title>
<baseline year="2011" iso-date="2011-01-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-30" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regional strategy on water hyacinth monitoring and control, submitted by LVBC and approved by the Council of Ministers
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Same as for PDO indicators
</narrative></title>
<baseline year="2015" iso-date="2015-11-30" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-11-30" />
<period-end iso-date="2015-11-30" />
<target value="-">

</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional standards for industrial and municipal effluent discharges for adoption by participating countries in place
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban pollution hotspots addressed through investment to control wastewater pollution
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="9.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hectares under sustainable land management practices in the targeted sub-catchments
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="8000.00">

</target>
<actual value="9625.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals trained in improved sustainable land management (SLM) practices
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="12000.00">

</target>
<actual value="18576.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of preliminary technical designs for wastewater treatment facilities
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="15.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Harmonized monitoring protocols and schedules in place
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sanitation  facilities (public/schools) constructe/pprovided
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="67.00">

</target>
<actual value="109.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted industries adopting cleaner production in-plant assessments and/or generated cleaner production options
</narrative></title>
<baseline year="2011" iso-date="2011-01-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-19" />
<period-end iso-date="2017-12-29" />
<target value="35.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E and MIS system implemented and updated according to schedule
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A draft harmonized policy on water management and agreement on a strategy and timeframe for adoption, submitted by LVBC and approved by the Council of Ministers
</narrative></title>
<baseline year="2011" iso-date="2011-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-31" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Harmonized monitoring protocols and schedules in place
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Individuals adopting improved SLM under the project
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="10000.00">

</target>
<actual value="8762.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of preliminary technical designs for wastewater treatment facilities
</narrative></title>
<baseline year="2011" iso-date="2011-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-15" />
<period-end iso-date="2017-12-29" />
<target value="15.00">

</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P112688</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AFCC2/RI-East Africa Agricultural Productivity Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to: (i) enhance regional specialization in agricultural research; (ii) enhance collaboration in agriculture training andtechnology dissemination; and (iii) facilitate increased transfer of agricultural technology, information, and knowledge across national boundaries.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the First Agricultural Productivity Program Project for Eastern Africa are to: (i) enhance regional specialization in agricultural research; (ii) enhance collaboration in agriculture training and technology dissemination; and (iii) facilitate increased transfer of agricultural technology, information, and knowledge across national boundaries. There are four components to the project, the first component being strengthening Regional Centers of Excellence (RCoE). This component aims at strengthening the institutional capacities that are needed to establish RCoE. Capacity strengthening will focus on the physical facilities and human resources needed to sustain program objectives and outcomes at both the regional and national levels. The second component is the technology generation, training, and dissemination. This component will support technology generation, training, and dissemination that have been agreed at national and regional levels as evidenced by inclusion in an annual regional research plan for each commodity and for training and dissemination. The third component is the improved availability of seeds and livestock germplasm. This component will support multiplication of seeds and breeds, strengthen the enabling environment for regional seed and breed trade, and improve the capacity of seed and breed producers and traders. Finally, the fourth component is the project coordination and management. This component will finance management and coordination at the national and regional levels.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0002495"><narrative>Ministry of Agriculture</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0002497"><narrative>Ministry of Agriculture</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0002498"><narrative>Ministry of Agriculture, Animal Industry and Fisheries</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0002496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-05-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-06-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Assaye Legesse</narrative></person-name><telephone>+1-202-473-1000</telephone><email>alegesse@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000149590" />
            <name><narrative>United Republic of Tanzania</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6 35</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000192950" />
            <name><narrative>Republic of Kenya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1 38</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000337996" />
            <name><narrative>Federal Democratic Republic of Ethiopia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9 39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31110" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31150" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31182" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31195" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="12" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="12" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="12" xml:lang="en"><narrative>Rural Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2475000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1575000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">887750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">759333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">759333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">759333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">759333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">759333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">991666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">991666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">991666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">991666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">991666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2475000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1575000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">887750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">759333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">759333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">759333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">759333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">759333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-3667</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-27</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-246957</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-4292</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">1172190</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">2575223</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">2355929</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">40000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">5925740</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">33812</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">8331488</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">123347</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1375</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">186041</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">46024</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">197490</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">80000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">16077</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">26631</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">26458</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">4098516</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">223952</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">26581</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">499415</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">421764</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">162018</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">187755</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">438282</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">3657860</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">80000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">181320</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">492938</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">2213136</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">304856</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">547339</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">487082</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">574769</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">303858</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">120000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">361700</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">286664</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">3764883</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">3309563</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">2043812</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">506615</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">700000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">5137578</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">832525</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">7396748</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">821553</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">364006</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">658941</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">5155885</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">295563</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1491604</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">3756816</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">212433</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">623653</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">1958290</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1261436</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">966286</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">660413</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">314221</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">274135</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">220223</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2213677</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">591415</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">719675</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">839867</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1401700</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">5304535</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">320000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">4591724</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">758877</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">302024</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">241549</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1058508</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">734590</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">2214578</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1181632</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">792268</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">488105</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1200000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">533500</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1222898</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">503371</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">539355</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">636522</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">264676</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">876265</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1160587</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">108235</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">560707</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">790000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">32599</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-22853</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">-1531</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-6580</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-9875</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">-8583</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-15443</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-28637</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-12393</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">-13691</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-31630</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-33365</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-13566</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">-18588</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-30734</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-32586</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-16106</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">-28315</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-30618</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-35140</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-21709</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">-42311</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-29911</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-44216</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-28550</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">-41255</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-57522</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-54886</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-64573</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">-67986</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-70711</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-83384</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-75577</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">-81590</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-82206</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-87934</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-84826</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-97176</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-92478</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-87623</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-94581</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-101960</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-102579</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-103803</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-107028</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-102310</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-104219</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-99290</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-105937</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-105205</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-97947</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-103062</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-101030</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-101314</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-96146</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-100836</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-102404</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-103206</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-102183</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-108126</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-107598</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-107564</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-101747</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-106257</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-106358</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-107443</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-98431</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-103279</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-103941</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-104465</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-98478</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-103097</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-104268</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-104793</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-102330</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-97570</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-99600</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-102566</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-100915</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-96221</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-101589</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-100332</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-103094</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-98299</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-102155</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-99640</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-102363</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-96570</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-108534</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-110822</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-103489</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-100054</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-102857</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-100204</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-90064</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-94458</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-94363</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-94212</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-82714</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-86749</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-78565</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-81043</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-91361</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-95967</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-107315</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-104445</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-88096</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-92189</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-83644</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-83151</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-87752</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-92032</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-97219</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-97529</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-84287</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-88398</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-88340</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-87956</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-81364</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-85333</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-88043</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-84824</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-89494</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-93859</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-90824</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-93352</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-82198</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-86208</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-89910</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-278049</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-278964</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-273859</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-261121</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-278202</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-277907</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-258249</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-270846</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-277683</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-276749</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-269729</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-282886</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-289034</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-289450</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-274347</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-286648</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-289273</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-286167</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-266900</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-279920</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-280704</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-281275</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-265144</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-252812</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-267696</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-267267</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-262195</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-250000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-267493</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-267458</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-267513</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-255213</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-268260</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-267304</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-264263</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-251972</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-269499</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-269717</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-263660</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-251397</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-264841</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-264581</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-261920</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-249738</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-263664</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-262090</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-268760</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-256260</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-273808</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-277097</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-271077</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-258469</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-275072</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-275228</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-272621</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-259942</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-274841</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-2496"><narrative>Ministry of Agriculture Food Security and Cooperatives</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112688"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P112688?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112688"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of stakeholder satisfaction with the technologie, innovations and uptake pathways.
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="75.00">

</target>
<actual value="67.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of Change in regional specialization and collaboration in agricultural research
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="72.50">

</target>
<actual value="73.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase of new technologies developed by RCoEs
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="211.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="534.00">

</target>
<actual value="472.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of increase in information and knowledge transfer across national boundaries.
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="85.00">

</target>
<actual value="72.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase of cultivars for selected commodities registered in more than one EAAPP country (number per selected commodity)
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="35.00">

</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of stakeholders whose priority capacity building needs have been addressed.
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="103580.00">

</target>
<actual value="735541.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staffing of research effort on regional research projects according to plan
</narrative></title>
<baseline year="2011" iso-date="2011-06-30" value="192.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-30" />
<period-end iso-date="2015-12-31" />
<target value="904.00">

</target>
<actual value="834.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in regional technology uptake pathways
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="73.00">

</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of regional agricultural research projects (percent of total research projects of each RCoE
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="36.00">

</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Harmonized M&amp;E system for RCoEs in cooperation with ASARECA developed, adopted and implemented
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="91.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Acquisition of research infrastructure and equipment according to plan
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in existing and new technologies disseminated in more than one EAAPP country per selected commodity
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="71.00">

</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of relevant policies, laws, regualations and/or procedures reviewed for harmonization
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="12.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of agribusiness units established or strengthened
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="172.00">

</target>
<actual value="270.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in land area with seeds of improved cultivars
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="14.00">

</target>
<actual value="15.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of demand driven gende responsive technologies made available to uptake pathways
</narrative></title>
<baseline year="2012" iso-date="2012-11-15" value="318.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-11-15" />
<period-end iso-date="2015-12-31" />
<target value="144.00">

</target>
<actual value="138.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in productivity at farm level over control technology for all disseminated new technologies
</narrative></title>
<baseline year="2009" iso-date="2009-05-15" value="3.03"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-05-15" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="9.40">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P118316</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AFCC2/RI-Lake Victoria Environmental Management Project (Burundi and Rwanda)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to contribute to: (i) the improvement of the collaborative management of the trans-boundary natural resources of the LVB among the Partner States; and (ii) the improvement of environmental management of targeted pollution hotspots and selected degraded sub-catchments for the benefit of communities who depend on the natural resources of LVB.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Adaptable Program Loan for the Second Phase of the Lake Victoria Environmental Management Project are to: improve the collaborative management of the transboundary natural resources of Lake Victoria Basin (LVB) for the shared benefits of the partner states; and reduce environmental stress in targeted pollution hotspots and selected degraded sub-catchments to improve the livelihoods of communities, who depend on the natural resources of LVB. There are four components to the project. The first component of the project is strengthening institutional capacity for managing shared water and fisheries resources. This component will focus on building the capacity and increasing the effectiveness of the existing national institutions in Burundi and Rwanda to manage the water and fisheries resources in the Kagera River Basin, and improve the cooperative management of shared transboundary natural resources of the Lake Victoria Basin. The second component of the project is point source pollution control and prevention. The main objective of this component is to reduce environmental stresses from point source pollution, especially municipal wastewaters, on the rivers, wetlands, and lakes in the LVB portion of Rwanda and Burundi. The third component of the project is watershed management. This component seeks to reduce environmental stresses in the LVB through integrated watershed management, including the rehabilitation of degraded wetlands and river banks, and the adoption of on-farm soil and water conservation programs on the hillsides. The fourth component of the project is project coordination and management. This component will provide resources necessary for effective project coordination, regional and national levels communication and capacity building, monitoring and evaluation activities, and sharing of information among countries.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0003549"><narrative>Minister of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0003550"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0003547"><narrative>MEEATU</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-07-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-06-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jian Xie</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jxie@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000148996" />
            <name><narrative>Lake Victoria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1 33</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006413337" />
            <name><narrative>Eastern Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.75 30.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006413338" />
            <name><narrative>Umujyi wa Kigali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.91667 30.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006413339" />
            <name><narrative>Province du Nord</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.58333 29.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006413340" />
            <name><narrative>Province de l' Ouest</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.1666701 29.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006413341" />
            <name><narrative>Intara y' Amajyepfo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.3333299 29.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007582196" />
            <name><narrative>Rweru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.3656 29.841499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000432455" />
            <name><narrative>iProvense ya Kirundo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.5833299 30.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000432456" />
            <name><narrative>Kirundo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.5845001 30.0959</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000428218" />
            <name><narrative>iProvense ya Karuzi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.125 30.133329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000434386" />
            <name><narrative>iProvense ya Mwaro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.5 29.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690211" />
            <name><narrative>Karongi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.1296 29.361719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690214" />
            <name><narrative>Muhanga District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.9391201 29.71805</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690215" />
            <name><narrative>Kamonyi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.0052099 29.89817</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690218" />
            <name><narrative>Nyamagabe District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.40819 29.46797</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690219" />
            <name><narrative>Huye District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.51704 29.69603</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000201674" />
            <name><narrative>Nyabarongo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.3457999 30.372999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000202061" />
            <name><narrative>Kigali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.94995 30.058849</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000201842" />
            <name><narrative>Lac Mugesera</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.10833 30.308331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000426271" />
            <name><narrative>iProvense ya Gitega</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.5 29.950001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000426272" />
            <name><narrative>Gitega</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.4263999 29.930799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007688802" />
            <name><narrative>Rwamagana District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.97281 30.35428</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007688803" />
            <name><narrative>Bugesera District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.23456 30.148251</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007688804" />
            <name><narrative>Ngoma District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.1853199 30.46961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007688807" />
            <name><narrative>Rulindo District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.7382801 29.99794</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007688810" />
            <name><narrative>Gakenke District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.6981 29.785431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690204" />
            <name><narrative>Gasabo District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.8846999 30.131411</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690205" />
            <name><narrative>Nyarugenge District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.99095 30.021271</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007690206" />
            <name><narrative>Kicukiro District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.0039101 30.146959</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="7" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="7" xml:lang="en"/><sector vocabulary="1" code="41020" percentage="31" xml:lang="en"/><sector vocabulary="1" code="41030" percentage="55" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="19" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="14" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="33" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="3" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="19" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="34" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="34" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="3" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="42" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="34" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="68" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="14" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="19" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="68" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="33" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="33" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="14" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="14" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="42" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="34" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">4343673.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">4343673.65</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">15000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-218396</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-506795</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">579700</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">700000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">77859</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">66224</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">52903</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">101910</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">315622</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">206866</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">180216</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">174609</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">210928</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">181204</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">259028</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">119257</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">50932</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">105079</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">104596</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">444877</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">99179</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">69607</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">237369</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">229850</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">301690</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">492830</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">164943</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">78586</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">894352</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">59620</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">639787</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">322082</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">128603</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">472323</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">624883</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">110025</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">779479</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">461683</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">782139</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">311558</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">398231</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">295955</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">284176</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">103601</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">699655</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">405111</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">588197</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">600017</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">49269</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">553924</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">616786</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">7717</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">25177</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">478045</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">413456</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">494533</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">163383</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">421837</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">36468</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">419924</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">33909</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">35566</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">885034</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">508774</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">187539</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">338416</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">571447</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">188788</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">292804</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">237033</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">300246</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">414010</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">255007</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">540461</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">224086</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">742380</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">102569</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">803096</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">239027</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">303312</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">196273</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">8686</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-1370</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-2686</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-3048</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-3808</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-4640</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-6330</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-12036</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-15631</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-24125</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-28621</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-33488</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-38086</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-47122</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-46229</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-46251</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-45844</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-46241</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-49244</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-47709</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-45965</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-43724</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-42993</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-43200</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-42136</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-39649</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-43336</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-41572</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-41534</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-126975</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-125231</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-117628</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-119255</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-118887</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-118256</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-119664</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-117150</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-122409</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-123215</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-3547"><narrative>MEEATU</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-3548"><narrative>Rwanda Environment Management Authority</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118316"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P118316?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118316"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of community natural resource management subprojects whose implementation is rated satisfactory or better in the targeted sub-catchments
</narrative></title>
<baseline year="2012" iso-date="2012-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-02-01" />
<period-end iso-date="2017-12-29" />
<target value="76.00">
<comment><narrative>
This target was achieved (68 percent in Burundi and 82 percent in Rwanda). The results were based on completion surveys conducted on 34 CDD sub-projects in Burundi, and 54 CDD and 22 CMI projects in Rwanda (source: project completion reports for Burundi and Rwanda).
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban centers with assessment of point source pollution hotspots (Pollution Control Plans)
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="8.00">
<comment><narrative>
The original target was 100% achieved; overachieved in Burundi (3 against target of 2), and underachieved in Rwanda (5 against a target of 6) In Rwanda, pollution level assessments and Pollution Control Plans were prepared for the districts of Kicukiro, Gasabo, Musanze, Huye, and Muhanga. This indicator measured progress towards the identification of point source pollution hotspots in priority municipalities. Potential point source pollution hotspots were: municipal slaughterhouses, markets, bus stations, soccer field, schools, health clinics, etc.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communication notes, with summary reports on project achievements and progress on indicators, are made avaialble to stakeholders atleast on a quarterly basis
</narrative></title>
<baseline year="2012" iso-date="2012-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-02-01" />
<period-end iso-date="2017-12-29" />
<target value="8.00">
<comment><narrative>
This indicator was achieved.  The actual value at end project was provided by the LVBC, although it is not clear what it reflects, nor does the PAD provide details as to how the target was set.  Both countries communicated project news and results through various media.  In Burundi, the project supported newsletters and brochure which were regularly produced but did not contain data on result indicators in Burundi. In addition, there were radio broadcasts, the website was maintained, and a mini documentary on LVEMP II achievements was produced. For Rwanda, the webpage was developed (http://lvemp2.rema.gov.rw) and regularly updated, 12 Newsletters (http://lvemp2.rema.gov.rw/news/newsletter/) published; 5 short videos; a Semi-Annual communication report was prepared and submitted; The documentary on LVEMP II achievements was produced, 600 brochures were produced and disseminated.  There reports were shared with stakeholders on a regular basis.
-
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="45427.00">
<comment><narrative>
Achieved (98%). The target was not amended throughout the project. For Burundi, this indicator also includes the number of children benefiting from access to improved sanitation facilities at education institutions. The percentage of female beneficiaries (36.2% fr Rwanda and 54% for Burundi) was achieved for both countries. The minimum female participation required by law is 30% in both countries.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of National Strategic Plan for Wetland Conservation
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="Y">
<comment><narrative>
This target was achieved. Both countries have plans developed, and the one for Burundi was approved by government.  The one for Rwanda has been validated but not yet approved.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of farmers in project intervention areas using improved farm methods
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="83.00">
<comment><narrative>
The original target was achieved. However, it was not possible to disaggregate by gender as originally required and a 50% split is assumed. Poor land use and poor farming practices cause soil erosion and lead to siltation of water bodies. This indicator measures the level of adoption of on-farm soil and water conservation programs on the hillsides, as a way to reduce non-point sources of pollution.  Good farming practices also improve land productivity and ultimately would also impact farmers' incomes.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Target industries in the LVB adhering to the harmonized effluent standards
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="30.00">
<comment><narrative>
The target was significantly exceeded.The original target was measured as a percentage (25% from 25 target industries) to reflect an absolute number 8. The actual achieved at project end is based on LVBC Results Framework tables, showing that Rwanda achieved 25 (against a target 3) and Burundi achieved 5 (against a target 2). The Project Completion Report from LVBC (dated March 2018), however, reported a much larger number 76 (RW 71, BI 5).
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban pollution hotspots addressed through investments to control wastewater pollution
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="42.00">
<comment><narrative>
Revised target achieved. The target for Rwanda was reduced to 0 in 2016 because most of the money was reallocated in favor of component 3, while retaining funding for only preparatory studies for a future phase of sanitation investments. In Burundi, the target had to be reduced because of depreciation of the SDR.
</narrative></comment>
</target>
<actual value="41.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hectares under sustainable land management practices in the targeted sub-catchments
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="15352.00">
<comment><narrative>
Target exceeded (118% achieved). The target was reached by December 2016 (13,150 ha) . Activites included terracing, river bank protection, wetlands protection and reforestation.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E/MIS system implemented and updated according to schedule
</narrative></title>
<baseline year="2012" iso-date="2012-02-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-02-01" />
<period-end iso-date="2017-12-29" />
<target value="Y">
<comment><narrative>
The revised target was achieved. Originally, this indicator was divided into two indicators, one for the M&amp;E system and another for the MIS (Management Information System) but the two were combined into one since the M&amp;E and MIS systems were combined. According t the PAD, the first reports were to produced in year 4 of the project implementation.  In both countries, M&amp;E tools were developed and used to document project achievements on a quarterly basis; GIS data were collected (GPS)  for all project activities and were regularly updated.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of education centers with improved on-site sanitation facilities -Burundi only
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="34.00">
<comment><narrative>
The original target was 100% achieved. Building on an existing study of public sanitation needs in the second largest town, Gitega, the project supported similar analyses in 3 other provincial capitals within target watersheds, and improve sanitation facilities i schools and market places, which posed problems of concentrated sources of sewage and risks to public health.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hectares of degraded wetlands restored and/or rehabilitated by communities in targeted sub-catchments
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="820.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="2050.70">
<comment><narrative>
The target was reached in 2016, and exceed by over 50% by end project.  Rehabilitation of degraded wetlands and river banks and the adoption of on-farm soil and water conservation programs on the hillsides helps reduce environmental stresses and addresses (amongther things) non-point sources of pollution (sediment loads, nutrients, and agrochemicals) in LVB.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Target industries in the LVB adopting Cleaner Production Technologies
</narrative></title>
<baseline year="2011" iso-date="2011-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-06-13" />
<period-end iso-date="2017-12-29" />
<target value="33.00">
<comment><narrative>
Target significantly exceeded.  The original target was measured as a percentage (30% from 25 target industries) to reflect an absolute number 5. Twenty five industries in Rwanda adopted such technologies.  Kigali, the capital city, is by far the largest urban center in the Basin, thus providing a much larger number and range of industries which could participate in reducing industrial pollution by promoting on-site pre-treatment of waste from industries and enhanced resource efficiency in the use of raw materials – through sorting, reuse, and recycling activities.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P122478</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AFCC2/RI-ACBF Regional Capacity Building Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To (i) improve capacity of ACBF's clients to deliver and measure their developmentresults; and (ii) enhance ACBF's organizational effectiveness and efficiency.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The African Capacity Building Foundation (ACBF) Regional Capacity Building Project objectives are to contribute to: (i) enhanced capacity for effective policy formulation and management in ACBF sub-grant recipients' countries; and (ii) improved and sustained management of ACBF's operations. There are two components to the project. The first component 'capacity building sub-grants' will finance ACBF sub-grants to public and private beneficiaries in Sub-Saharan African countries and to regional organizations serving these countries. The sub-grants will finance technical assistance subprojects approved under SMTP2 (Strategic Medium Term Plan) to enhance the institutional capacities of these beneficiaries in the following areas: (i) economic policy analysis and development management; (ii) financial management, accountability, and transparency; (iii) national statistics and statistical systems; and (iv) regional economic cooperation and integration and provision of regional public goods. The second component 'institutional development' will consist of: (a) continued implementation of the management action plan, (b) development of a forward looking medium term strategy (SMTP3), including enhancement of the monitoring and evaluation system; and (c) appraisal, supervision, and evaluation of subprojects; and (d) development and implementation of knowledge and learning activities designed to enhance skills and peer learning in economic and public sector management in Africa; all through the provision of goods, services, training, and operating expenses, including staff salaries.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0004692"><narrative>African Capacity Building Foundation (ACBF)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0004692"><narrative>African Capacity Building Foundation (ACBF)</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0004693"><narrative>African Capacity Building Foundation (ACBF)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-03-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-03-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Deryck R. Brown</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000909129" />
            <name><narrative>Lusaka Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.41667 29</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002253354" />
            <name><narrative>Dakar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.6937 -17.444059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000344979" />
            <name><narrative>Addis Ababa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.0249701 38.746891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002245662" />
            <name><narrative>Republic of Senegal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>14.5 -14.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002260494" />
            <name><narrative>Republic of the Congo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1 15.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002260535" />
            <name><narrative>Brazzaville</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.26613 15.28318</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002300660" />
            <name><narrative>Republic of Ghana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.1000004 -1.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002306104" />
            <name><narrative>Accra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5560198 -0.1969</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002372248" />
            <name><narrative>Republic of Guinea-Bissau</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12 -15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002434508" />
            <name><narrative>Republic of Chad</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>15 19</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000239880" />
            <name><narrative>Central African Republic</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7 21</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000149590" />
            <name><narrative>United Republic of Tanzania</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6 35</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000226074" />
            <name><narrative>Republic of Uganda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1.25 32.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000115" percentage="8" xml:lang="en"><narrative>Subnational Fiscal Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="5" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="19" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="20" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="15" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="13" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="8" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="5" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="5" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="5" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="2" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="5" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="5" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="8" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="8" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="5" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="15" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="5" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="5" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="5" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="8" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="5" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="15" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="19" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="5" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000423" percentage="5" xml:lang="en"><narrative>Personal and Property Rights</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="8" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="8" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="19" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000422" percentage="5" xml:lang="en"><narrative>Legal Institutions for a Market Economy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="8" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000135" percentage="8" xml:lang="en"><narrative>Migration, Remittances and Diaspora Engagement</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">25000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">65000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-13558</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-29742</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">4887753</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">772000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">1160000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">942156</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">668511</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">15741837</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">990000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">12200000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">3152441</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">802300</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">987931</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">4158928</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">4353467</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">395204</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">1314101</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">3799370</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">644766</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">3659131</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1667919</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">613365</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">2627192</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">636971</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">417365</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">1516868</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1472739</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">469869</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">543382</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">355915</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">3965197</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">370255</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">1196967</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">2750084</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">728044</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">650000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1473751</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-8895</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-4693"><narrative>African Capacity Building Foundation (ACBF)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122478"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122478?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122478"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of activities implemented from Annual Business Plans
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="96.00">
<comment><narrative>
Target exceeded: 101.05 percent of target achieved. This is the average execution rate of ACBF departmental work plans at project closing. The breakdown by department is: OPD (91 percent); K&amp;L (95 percent); FAD (98 percent); RSPD (94 percent); LAD (95 percent); and IAD (100 percent). ACBF could not implement some planned activities (eg. in K&amp;L) due to insufficient funds.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of ACBF clients with functional M&amp;E systems
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="25.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="83.00">
<comment><narrative>
Target exceeded: 103.75 percent of target achieved. Criteria used to measure M&amp;E system functionality among ACBF clients include: timely submission of quarterly reports, completion of RIDA data instrument, generation of success stories, and designation of an M&amp;E focal point (person).
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of total staff costs to cash out flows
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="22.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="14.60">
<comment><narrative>
Target exceeded: 114.12 percent of target achieved. ACBF states that continuous efforts are being made to contain and reduce institutional costs while maintaining high service quality.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants attending long and short-term trainings conducted by ACBF clients (cumulative)
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="300.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="30054.00">
<comment><narrative>
Target exceeded: 563.94 percent of target achieved. The 2017 mid-year measure recorded 1,712 enrolments in six long-term training programs and 3,575 in short-term training from 7 think tanks and 4 regional development organizations. The numbers seem large because (i) although ACBF only provided a limited number of scholarships to facilitate full-time participation, many of the facilities that made the courses operational (eg. libraries, computer labs, classrooms) were funded with the proceeds of ACBF grants and thereforell participants benefited from ACBF funding whether they received direct financial support or not; and (ii) there was a massive expansion of online training offerings that expanded access to training and increased the enrolment numbers.
</narrative></comment>
</target>
<actual value="1800.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subprojects in ACBF portfolio rated satisfactory and above
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="62.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="90.00">
<comment><narrative>
116.89 percent of target achieved. This includes sub-projects rated Highly Satisfactory (HS), Satisfactory (S) and Moderately Satisfactory (MS).
</narrative></comment>
</target>
<actual value="77.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of total disbursements (including knowledge products) to cash outflows (Efficiency Ratio)
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="63.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="80.00">
<comment><narrative>
100 percent of target achieved. This signals that a significant proportion of ACBF resources was spent on programmatic activities including Knowledge &amp; Learning products.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of requests for products and services received by ACBFs clients
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="200.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="6673.00">
<comment><narrative>
556 percent of target achieved. 664 requests were recorded from 15 sub-projects.
</narrative></comment>
</target>
<actual value="1200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of times ACBF K&amp;L products/documents are downloaded in (a) Africa and (b) Rest of the world
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="5000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="310711.00">
<comment><narrative>
Target exceeded: 586.39 percent of target achieved. Targeted campaigns including social media contributed to an increase in the number of downloads. Data on the number of downloads is collected from the ACBF website, virtual library and partner websites using Advanced Web Statistics 7.6 application.
</narrative></comment>
</target>
<actual value="55000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction of ACBF clients (a) products and (b) services
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="91.00">
<comment><narrative>
102 percent of target achieved for 1.a and 113.75 percent for 1.b. The two measures cover products and services offered by ACBF sub-projects to meet their clients needs. The data are derived from satisfaction surveys conducted during the reporting period by 14 sub-projects involving 1,400 respondents.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of engagements/interactions between ACBF clients and policymakers (cumulative)
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="60.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="2111.00">
<comment><narrative>
Target exceeded: 586.39 percent of target achieved. 13 sub-projects had 349 policy engagements/interactions.
</narrative></comment>
</target>
<actual value="360.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of times ACBF K&amp;L products are cited.
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="2500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="276942.00">
<comment><narrative>
Target exceeded: 219.75 percent of target achieved. The increase is attributed to direct targeting of individual faculty members in academic institutions. The figure refers to citations generated from online publications, using the 'Publish or Perish' platform an Google Scholar.
</narrative></comment>
</target>
<actual value="12500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of clients products that have undergone peer review process (or any other quality control mechanism)
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="100.00">
<comment><narrative>
Target exceeded: 125 percent of target achieved. All products generated by ACBF clients were subjected to a peer review/quality control process.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Actual contributions from African governments to SMTP III
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="24350000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="22930000.00">
<comment><narrative>
Target not achieved: There was a shortfall of USD 12,070,000 or 34.48 percent. This partially reflects the fall-off of African contributions after ACBF's operations were limited to 15 countries (the so-called reduced footprint), which provided a disincentive for countries that had originally pledged but were not included on the list of 15. In addition, as with all African regional institutions, ACBF experienced difficulties in collecting on pledges.
</narrative></comment>
</target>
<actual value="35000000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of portfolio reviews conducted
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="4.00">
<comment><narrative>
Target exceeded: 200 percent of target achieved. By the time of project closing on December 31, 2017 ACBF was doing quarterly portfolio reviews.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of requests received by ACBF for K&amp;L products
</narrative></title>
<baseline year="2013" iso-date="2013-12-05" value="140.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-05" />
<period-end iso-date="2017-12-29" />
<target value="1119.00">
<comment><narrative>
Target exceeded: 373 percent of target achieved. Most requests were generated from events attended by ACBF staff and feedback from email alerts.
</narrative></comment>
</target>
<actual value="300.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P124351</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Kafue-Muzuma-Victoria Falls Regional Transmission Line Reinforcement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the reliability of ZESCO's regional power trade transmission network infrastructure along the Kafue Town - Muzuma - Victoria Falls corridor.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project for Africa is to improve the reliability of Environmental and Social Affairs Unit (ZESCO's) regional power trade transmission network infrastructure along the Kafue Town - Muzuma - Victoria Falls corridor. There are three components to the project. The first component is upgrading of the existing 220kV transmission line. This component consists of: (i) replacing, on the same towers, the existing 341 kilometers of 220kV transmission line from Kafue-town through Muzuma to the new Livingstone substation with a new 330 kV transmission line; and (ii) reinforcing the portion of line about 7 km from the Livingstone substation to Victoria Falls substation. The existing bay and the line control and monitoring system at Victoria Falls substation will also be reinforced due to the increase in capacity of the line. The second component is reinforcement and construction of substations. The upgrading of the two substations at Kafue town and Muzuma, and the construction of a new 330/220kV substation at Livingstone is complementary to the upgrading of the existing transmission lines to form a well functioning transmission system. This will provide a high level of security and high quality of supply for the regional power trade. The third component is project management, environmental and social mitigation, and training. This component will support (i) the financing of the services of the engineering and project implementation management consultant; (ii) environmental and social mitigation activities as detailed in the project's environmental impact assessment and Resettlement Policy Framework (RPF); (iii) technical assistance to ZESCO in designing, developing and executing investment projects for improved service delivery in electricity generation, transmission and distribution; (iv) strengthening of the project implementation team for effective project monitoring and implementation; and the financing of the operating expenses of the project implementation unit.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0005559"><narrative>Ministry of Energy</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0005560"><narrative>ZESCO</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-05-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-05-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-06-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-06-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mirlan Aldayarov</narrative></person-name><telephone>+1-202-473-1000</telephone><email>maldayarov@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000909845" />
            <name><narrative>Luapula Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11 29</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23630" percentage="96" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="92.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="17" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="17" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">857785.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">857785.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">857785.59</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">857785.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">857785.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">857785.59</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">857785.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">857785.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">857785.59</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2018-06-29"/>
<value currency="USD" value-date="2018-06-29">7401401.36</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2018-06-29"/>
<value currency="USD" value-date="2018-06-29">7401401.36</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">60000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-10941</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">11000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">2628967</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">2081125</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">8805041</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">4233480</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">68514</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">6664512</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">709446</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">3061714</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">5459440</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">3733774</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">633148</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">74548</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">27172</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">924430</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">41766</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">81867</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1690084</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-190</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">690000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-10238</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-40830</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-41009</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-37099</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-51597</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-55560</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-100219</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-174765</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-184319</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-198093</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-196931</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-193157</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-190677</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1933</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-188426</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1795</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-191600</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-202031</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-197478</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-191696</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-180013</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-497</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-185164</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-180029</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-179706</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-168188</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-170408</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-193609</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-180659</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-480036</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1313</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-497548</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-489626</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-493924</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-501380</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-494295</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-511031</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-503691</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-5560"><narrative>ZESCO</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P124351"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P124351?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P124351"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Substations upgraded and functional (Kafue Town)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="2018-06-29" />
<target value="Y">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Substations Constructed and functional (Livingstone)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="2018-06-29" />
<target value="Y">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Substation Upgraded and functional (Muzuma)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="2018-06-29" />
<target value="YES">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed or rehabilitated under the project
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="2018-06-29" />
<target value="348.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission Line capacity between Kafue Town and Livingstone substations
</narrative></title>
<baseline year="2017" iso-date="2017-03-31" value="220000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-31" />
<period-end iso-date="2018-06-29" />
<target value="330000.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average interruption frequency per year in the project area
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="2018-06-29" />
<target value="2.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed (%)
</narrative></title>
<baseline year="2012" iso-date="2012-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-30" />
<period-end iso-date="2018-06-29" />
<target value="100.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" hierarchy="1"><iati-identifier>44000-P131426</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>South Sudan- Eastern Africa Regional Transport , Trade and Development Facilitation Program (Phase One)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to enhance regional connectivity and integration of the Recipient with its Eastern Africa neighboring countries, and its access to sea ports.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the First Phase of the Eastern Africa Regional Transport, Trade, and Development Facilitation Project for South Sudan is to enhance regional connectivity and integration of the Recipient with its Eastern Africa neighboring countries, and its access to sea ports. The project has four components. The first component, support to the Ministry of Transport, Roads, and Bridges (MTRB) consists of following three sub-components: (i) upgrading of approximately 125 kilo meter (km) of the Juba-Torit road section of the Juba-Nadapal-Eldoret corridor; (ii) construction and rehabilitation, within the Recipient's territory, of bridges between Kapoeta and Nadapal and upgrading of approximately 40 km of the Kapoeta-Narus road section of the Juba-Nadapal-Eldoret corridor and related supervision costs; and (iii) road repairs of approximately 190 km of road sections, within the Recipient's territory, between Torit and Kapoeta, and Narus and Nadapal. The second component, facilitation of regional transport, trade, and development supports promotion of sound transport, trade, and development facilitation measures, increasing the efficiency of the corridors. It comprises of following two sub-components: (i) support to Ministry of Finance, Commerce, and Economic Planning (MOFCEP) and South Sudan Customs Services (SSCS) in the facilitation of regional trade, transport, and development through the establishment of an institutional base and legal framework, and (ii) support to MTRB in the facilitation of regional trade, transport, and development. The third component, institutional development and program management comprises of following three sub-components: (i) strengthening of MTRB's institutional capacity through the provision of advisory services and training, and the preparation of a sectoral governance and anti-corruption strategy; (ii) provision of advisory services to MTRB to strengthen its safeguards management capacity; and (iii) provision of advisory services, training, and logistical support, including office equipment, materials and supplies, and operating costs as required to sustain the management and coordination of project implementation activities, including audits, and the monitoring and evaluation of progress achieved in the execution of the project. The fourth component, connecting Juba with fiber optics will construct a fiber optic cable, alongside the part of the road located in the Recipient's territory, from Juba to Lokichoggio in the Republic of Kenya at the Juba-Nadapal-Eldoret corridor.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0009776"><narrative>Ministry of Finance and Economic Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0009777"><narrative>Ministry of Roads and Bridges</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-05-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-05-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-09-14"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-09-14"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Muhammad Zulfiqar Ahmed</narrative></person-name><telephone>+1-202-473-1000</telephone><email>zulfiqar@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000186298" />
            <name><narrative>Mombasa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.02 39.666672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000189189" />
            <name><narrative>Lokichokio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.2077098 34.353779</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000189280" />
            <name><narrative>Lodwar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.1191101 35.597271</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000198629" />
            <name><narrative>Eldoret</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>0.52035999 35.269932</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000184742" />
            <name><narrative>Nairobi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.28333 36.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000184817" />
            <name><narrative>Nadapal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.4379301 34.262642</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007668902" />
            <name><narrative>Nakuru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.48401999 36.171261</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000187650" />
            <name><narrative>Marich Pass</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1.52869 35.429482</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000365742" />
            <name><narrative>Torit</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.4117699 32.570461</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000372884" />
            <name><narrative>Kapoeta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.7737498 33.591679</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000373303" />
            <name><narrative>Juba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.8516502 31.58247</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000374606" />
            <name><narrative>Gumba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.8141198 31.625111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008521541" />
            <name><narrative>Nesitu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.5606699 32.49715</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="66" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="19" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="15" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="19.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="63" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="12" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="63" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="12" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3065134.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2554278.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2554278.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2554278.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2554278.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2554278.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1915708.81</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">766283.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3065134.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2554278.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2554278.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2554278.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2554278.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2554278.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1915708.81</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">766283.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2018-09-14"/>
<value currency="USD" value-date="2018-09-14">78157375.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2018-09-14"/>
<value currency="USD" value-date="2018-09-14">78157375.14</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-70425356</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-3382</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">602613</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">223733</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">371742</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">28000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">72529</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1166226</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">49342</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">12557</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">10454</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">52186</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">11739</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">20707</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">24107</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">13608</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">9333</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">9547</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-3274</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-72</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-1896</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-8684</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-9572</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-9667</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-5975</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-6656</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-6837</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-205</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-6491</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-6631</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-97</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-6488</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-6647</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-6841</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-7085</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-6840</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-6523</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-6153</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-6716</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-77</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-6281</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-6342</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-6422</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-5766</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-7054</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-17193</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-16781</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-873</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-16785</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-17818</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-9777"><narrative>Ministry of Roads and Bridges</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P131426"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P131426?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P131426"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Road Rehabilitated  non rural (km)
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of fiber link installed (km)
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="340.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transport cost
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Introduction of a CPMS
</narrative></title>
<baseline year="2015" iso-date="2015-05-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-15" />
<period-end iso-date="2019-12-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Road in good and fair condition as a share of the Juba Mombasa Corridor (%)
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="47.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in  custom clearance processing time by South Sudan Customs Services
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="1.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in travel time between Juba and Mombasa
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="7.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in number of road blocks along the Juba-Nadapal-Eldoret road
</narrative></title>
<baseline year="2014" iso-date="2014-05-15" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-05-15" />
<period-end iso-date="2019-12-30" />
<target value="3.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of contracts completed within planned time and budget
</narrative></title>
<baseline year="2015" iso-date="2015-05-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-05-15" />
<period-end iso-date="2019-12-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:43:29" humanitarian="1"  hierarchy="1"><iati-identifier>44000-P152821</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AFR RI-GLR: Displaced Persons &amp; Border Communities</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[to (i) improve access to livelihoods and socio-economic infrastructure for displaced people and host communities in target areas of the territory of the Republic of Zambia, and (ii) support regional learning on development responses to forced displacement.a??]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Displaced Persons and Border Communities Project for Africa is to improve access to livelihoods and socio-economic infrastructure for displaced people and host communities in the targeted areas of the recipient's territory. This project has four components. 1) The first component, Socio-Economic Investments, includes sub-projects for connective infrastructures and socio-economic investments, as well as support to district and provinces to implement and monitor the subgrants. It has two subcomponents as follows: (i) the first subcomponent, Connective infrastructure sub-projects, will focus is on larger infrastructure designed to connect the resettlement areas with the surrounding wards and districts. (ii) the second subcomponent, Socio-Economic Investment Sub-Projects, sub-grants will be provided at three levels, namely, district, sub-grants. 3) The third component, Social Cohesion and Conflict Prevention, will include: (a) Sensitization sessions on coexistence and conflict mitigation, during participatory discussions at community, ward, and district levels; and (b) support to community integration activities, including both Zambians and former refugees. 4) The fourth component, Project Management, will cover the cost for project management, implementation and supervision of project activities, administration of procurement and financial management, monitoring and evaluation, and safeguards compliance monitoring.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0022159"><narrative>Republic of Zambia, Ministry of National Development Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–P0022159"><narrative>Republic of Zambia, Ministry of National Development Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A-COA-0022160"><narrative>Zambia Interim Climate Change Secretariat</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-05-02"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-05-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Joanna Peace De Berry</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jdeberry@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000904409" />
            <name><narrative>Mumena</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.54173 26.15338</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000902149" />
            <name><narrative>Namafula</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.45 23.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000907361" />
            <name><narrative>Matebo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.63333 25.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000909939" />
            <name><narrative> Luambua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.45556 23.87278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000909939" />
            <name><narrative>Luambua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.45556 23.87278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000912547" />
            <name><narrative> Kashamba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.45 24.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000912547" />
            <name><narrative>Kashamba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.45 24.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000905040" />
            <name><narrative>Mukumbi Lubinga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.09056 25.77018</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000906052" />
            <name><narrative>Mongu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.37439 23.5325</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000896140" />
            <name><narrative>Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15 24</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000897041" />
            <name><narrative>Solwezi District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.39277 26.04287</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000898632" />
            <name><narrative>Shilenda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.4054 25.76152</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000900727" />
            <name><narrative>Nkonga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.56667 23.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000909482" />
            <name><narrative> Lukulu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.22997 23.8294</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000909482" />
            <name><narrative>Lukulu District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.22997 23.8294</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000913321" />
            <name><narrative> Kaoma District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.64293 24.407</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000913321" />
            <name><narrative>Kaoma District</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.64293 24.407</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000911209" />
            <name><narrative> Kibinge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.43112 24.99101</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000911209" />
            <name><narrative>Kibinge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.43112 24.99101</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000903922" />
            <name><narrative>Mushawa Liomba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.61667 23.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000900594" />
            <name><narrative>North-Western Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000907858" />
            <name><narrative> Mangango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.66129 24.50718</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000907858" />
            <name><narrative>Mangango</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.66129 24.50718</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="16011" percentage="85" xml:lang="en"/><sector vocabulary="1" code="73010" percentage="8" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="5" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="6" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="8" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="6" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="60" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="3" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="5" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="5" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000532" percentage="8" xml:lang="en"><narrative>Post-conflict reconstruction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="60" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="3" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="15" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="15" xml:lang="en"><narrative>Social Protection</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">19598238.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">19598238.96</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">20000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">3000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-19797356</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-2664623</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-139791</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">300000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">54688</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">119878</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">66970</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-139775</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="3A-COA-22160"><narrative>Zambia Interim Climate Change Secretariat</narrative></receiver-org><receiver-org xml:lang="en" ref="3A-COA-22161"><narrative>International Conference On the Great Lakes</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P152821"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P152821?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P152821"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of livelihood subprojects who report improved food security, income and/or welfare
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of participants who have used their 'take-away' from events
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people particpating in community-based decision-making/participatory planning exercises
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="100,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of livelihood subprojects who report improved food security, income and/or welfare
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who have participated in social cohesion activities under the project
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="10000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects (Number disaggregated by female/vulnerable members)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional learning events held to faciliate knowledge exchange on development responses to forced displacement
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="12.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of former refugees who report having good relations with host communities
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of approved socio-economic infrastructure subprojects that are or will be integrated into government planning and budget exercises
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of research pieces created under the project
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals participating in capacity building trainings
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="200.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of completed infrastructure sub-projects (by sub-project type)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of people who received a research piece that have used it
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to connective and socio-economic infrastructure (by female/former refugees)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people particpating in community-based decision-making/participatory planning exercises
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="100000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional learning events held to faciliate knowledge exchange on development responses to forced displacement
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="12.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of former refugees who report having good relations with host communities
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of participants judging regional learning events as useful
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="250,250.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals participating in regional knowledge and learning exchanges
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="400.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plans in districts or wards mainstreamed with climate resilience
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-08-31" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals participating in regional knowledge and learning exchanges
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="400.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who have participated in social cohesion activities under the project
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="10,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of research pieces created under the project
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals participating in capacity building trainings
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="200.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plans in districts or wards mainstreamed with climate resilience
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-08-31" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of people who received a research piece that have used it
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of people who received a research piece that have used it
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to connective and socio-economic infrastructure (by female/former refugees)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="150000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects (Number disaggregated by female/vulnerable members)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals participating in capacity building trainings
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="200.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of completed infrastructure sub-projects (by sub-project type)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people particpating in community-based decision-making/participatory planning exercises
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="100000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plans in districts or wards mainstreamed with climate resilience
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-08-31" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to connective and socio-economic infrastructure (by female/former refugees)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="150000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional learning events held to faciliate knowledge exchange on development responses to forced displacement
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="12.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of former refugees who report having good relations with host communities
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of participants who have used their 'take-away' from events
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of approved socio-economic infrastructure subprojects that are or will be integrated into government planning and budget exercises
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of completed infrastructure sub-projects (by sub-project type)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="40.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of livelihoods sub-projects (Number disaggregated by female/vulnerable members)
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="3,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of infrastructure built/rehabilitated by the project that is climate resilient
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of participants judging regional learning events as useful
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals participating in regional knowledge and learning exchanges
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="400.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of participants judging regional learning events as useful
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of infrastructure built/rehabilitated by the project that is climate resilient
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of approved socio-economic infrastructure subprojects that are or will be integrated into government planning and budget exercises
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of infrastructure built/rehabilitated by the project that is climate resilient
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of participants who have used their 'take-away' from events
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of livelihood subprojects who report improved food security, income and/or welfare
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who have participated in social cohesion activities under the project
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2021-12-31" />
<target value="10000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of research pieces created under the project
</narrative></title>
<baseline year="2017" iso-date="2017-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-01" />
<period-end iso-date="2021-12-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-29T23:35:57" hierarchy="1"><iati-identifier>44000-P079736</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>CEMAC - Transport-Transit Facilitation</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The objective of the Project is to facilitate regional trade among the Member States and improve the Central African Republic's, the Republic of Cameroon's, and the Republic of Chad's access to world markets.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Transport-Transit Facilitation Project of CEMAC is to facilitate regional trade among the Member States and improve the Central African Republic, the Republic of Cameroon's and the Republic of Chad's access to world markets, through: (i) improving the implementation of the CEMAC Customs Union; and (ii) reducing physical and non physical barriers along the Douala-N'Djamena and Douala-Bangui corridors. The Project is expected to include the following major components to be funded with support from IDA, African Development Fund (ADF), EC, France and Japan through parallel funding arrangements: (I) Roads and Railway Infrastructure Improvement: This will include: (i) periodic maintenance, rehabilitation and upgrading works on selected road sections along the corridors; (ii) paving of existing gravel road sections; (iii) harmonization and enforcement of axle load control policies; (iv) improvement of rest areas; (v) rehabilitation of critical rail infrastructure; and (vi) implementation of HIV-AIDS awareness and mitigation measures. (11) Transit and Transport Facilitation Investments: This will include: (i) Information and Communication Technology (ICT) communication between stakeholders, especially within the port community; (ii) transit regime and border crossing improvements through cargo tracking, border posts); (iii) port safety and security strengthening; and (iv) improvement in inter-modal interfaces. (111) Customs and Transport Sector Institutional Strengthening and Capacity Building: This will include: (i) CEMAC Customs Union and national customs strengthening; (ii) institutional support for transport facilitation institutions; and (iii) management of the project's components. IDA funding primarily covers: In Cameroon, contribution to the paving of the Ngaoundere-Garoua-Boulai section, rehabilitation of rail track between Yaounde and Belabo (component 1 (ii) and (v)), facilitation of the port IT interfaces and Security improvement in Douala, inter-modal interfaces in Douala and Ngaoundere (component 2 (i),(iii) and (iv)), and customs reform and institutional support to the ministries of transport and public works (component 3); In Chad, the co-funding with Republic of Chad of a long-term performance based maintenance contract and critical road rehabilitation works on the N'Djamkna - Moundou - Touboro (Cameroonian border) road section (component 1 (i) and (iii)) and institutional support to customs and the ministry of infrastructure (component 3 (i) (ii) and (iii)); In CAR, a contribution to the paving of the Garoua-Bou1ai-Bouar section and emergency maintenance on the international network (component 1 (i) and (ii)), improvement of inter-modal interfaces (component 2 (iv)) and support to customs reform and to ministries of transport and public works (component 3 (i) (ii) and (iii)).]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–ORP0000375"><narrative>Ministry of Economic, Plan and Cooperation Central African Republic</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–ORP0000379"><narrative>Ministry of Economy and Planning, Republic of Chad</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3T–ORP0000380"><narrative>Ministry of Economy, Planning and Land Planning, Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3T–ORP0000376"><narrative>Ministry of Public Works, Republic of Cameroon</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3T–ORP0000377"><narrative>Ministry of Infrastructure, Republic of Chad</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3T–ORP0000378"><narrative>Ministry of Equipment and Connectivity, Central African Republic</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2004-12-14">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2007-06-26">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2021-02-28"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2021-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Aguiratou Savadogo-Tinto</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>asavadogotinto@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>







<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002220957" />
						<name><narrative>Yaounde</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>3.8666699 11.51667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002221110" />
						<name><narrative>Garou</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>11.3975 14.55528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002224827" />
						<name><narrative>Ngaoundere</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>7.3276501 13.58472</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002227843" />
						<name><narrative>Mbere</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>4.5666699 13.75</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002231319" />
						<name><narrative>Garoua Boulai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>5.8833299 14.55</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002232593" />
						<name><narrative>Douala</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>4.0482702 9.7042799</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002233269" />
						<name><narrative>Dana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.4000001 14.3</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002233376" />
						<name><narrative>Centre Region</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>4.75 11.83333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002236015" />
						<name><narrative>Adamaoua Region</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.8333302 13.25</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002234698" />
						<name><narrative>Batchenga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>4.28333 11.65</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002234536" />
						<name><narrative>Belabo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>4.9333301 13.3</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002231835" />
						<name><narrative>East Region</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>3.8333299 14.16667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002230979" />
						<name><narrative>Goumbela</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.6666698 14.2</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000240604" />
						<name><narrative>Bambari</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>5.7679501 20.67565</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002387946" />
						<name><narrative>Boua</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>7.1500001 17.33333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002389853" />
						<name><narrative>Bangui</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>4.3612199 18.55496</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002427123" />
						<name><narrative>N'Djamena</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>12.10672 15.0444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002427455" />
						<name><narrative>Moundou</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>8.5666704 16.08333</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000244175" />
						<name><narrative>Ere</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>14.31667 21.66667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002227402" />
						<name><narrative>Meiganga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.5166702 14.3</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002227403" />
						<name><narrative>Meidougou</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.4166698 14.21667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002383119" />
						<name><narrative>Sibut</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>5.7180099 19.073891</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002386891" />
						<name><narrative>Fambele</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6.53333 15.2</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002430506" />
						<name><narrative>Kelo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>9.3085899 15.80658</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0002434910" />
						<name><narrative>Bongor</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>10.28056 15.37222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><sector vocabulary="1" code="21012" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="43" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="43" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="10" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="14" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="7" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="14" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="10" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="7" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="7" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="10" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="10" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="14" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="29" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="7" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">665432.1000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">665432.1000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">665432.1000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">861413.0400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">861413.0400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">861413.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1996296.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1996296.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1996296.3000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">3332201.6400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">3332201.6400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">3332201.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">3332201.6400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">3332201.6400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">3332201.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">4330349.7900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">4330349.7900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">4330349.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">4668107.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">4668107.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">4668106.9800</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">4330349.7900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">4330349.7900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">4330349.8000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">5005864.2000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">3992592.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3332201.6400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3332201.6400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3332201.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2671810.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2671810.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2671810.6900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2671810.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2671810.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2671810.6900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">2671810.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">2671810.7000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2671810.6900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">332716.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">332716.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">332716.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">332716.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">332716.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">332716.0500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">147000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">24000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">67000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">112000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1600000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">123400000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-3254865</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-45272538</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-26913318</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-29382060</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2591229</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-5662859</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-719752</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-3009397</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-15326</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-19060868</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-365542</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">1182547</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">2069419</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">980400</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">97006</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">1351780</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">273866</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">125106</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">2144653</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">50121</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">16473466</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">714086</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">1697157</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">1322337</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">9798</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">4013043</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">205688</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">359552</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">54961</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">165625</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">7094382</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">628357</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">103467</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">619880</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">2041064</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">197135</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">4462335</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">4442713</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">8162627</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">167636</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">181564</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">67131</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">2132494</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">180026</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">1080215</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">2439883</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">93332</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">886094</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">3745626</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">6200336</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">144267</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">149993</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">663245</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">12336644</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">4925314</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">2075444</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">5434641</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">355045</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">825800</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">125207</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">5723722</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">10832834</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">2028504</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">2154238</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">58635</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">106499</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">4438821</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">268077</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">418431</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1650682</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">1181135</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">818955</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">1088254</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">1834674</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">2759856</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">2987335</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">446906</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">736032</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">252437</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">1576763</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-828756</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">3521282</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">90974</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">206666</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">2158173</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">968265</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">885426</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">2853412</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">114747</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">1933728</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">102158</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1927578</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1976395</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">282180</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">203203</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">10283877</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">2445574</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">3944947</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">171689</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">529819</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">1650105</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">3265994</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">47337</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">2011083</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2416258</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">120972</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">150862</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">474296</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">116083</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">429352</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">962068</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">44910</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">3988704</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">2736499</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">4054217</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">920156</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">130822</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">974677</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">50164</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">1744711</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">24100</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">373486</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">1132508</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">240913</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1838310</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">250272</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">117789</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">554723</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">27838</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">2097651</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">216218</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">677453</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">1189659</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">6629874</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">2627221</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">551005</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">370863</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">212347</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">1802330</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">706827</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1299228</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">421002</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">9795878</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">756557</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">317221</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">526065</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">700371</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">584487</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">432152</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">25943</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">3117150</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">385220</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">127802</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">23965</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">41585</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">6060086</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">4424411</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">105560</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">320623</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">5149842</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">16302303</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">3163615</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">213052</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">2428077</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">449445</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">57283</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">27833</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1999462</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">20588</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">640739</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">769841</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">10269541</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">290839</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">99038</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">152293</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">123813</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1831445</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">1861922</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">4561879</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">62464</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">865178</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">70144</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2713260</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">48091</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">113117</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2916019</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">237987</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">46109</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">45486</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">217337</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">63372</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">430262</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">539768</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">40097</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">2824977</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">333495</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">79871</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">34660</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">20759</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">92033</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">234068</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">139043</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">134800</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">598450</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1199610</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1783231</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">129873</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">5583315</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">295493</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">944461</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">3653949</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">896940</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">469874</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">454454</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">387814</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">105144</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">356943</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">450034</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">32309</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">164609</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">91431</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">23665</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">369169</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">578233</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">10123</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">261375</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">199748</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">461939</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">990274</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">243332</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">737266</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">125498</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">747438</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">880660</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">178482</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2015755</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">276886</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">333026</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">416529</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">502541</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">33312</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">581411</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">616302</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">544510</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">304459</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1162024</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1433619</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">22507</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">999974</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">56838</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1351365</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">141546</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">52009</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">22891</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">88579</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">323170</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">102874</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">144229</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">134968</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">104667</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">36684</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">108361</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">155830</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">2309253</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">80940</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">550695</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">39014</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">46015</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">569254</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">116849</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1368690</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">586498</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">17642</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">406196</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">215140</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">72999</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">580246</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">140367</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">59376</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">666626</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">3227383</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">196155</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">363524</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">3307999</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">83830</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">569915</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">845455</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">487822</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">3641113</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">736479</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">10557019</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">60354</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">63819</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">181947</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">72747</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">602740</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">193557</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">145723</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">14489930</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">16342</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">12920790</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">164898</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">36730</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">723576</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">339332</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">5462988</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">283919</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">636678</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">184784</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">48552</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">3244073</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">23081</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">830331</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">345636</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">96359</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">462770</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">188924</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1307118</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">516739</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">813193</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">90927</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">194981</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">1680121</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">365851</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">120639</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">34621</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">19923220</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1768167</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">339582</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">614973</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">444959</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">579828</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">612539</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">202956</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">143464</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">60829</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">20616</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">213777</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1608617</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">631696</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">556319</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">184539</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">112472</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">279298</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">563557</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">416745</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">1316277</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">381821</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2432663</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">700971</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">412479</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">151305</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">1340312</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">31661</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">112995</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2942</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">871793</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">58016</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">288450</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1729807</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1597020</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">173942</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">2597734</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">1666653</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">122270</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">370555</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">121742</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">173253</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1985761</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">365373</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">2534182</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1254810</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">11492</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">210236</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">803021</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">112973</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">92113</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">98814</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">683036</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">1364990</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">277695</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">214155</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1976478</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">1833816</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-626242</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-10367319</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-281573</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">651842</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">69694</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1389548</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-214261</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2534619</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1034209</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">2033416</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">59437</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-729174</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-85338</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-8380</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-55280</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1023897</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-15176</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">2151643</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">951179</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">63956</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">564073</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-12625</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-15334</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-7265282</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">-90650</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">-14441</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-73075</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-154213</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-225636</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-304735</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-338675</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-3976</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-367079</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-42874</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-4752</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-45097</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-413227</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-94368</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-419000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-3628</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-146928</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-29260</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-450364</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-65486</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-198343</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-457466</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-3672</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-433537</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-60969</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-214584</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-10461</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-471484</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-65767</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-245835</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-323</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-12565</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-255762</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-63118</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-444161</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-16358</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-452570</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-65233</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-268143</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-18247</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-65322</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-439876</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-271044</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-27791</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-474152</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-70314</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-303759</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1026</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-27399</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-329869</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-478885</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-72423</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-30172</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-125</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-109111</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-343616</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-453211</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-163598</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-343266</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-432739</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-111625</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-175458</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-451825</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-171989</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-351544</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-188024</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-463163</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-188995</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-354601</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-25</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-215920</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-476194</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-194469</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-390479</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-258423</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-352429</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-157504</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-434589</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-3349</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-286151</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-486695</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-397255</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-158830</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-297387</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-412048</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-139826</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-337694</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-284668</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-119012</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-317369</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-387263</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-292121</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-458335</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-373077</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-130560</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-285228</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-111545</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-333042</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-406326</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-280759</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-394089</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-323280</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-108236</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-273958</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-112576</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-336453</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-410612</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-249603</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-393644</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-323057</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-108187</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-298957</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-110181</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-328899</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-400511</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-276132</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-377959</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-104352</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-311103</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-1377684</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-1403179</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-2844</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-1349403</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1352023</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1329526</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1307431</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1326537</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1370598</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1350857</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1084012</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1351116</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1347390</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1080985</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-540558</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1278301</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-990805</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-523884</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-490287</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-927265</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1196323</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-766625</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1248972</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-966061</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-510800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-765770</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-309623</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1232596</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-955380</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-5074</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-758630</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-309572</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-955222</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1232392</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-752348</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1244709</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-964768</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-312666</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-748966</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-310131</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-956949</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1234624</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-780222</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1270453</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-984722</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-319132</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-781827</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-316559</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-976780</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1260206</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-7522</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P079736"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P079736?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P079736"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Customs checkpoints for secured goods
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="6.00"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="4.00">
<comment><narrative>
Douala-Bangui: Target  unachieved. 6 customs checkpoints remain along the Douala-Bangui corridor: three in Cameroon (Douala, Bonis and Garoua-Boulaï) and three in CAR (Beloko, PK26 and BARC/Bangui).
Douala-N’Djamena: Target partially achieved. Four customs checkpoints remain along the corridor in Douala, Bonis, Ngaoundere and Ngueli.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Variance of transit time for imports from the arrival at the port of Doula to N'Djamena &amp; Bangui
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="6.40"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="4.30">
<comment><narrative>
Douala-Bangui: Target underachieved
Douala-N’Djamena: Target overachieved. Nonetheless, on the alternative corridor, the variance of transit time was higher.
</narrative></comment>
</target>
<actual value="5.10">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of key bridges rehabilitated or rebuilt by IDA
</narrative></title>
<baseline year="2011" iso-date="2011-04-30" value="0.00"></baseline>
<period>
<period-start iso-date="2011-04-30" />
<period-end iso-date="2021-02-28" />
<target value="7.00">
<comment><narrative>
Target achieved. There is a total of 5 bridges rehabilitated in Cameroon and 2 in CAR. Indicator added during the Second Additional Financing to monitor progress of bridges work. The target was revised during the Third Additional Financing to reflect the proposed activities (two additional bridges).
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="46.50"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="88.55">
<comment><narrative>
Douala-Bangui: Target overachieved. Indicator modified during the Second Additional Financing to reflect the recently launched Core Sector Indicators. The previous name was: “Percentage of road in good condition on the corridor Douala-Bangui”. The target was revied during the Third Additional Financing to reflect the proposed activities in CAR. Both maintenance and rehabilitation works have led to a 90.0% of roads in good to fair condition in CAR while the section in Cameroon is 100% in good to fair condition.
Douala-Ndjamena: Target underachieved. Indicator modified during the Second Additional Financing to reflect the recently launched Core Sector Indicators. The previous name was: “Percentage of road in good condition on the corridor Douala-N’DjamEna”. The target was revised during April 2018 Restructuring following the cancellation of Guelengdeng-Bongor road rehabilitation contract. In Cameroon, 81.2% of the section is in good to fair condition while 7 kilometers out of 7 in Chad are in good to fair condition.
</narrative></comment>
</target>
<actual value="90.50">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average turnarounds
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="20.00"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2020-06-30" />
<target value="20.40">
<comment><narrative>
Douala-Bangui: Target unachieved
Douala-N’Djamena: Target achieved
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulated length of railway slow down in effect for mor than 90 days
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="2.40"></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2020-06-30" />
<target value="7.30">
<comment><narrative>
Target underachieved. The large number of works on the railway network led to an increased cumulated length of railway slowdown.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time from ship readiness to unload to final destination for an imported container, on the corridor targeted by the project
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="32.50"></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2021-02-28" />
<target value="18.00">
<comment><narrative>
Douala-Ndjamena: Target overachieved. Indicator added during the Second Additional Financing to reflect the recently launched Core Sector Indicators. The insecure situation in Northern Cameroon has led to the progressive change to an alternative corridor passing by Chad at Touboro. The value of this indicator for the alternative corridor is 18.3 days at project closing.
Douala-Bangui: Target overachieved. Indicator added during the Second Additional Financing to reflect the recently launched Core Sector Indicators. Target revised during the Third Additional Financing to reflect additional road works improvements and all-season road condition.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Availability of CAMRAIL's CC locomotives
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="76.90"></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2020-06-30" />
<target value="82.50">
<comment><narrative>
Target overachieved. Camrail has maintained a 80% availability of CC locomotives since 2015.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of key customs statistics in a media acceptable to the Bank (newspaper or most likely Internet).
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="N"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="Y">
<comment><narrative>
CAR: Target achieved. Finally, the publication was made through MINFI website rather than traditional media. The problem was that the website was not always operational due to different factors including internet connection. The publication is effective but not always reliable due to unstable internet connection. Indicator modified during the Second Additional Financing to reflect the publishing policy of CAR Customs, in line with the legal covenant. The previous name was: “Customs indicators are disclosed monthly in CAR”. The target sets a publication done or updated on yearly basis. The frequency of reporting was increased to a twice a year frequency during the Third Additional Financing as a result of institutional strengthening activities to CAR customs.
Chad: Target achieved. Finally, the publication was made through INSEED website rather than traditional media. Indicator modified during the Second Additinal Financing to reflect the publishing policy of Chad Customs, in line with the legal covenant. The previous name was: “Customs indicators are disclosed monthly in Chad”. The target sets a publication done or updated on yearly basis.
Cameroon: Target achieved. Finally, the publication was made through the Customs website rather than traditional media.  Indicator modified during the Second Additional Financing to reflect the publishing policy of Cameroon Customs, in line with the legal covenant. The previous name was: “Number of publication of “Cameroon Customs Flash” including a list of customs indicators”. The target sets a publication done or updated on quarterly basis.
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Debt service coverage ratio of CAMRAIL
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="1.40"></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2020-06-30" />
<target value="1.60">
<comment><narrative>
Target overachieved. The objective was to stabilize the debt service coverage ratio but it increased during implementation.
</narrative></comment>
</target>
<actual value="1.40">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ratio of staff costs to traffic revenue
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="27.60"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="24.40">
<comment><narrative>
Target achieved at 88%.
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Douala port operational and transactional dwell times
</narrative></title>
<baseline year="2011" iso-date="2011-04-30" value="7.00"></baseline>
<period>
<period-start iso-date="2011-04-30" />
<period-end iso-date="2020-06-30" />
<target value="7.50">
<comment><narrative>
Target underachieved. The definition of the indicator was modified during the Second Additional Financing to clearly distinguish between operational, transactional (due to administration) and discretionary dwell times (due to transporters behaviour). The previous indicator was: “Douala port dwell time for main importers (decreases by 20%)” with a baseline target of 11 days in 2007.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2021-02-28" />
<target value="322.20">
<comment><narrative>
Target underachieved. Indicator added during the Second Additional Financing to reflect the recently launched Core Sector Indicators and new activities. The target was revised to 450 km during the Restructuring of the Second Additional Financing to reflect the additional road works. The target was revised once again during the Third Additional Financing to reflect the proposed activities (+61km of road works). The indicator was once again revised during April 2018 Restructuring following the cancellation of Guelengdeng-Bongor road rehabilitation contract (from 496.0 km to 446.0 km). Finally, a total of 605 km rehabilitated were expected. In particular, 109.2/320.2 km have been rehabilitated in Cameroon, 153/153 km in CAR and  60/135 km in Chad. Works in Chad were funded for a great part using counterpart funds thus difficultly reached a convenient level.
</narrative></comment>
</target>
<actual value="608.20">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to release customs bond
</narrative></title>
<baseline year="2007" iso-date="2007-02-01" value="63.00"></baseline>
<period>
<period-start iso-date="2007-02-01" />
<period-end iso-date="2020-06-30" />
<target value="11.00">
<comment><narrative>
Target overachieved due to changes in customs policies/procedures.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Electronic transmission of the transit documents collected by the Cameroon customs to CAR and Chad customs
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="0.00"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="50.00">
<comment><narrative>
Target achieved. Even though the indicator is achieved, no customs declaration is electronically shared between national customs. Chad and CAR customs can only read and not process documents and data transmitted through Nexus by Cameroon customs.
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Customs operations carried out electronically for goods in transit
</narrative></title>
<baseline year="2007" iso-date="2007-06-01" value="0.00"></baseline>
<period>
<period-start iso-date="2007-06-01" />
<period-end iso-date="2021-02-28" />
<target value="100.00">
<comment><narrative>
Target achieved
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:13:16" hierarchy="1"><iati-identifier>44000-P129282</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Regional Trade Facilitation and Competitiveness DPO</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[ The PDO is to reduce trade transaction costs along the Abidjan-Ouagadougou corridor.<br />Pillar A: Professionalizing and formalizing the trucking industry: (A1) Business-enabling environment promoting professionalization and formalization of the trucking industry; (A2) Professional organization representing the trucking industry; (A3) Implementation of axle load regulations.<br />PillarB: Modernizing the organization of the trucking market: (B1) Efficiency of road transport operations through better contractual relations between trucking companies and shippers; (B2) Efficiency of road transport operations through a more efficient truck fleet.<br />Pillar C: Enhancing the competitiveness of maritime and inland gateways: (C1) Port and terminals operational efficiency and prices.<br />Pillar D: Improving customs clearance: (D1) Availability of information on trade procedures and regulations; (D2) Customsclearance procedures and reward of compliance; (D3) Professional standards for customs and logistics service providers.<br />Pillar E: Facilitating transit: (E1) Border crossing procedures; (E2) Transit regime. ]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objective of the First Regional Trade Facilitation and Competitiveness Development Policy Operation Project for Africa is to reduce trade transaction costs along the Abidjan-Ouagadougou corridor. This innovative development policy operation (DPO) addresses previously unsolved issues affecting trade and transport by offering a common framework for coordinating reforms in the two countries. The program is structured around five pillars: pillar A, professionalizing and formalizing the trucking industry: (A1) business enabling environment promoting professionalization and formalization of the trucking industry; (A2) professional organization representing the trucking industry; and (A3) implementation of axle load regulations. Pillar B, modernizing the organization of the trucking market: (B1) efficiency of road transport operations through better contractual relations between trucking companies and shippers; and (B2) efficiency of road transport operations through a more efficient truck fleet. Pillar C, enhancing the competitiveness of maritime and inland gateways: (C1) port and terminals operational efficiency and prices. Pillar D: improving customs clearance: (D1) availability of information on trade procedures and regulations; (D2) customs clearance procedures and reward of compliance; and (D3) professional standards for customs and logistics service providers. Pillar E: facilitating transit: (E1) border crossing procedures; and (E2) transit regime. By lowering the currently high transport costs, facilitating trade, and promoting regional integration, the reforms supported by this program are expected to have broad-based welfare gains in countries, benefiting among others producers of exported products (including farmers), consumers of imported goods and firms using imported inputs.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–ORP0008286"><narrative>Ministere de l'Economie et des Finances</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–ORP0008287"><narrative>Ministere des Finances et du Budget</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A–ORP0008288"><narrative>Ministere de l'Economie et des Finances</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0008289"><narrative>Ministere des Finances et du Budget</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-06-20">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2015-06-16">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Jacques Morisset</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>jmorisset@worldbankgroup.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>





<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="0000000" />
								<name>
									<narrative>No Data Available</narrative>
								</name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
								<pos>0.00 0.00</pos>
							</point>
							<exactness code="2"/>
							<location-class code="4" />
						</location><sector vocabulary="1" code="21023" percentage="33" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="33" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="10" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="5" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="10" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="25" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="50" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-31 00:00:00.0000000-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">100000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-31 00:00:00.0000000-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">100000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">48229065</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">47368590</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-125774</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-205740</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-182560</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-178051</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-179011</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-188201</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-198007</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-199482</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-206623</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-196297</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-194596</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-190615</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-187628</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-186835</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-182720</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-185762</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-183541</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-190640</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-197437</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-203966</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-196741</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-204888</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-194160</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-189291</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-182612</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-176923</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-159253</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-169491</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-174746</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-171431</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-165069</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-172488</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-168005</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-167885</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-167633</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-160470</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-161207</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-169109</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-169746</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-170557</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-166597</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-167785</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-809000</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-788711</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-772961</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-748550</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-684219</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-728994</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-759167</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-749423</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-733639</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-766116</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-758606</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-757805</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-770202</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-737794</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-753963</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-791155</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-808232</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-812178</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-807010</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-813505</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129282"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P129282?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129282"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of transport operators authorized to deliver containers in Adidjan
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="30.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formally registered transport operators under new criteria for access to profession (Burkina Faso)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="300.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of non-compliant trucks controlled at weighing stations (Burkina Faso)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="80.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="35.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Internal controls planned by the customs administration (Bukina Faso)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="2.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of container delivery prices in Abidjan compared to initial FEDERMAR tariff
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="25.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of non-compliant trucks controlled at weighing stations (Cote d'Ivoire)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="85.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="35.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formally registered transport operators under new criteria for access to the profession (Cote d'Ivoire)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of the inventory of trade procedures and regulations published on the trade information web portal (Cote d'Ivoire)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="20.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of new vehicle prices under fleet renewal mechanism (Cote d'Ivoire)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of transactions routed in customs' red channel (Cote d'Ivoire)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="70.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average transit time between Abidjan and Ouagadougou
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="140.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of the inventory of trade procedures and regulations published on the trade information web portal (Burkina Faso)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of trade in Cote d'Ivoire carried under a consignment note
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="3900000.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="5000000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of new vehicle prices under fleet renewal mechanism
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="35.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Internal controls planned by the customs administration (Cote d'Ivoire)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="5.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="7.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of declarations at the border submitted prior to the arrival of the truck (both countries)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="0.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of transactions routed in customs' red channel (Burkina Faso)
</narrative></title>
<baseline year="2015" iso-date="2015-10-01" value="25.00"></baseline>
<period>
<period-start iso-date="2015-10-01" />
<period-end iso-date="2017-10-01" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:13:21" hierarchy="1"><iati-identifier>44000-P079734</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>AFCC2/RI-East Africa Trade and Transport Facilitation Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[Project Development Objective (PDO): is to (i) enhance efficiency of customs agencies' clearance processes, for the EAC Partner States participating in the East Africa Customs Union, to facilitate trade; (ii) improve efficiency and reliability of transport and logistics services along the key corridors; and (iii) enhance safety in identified areas and reduce the Recipient#s fiscal transfers to railway institutions by rationalizing the work force on the Kenya-Uganda railway.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The East Africa Trade and Transport Facilitation Project will improve railway services in Kenya and Uganda. The project consists of the following components: (1) Support to East African Community (EAC) Customs Union Implementation: This will include: (a) long term support to the EAC Secretariat for the implementation of the Customs Union; (b) equipment to implement a modem customs integrated system and common database; and (c) support the strengthening and modernization of national customs departments. (2) Institutional support for Transport Facilitation: This will involve: (a) strengthening of the Northern Corridor Transit Transport Coordination Authority; (b) supporting Governments to establish an appropriate management mechanism for the Central Transport Corridor; and (c) helping improve the regional transport policy and harmonize transport regulations. (3) Investment Support for Trade and Transport Facilitation: The proposed support includes: (a) enhancing security and facilitation in the ports of Mombasa and Dar-es-Salaam; (b) improving goods security by financing a regional/national electronic cargo tracking system from the ports of Mombasa and Dar es Salaam throughout the EAC and Rwanda; (c) financing the establishment of key joint border posts at main cross-border posts within the region; (d) investing in Inland Container Depots, intermodal infrastructure; and (e) supporting the implementation of a common weigh bridges policy. (4) Support to Kenya and Uganda Railways Concessions: This will include: (a) technical support to the Kenya Railways Corporation (KRC) and the Uganda asset holding company; (b) support for the retrenchment and social mitigation of KRC staff; (c) support for establishment of a Pension Fund for the staff of KRC; (d) support for the Kenya Relocation Action Plan implementation; (e) investment support for Uganda Railways Corporation; and (f) support to the Joint Railways Concession through the provision of Partial Risk Guarantees to Rift Valley Railway Consortium subsidiaries.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A–ORP0000360"><narrative>Ministry of Infrastructure (MININFRA), Rwanda</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000361"><narrative>Tanzania Ports Authority (TPA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000362"><narrative>Ministry of Works and Transport (MOWT), Uganda</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000363"><narrative>Kenya National Highways Authority (KeNHA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000364"><narrative>Rwanda Transport Development Authority (RTDA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000365"><narrative>Ministry of Transport and Infrastructure (MOTI), Kenya</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000366"><narrative>Kenya Revenue Authority (KRA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000367"><narrative>Kenya Ports Authority (KPA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000368"><narrative>Kenya Trade Network Agency (KenTrade)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000369"><narrative>Rift Valley Railways (RVR)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000370"><narrative>Rwanda Revenue Authority (RRA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000371"><narrative>Surface and Marine Transport Regulatory Authority (SUMATRA), Tanzania</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000372"><narrative>Tanzania Revenue Authority (TRA)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000373"><narrative>Tanzania National Roads Agency (TANROADS)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0000374"><narrative>Uganda Revenue Authority (URA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2004-12-14">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2006-01-24">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-09-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Solomon Muhuthu Waithaka</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>swaithaka@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>
















<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000049518" />
						<name><narrative>Republic of Rwanda</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-2 30</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000149590" />
						<name><narrative>United Republic of Tanzania</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-6 35</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000160263" />
						<name><narrative>Dar es Salaam</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-6.8234901 39.269508</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000186301" />
						<name><narrative>Mombasa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-4.0546598 39.663589</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000187661" />
						<name><narrative>Mariakani</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-3.8633201 39.473621</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000192950" />
						<name><narrative>Republic of Kenya</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>1 38</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000199989" />
						<name><narrative>Busia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>0.46004999 34.111691</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000226074" />
						<name><narrative>Republic of Uganda</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>1.25 32.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000228700" />
						<name><narrative>Mutukula</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-0.95806003 31.39389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000234077" />
						<name><narrative>Busia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>0.46588001 34.092209</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000201484" />
						<name><narrative>Rusumo Falls</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-2.3807001 30.782101</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0007701602" />
						<name><narrative>Mukuru</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-1.3047 36.884998</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000443336" />
						<name><narrative>Kabale District</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-1.2077399 29.98588</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000196250" />
						<name><narrative>Isebania Sub-Location</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-1.2 34.433331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000192494" />
						<name><narrative>Kibera</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-1.3 36.76667</pos>
						</point>
						<exactness code="2"/>
						<location-class code="4" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000188610" />
						<name><narrative>Lunga-Lunga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-4.5527601 39.123631</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000188025" />
						<name><narrative>Malaba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>0.63457 34.2756</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000179525" />
						<name><narrative>Taveta</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-3.3987899 37.683361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000159045" />
						<name><narrative>Isaka</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-3.9000001 32.933331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000202061" />
						<name><narrative>Kigali</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-1.94995 30.058849</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000200787" />
						<name><narrative>Athi River</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-1.4563 36.97826</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000232422" />
						<name><narrative>Kampala</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>0.31628001 32.582191</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000158027" />
						<name><narrative>Kibaha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-6.7666702 38.916672</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><sector vocabulary="1" code="21012" percentage="43" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="42" xml:lang="en"/><sector vocabulary="1" code="21040" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TP" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="37.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="29" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="29" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="7" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="7" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="14" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="14" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="7" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="7" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">907080.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">907080.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">907080.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">7333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">7333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">7333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">8000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">8000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">8000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">4000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">680310.2500</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">673333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">673333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">673333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">907080.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">907080.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">907080.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2006-01-31"/><value value-date="2006-01-31">26400000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2006-01-31"/><value value-date="2006-01-31">37000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2006-01-31"/><value value-date="2006-01-31">120620000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2006-01-31"/><value value-date="2006-01-31">15000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-3773412</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-3797</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-71619</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-757297</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-3548061</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-07-31"/><value value-date="2006-07-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-07-31"/><value value-date="2006-07-31">700000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-09-30"/><value value-date="2006-09-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-09-30"/><value value-date="2006-09-30">5500000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-03-31"/><value value-date="2007-03-31">25247588</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-04-30"/><value value-date="2007-04-30">4835465</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-05-31"/><value value-date="2007-05-31">491442</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-05-31"/><value value-date="2007-05-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">767092</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">296074</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-07-31"/><value value-date="2007-07-31">2586087</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-08-31"/><value value-date="2007-08-31">575711</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-09-30"/><value value-date="2007-09-30">1039611</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-11-30"/><value value-date="2007-11-30">7170134</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-12-31"/><value value-date="2007-12-31">301603</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-01-31"/><value value-date="2008-01-31">128410</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">354907</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">3331647</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">944524</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">238003</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">234142</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">425636</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">961724</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">722041</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">3887328</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">47013</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">950346</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">347158</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">1050021</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">640987</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">1326626</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">4130700</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">116028</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">364105</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">731888</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">309387</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">72462</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">1180200</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">328186</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">119824</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">272242</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">391575</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">1687080</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">582893</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">317055</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">680569</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">703501</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">166381</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">821926</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">76164</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">47088</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">789078</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">379586</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">2674778</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">37870</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">229874</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">176765</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">1287458</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">173543</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1215609</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">1795522</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">510639</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">1538159</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">167883</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">164129</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-40595</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">559076</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">212333</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">677170</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">23719</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">2515174</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">109286</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1192937</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">420933</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">661009</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">12500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">1054553</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-21897</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">1103610</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1215599</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">437920</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1730402</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">2647536</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">1949192</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">507299</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">399096</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">552508</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">1030885</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">559130</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">1014090</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">152029</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">286333</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">223381</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">531581</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">1858610</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">1108352</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">477737</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">158836</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">709673</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">1005139</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">219286</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">718190</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">441941</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">155944</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">964046</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">590386</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">894220</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">314337</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">932127</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">8579522</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1079928</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">936160</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">215463</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1353755</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">150854</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">1908048</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">222176</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">218909</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">333303</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">4996111</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1601120</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1170268</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1145304</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">456233</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">274136</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1957163</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">314389</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">698883</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">5901797</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">531020</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">172661</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">228741</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">2493103</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-1305217</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">6980059</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">225119</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">527000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">142582</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">3238105</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">6147578</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">966148</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">452496</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">3453953</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1869431</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">90</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">753446</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">135822</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1233582</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">107159</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">578428</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">403486</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">580379</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-31053</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1377374</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">208850</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">22438</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1475761</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-77018</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">922669</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">856562</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">86</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">969773</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">650387</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">4183937</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1259656</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">7539116</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">441285</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">1072758</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">349985</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">395706</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">713609</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">2250396</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1254250</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">5063494</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-429332</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">315540</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">74455</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1309192</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">625293</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">1238830</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">1023291</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">159426</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">279802</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">262386</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-70978</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">86948</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-11-30"/><value value-date="2006-11-30">-169740</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2006</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-02-28"/><value value-date="2007-02-28">-67613</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-05-31"/><value value-date="2007-05-31">-165470</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-08-31"/><value value-date="2007-08-31">-41937</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-08-31"/><value value-date="2007-08-31">-73320</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-11-30"/><value value-date="2007-11-30">-247070</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">-24970</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">-23870</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">-244300</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">-22756</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">-25430</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-235654</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">-6747</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">-9268</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-213710</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">-9364</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">-9508</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-248212</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-9768</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-13610</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-224885</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-10254</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-14364</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-241358</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-14272</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-19734</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-260308</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-18571</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-21461</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-267813</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-27094</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-23636</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-272748</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-28929</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-28070</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-299043</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-29894</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-33316</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-311868</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-43294</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-36836</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-323432</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-59023</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-49990</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-375440</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-79994</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-60112</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-372727</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-23838</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-72747</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-92480</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-72241</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-354856</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-104944</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-81829</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-393971</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-88031</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-106149</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-89450</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-421264</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-98219</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-92512</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-126759</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-439406</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-96204</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-111937</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-84456</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-395609</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-94121</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-87875</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-113191</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-100433</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-454044</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-88176</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-116259</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-426596</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-99181</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-125504</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-97346</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-410003</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-96402</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-84493</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-108917</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-404930</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-96231</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-113514</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-86429</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-397763</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-95765</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-83306</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-107853</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-391912</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-94896</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-99071</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-77758</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-399797</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-98796</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-92532</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-121238</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-396412</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-99845</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-112296</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-84362</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-98677</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-401483</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-104782</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-80616</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-91880</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-365587</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-100628</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-77016</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-84584</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-334161</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-90673</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-74623</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-93349</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-371419</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-104167</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-76517</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-89760</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-356121</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-99005</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-73576</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-89616</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-355445</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-93309</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-68715</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-86179</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-340622</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-93494</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-75614</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-83367</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-327423</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-94258</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-72664</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-91450</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-362074</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-84661</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-70306</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-84255</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-321907</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-356334</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-254136</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1174555</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-319806</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-247575</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1135127</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-239058</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-312641</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1140796</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-323068</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-248502</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1180971</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-333858</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-257548</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1183919</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-244268</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-320745</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1150736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-320248</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-244831</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1148713</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-242681</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-314164</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1144251</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-315706</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-241466</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1131664</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-248912</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-323880</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1181970</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-329915</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-254398</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1197687</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-250796</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-327729</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1169575</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-261279</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-247351</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-322168</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-247487</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1107838</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-233146</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-303869</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1095517</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-244735</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-236146</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-310014</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1117736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-249698</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-235257</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-307301</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1104158</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-246665</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-233575</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-304821</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1101636</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-246102</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-236356</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-304775</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1094369</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-244478</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-231807</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-299071</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1122948</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-250863</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-241777</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-310315</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1132629</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-253025</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-486738</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-633943</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-254467</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2278162</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P079734"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P079734?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P079734"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease in border crossing time (in hours)
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Malaba - KE 15; UG 30 hrs
Serare/Isebania - No data
Gatuna/Katuna - RW13 hrs UG no data"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Serare - 5 hours 
Gatuna - 2 hours">

</target>
<actual value="Malaba, Average Kenya 5hours; Uganda, 6hours - inconsistency noted">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease in border crossing time (in hours)
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Malaba - KE 15; UG 30 hrs
Serare/Isebania - No data
Gatuna/Katuna - RW13 hrs  UG no data"><comment><narrative>Challenge has been sustainability which should be possible once the concept of OSBP is fully operational.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Serare - 5 hours
Gatuna - 2 hours">
<comment><narrative>
Achievable once infrastructure is completed in November 2014
</narrative></comment>
</target>
<actual value="Malaba, Kenya 5hours; Uganda, 6hours">
<comment><narrative>
Data to be updated after time release study under TMEA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rwanda meets the technical requirements to become a member of the EAC CU by end of project
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Application made"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Full member">

</target>
<actual value="Full member">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dwell time for standard 2 TEU container domestic cargo reduced
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Mombasa 13 days; Dar 18 days"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Mombasa 4days; Dar 8 days">

</target>
<actual value="Mombasa 4 days. Dar 9 days">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rwanda meets the technical requirements to become a member of the EAC CU by end of project
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Application made"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Full member">

</target>
<actual value="Full member">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Variance of transit time through the Northern and Central Corridor is significantly reduced.
</narrative></title>
<baseline year="2005" iso-date="2005-12-27" value="14 days (NC)."></baseline>
<period>
<period-start iso-date="2005-12-27" />
<period-end iso-date="2014-09-30" />
<target value="2 days (NC).">
<comment><narrative>
Retained from original project.
</narrative></comment>
</target>
<actual value="3 days">
<comment><narrative>
Data to be reconfirmed through the proposed time release study.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Railway ICD in Uganda built and functional
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existant"><comment><narrative>originally planned to be located in Kamplala station an area later found unsuitable</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Operational ICD">
<comment><narrative>
Important facility for the restructured K-U railway.
</narrative></comment>
</target>
<actual value="Due to be completed in Sep/October 2014">
<comment><narrative>
Completion and handover of ICD planned around September 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NSW establised in Kenya and CBS ESW at the Dar port
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="None existant"><comment><narrative>Rwanda has implemented the ESW</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Established systems">
<comment><narrative>
Likely to be met but for KE and RW.
</narrative></comment>
</target>
<actual value="Kenya's eSW was commissioned in Nov 2013.  Tanzania's will be implemented through another DP support. Indicator dropeed in projrestructuring.">
<comment><narrative>
Kenya'S ESW was commissioned in Nov 2013 while Tanzania's is at procurement stage.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Kenya Railways Pension Scheme (KRPS) set up and is financially sustainable
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existent"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Fully operatinal and Sustainable with known sources of revenue.">

</target>
<actual value="KRPS already set up and operational with challenges in respect of the management of assets.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transit time along the NC (Mombas to Kigali) is reduced.
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="19.00"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="5.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safety railway operation zones established in Kibera and Mukuru areas, Wagon Ferry services resume in Uganda
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existant"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Safety zone established. Mv Kaawa operational">

</target>
<actual value="Progress made in establishing safety railway operation zones in Kibera and Mukuru areas. MV Kaawa operational">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safety railway operation zones established in Kibera and Mukuru areas, Wagon Ferry services resume in Uganda
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existant"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Safety zone established. Mv Kaawa operational">

</target>
<actual value="Progress made in establishing safety railway operation zones in Kibera and Mukuru areas. MV Kaawaoperational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customs procedures and documents are simplified in accordance with WCO standards.
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="Complex documentation"></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2015-09-30" />
<target value="Simplified documents as adjudged by WCO consultant">

</target>
<actual value="Ongoing simplification to be assessed as part of the time release study">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated RAP is implemented in Kibera and Mukuru areas and safety zone created
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Chaotic"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="3km safety zone established in both Kibera and Mukuru">

</target>
<actual value="Ongoing with challenges.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dwell time for standard 2 TEU container domestic cargo reduced
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Mombasa 13 days; Dar 18 days"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Mombasa 4days; Dar 8 days">

</target>
<actual value="Mombasa 4 days. Dar 9 days">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transit time along the NC (Mombas to Kigali) is reduced.
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="19.00"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="5.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safety railway operation zones established in Kibera and Mukuru areas, Wagon Ferry services resume in Uganda
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existant"><comment><narrative>RAP works contracts that will help establish the safety zone likely to commence by Jan 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Safety zone established. Mv Kaawa operational">
<comment><narrative>
MV Kaawa operational
</narrative></comment>
</target>
<actual value="Good progress made in establishing safety railway operation zones in Kibera and Mukuru areas. MV Kaawa operational">
<comment><narrative>
MV Kaawa operational
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Seamless Cargo tracking is operatinal on the Northern Corridor
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="No Cargo tracking"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Cargo tracking operational in at least 2 countries on the NC.">

</target>
<actual value="Achieved. Operational in KE and UG">
<comment><narrative>
Uganda has installed the ECT and Rwanda has awarded the installation contract. KE's has resumed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Railway ICD in Uganda built and functional
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existant"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Operational ICD">

</target>
<actual value="substantially completed">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NSW establised in Kenya and CBS ESW at the Dar port
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="None existant"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Established systems">

</target>
<actual value="Kenya's eSW was commissioned in Nov 2013. Tanzania's will be implemented through another DP support. Indicator dropeed in projrestructuring.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease in border crossing time (in hours)
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Malaba - KE 15; UG 30 hrsSerare/Isebania - No dataGatuna/Katuna - RW13 hrs UG no data"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Serare - 5 hours Gatuna - 2 hours">

</target>
<actual value="Malaba, Average Kenya 5hours; Uganda, 6hours - inconsistency noted">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Seamless Cargo tracking is operatinal on the Northern Corridor
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="No Cargo tracking"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Cargo tracking operational in at least 2 countries on the NC.">

</target>
<actual value="Achieved. Operational in KE and UG">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customs procedures and documents are simplified in accordance with WCO standards.
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="Complex documentation"></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2015-09-30" />
<target value="Simplified documents as adjudged by WCO consultant">

</target>
<actual value="Ongoing simplification to be assessed as part of the time release study">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
NSW establised in Kenya and CBS ESW at the Dar port
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="None existant"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Established systems">

</target>
<actual value="Kenya's eSW was commissioned in Nov 2013. Tanzania's will be implemented through another DP support. Indicator dropeed in proj restructuring.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Seamless Cargo tracking is operatinal on the Northern Corridor
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="No Cargo tracking"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Cargo tracking operational in at least 2 countries on the NC.">

</target>
<actual value="Achieved. Operational in KE and UG">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dwell time for standard 2 TEU container domestic cargo reduced
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Mombasa 13 days; Dar 18 days"><comment><narrative>Original 2005 data</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Mombasa 4days; Dar 8 days">

</target>
<actual value="Mombasa 5 days. Dar 9 days">
<comment><narrative>
Currently-- Mombasa 5 days. Dar 9 days
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Railway ICD in Uganda built and functional
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existant"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Operational ICD">

</target>
<actual value="substantially completed">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Customs procedures and documents are simplified in accordance with WCO standards.
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="Complex documentation"></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2014-09-30" />
<target value="Simplified documents as adjudged by WCO consultant">

</target>
<actual value="Ongoing simplification to be assessed as part of the time release study">
<comment><narrative>
HOS Initiative has helped the simplification process.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Customs Systems Interconnection functions in all 4 participating countries
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Interconnection not operational"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Substantial regional interconnection amongst participating EAC countries">

</target>
<actual value="The IBM is being rolled out.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Kenya Railways Pension Scheme (KRPS) set up and is financially sustainable
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existent"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Fully operatinal and Sustainable with known sources of revenue.">

</target>
<actual value="KRPS already set up and operational with challenges in respect of the management of assets.">
<comment><narrative>
Some members have challenged the rationale of sale of prime assets.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated RAP is implemented in Kibera and Mukuru areas and safety zone created
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Chaotic"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="3km safety zone established in both Kibera and Mukuru">

</target>
<actual value="Ongoing with challenges.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Kenya Railways Pension Scheme (KRPS) set up and is financially sustainable
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Non existent"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Fully operatinal and Sustainable with known sources of revenue.">

</target>
<actual value="KRPS already set up and operational with challenges in respect of the management of assets.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Customs Systems Interconnection functions in all 4 participating countries
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Interconnection not operational"><comment><narrative>Rudimentary connections</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Substantial regional interconnection amongst participating EAC countries">

</target>
<actual value="The IBM is being tested waiting progressive rolling out.">
<comment><narrative>
The EATTF project provides equipment to facilitate interconnection however with KE and TZ installing new Customs systems progressmay be interrupted.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional Customs Systems Interconnection functions in all 4 participating countries
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Interconnection not operational"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2015-09-30" />
<target value="Substantial regional interconnection amongst participating EAC countries">

</target>
<actual value="The IBM is being rolled out.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated RAP is implemented in Kibera and Mukuru areas and safety zone created
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Chaotic"><comment><narrative>Original RAP prepared.</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="3km safety zone established in both  Kibera and Mukuru">
<comment><narrative>
Objective to resettle 9,005 households and provide a safety operating zone for railway.
</narrative></comment>
</target>
<actual value="Ongoing with construction of safety and resettlement at halfway complete.">
<comment><narrative>
The RAP civil works are 41% complete and 1st batch of PAPS relocation planned for September2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Variance of transit time through the Northern and Central Corridor is significantly reduced.
</narrative></title>
<baseline year="2005" iso-date="2005-12-27" value="14 days (NC)."></baseline>
<period>
<period-start iso-date="2005-12-27" />
<period-end iso-date="2015-09-30" />
<target value="2 days (NC).">

</target>
<actual value="3 days">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transit time along the NC (Mombas to Kigali) is reduced.
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="19.00"><comment><narrative>Core indicator of transit facilitation</narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="5.00">

</target>
<actual value="6.00">
<comment><narrative>
There is good progress on this target.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rwanda meets the technical requirements to become a member of the EAC CU by end of project
</narrative></title>
<baseline year="2005" iso-date="2005-12-01" value="Application made"></baseline>
<period>
<period-start iso-date="2005-12-01" />
<period-end iso-date="2014-09-30" />
<target value="Full member">
<comment><narrative>
Project supports the RRA
</narrative></comment>
</target>
<actual value="Full member">
<comment><narrative>
Project supports the RRA
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Variance of transit time through the Northern and Central Corridor is significantly reduced.
</narrative></title>
<baseline year="2005" iso-date="2005-12-27" value="14 days (NC)."></baseline>
<period>
<period-start iso-date="2005-12-27" />
<period-end iso-date="2015-09-30" />
<target value="2 days (NC).">

</target>
<actual value="3 days">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:13:27" hierarchy="1"><iati-identifier>44000-P104523</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>AFCC2/RI-IGAD Regional HIV/AIDS Partnership Program (IRAPP) Support Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[A. Increase preventative action, and reduce misconception of cross border and mobile populations, refugees, IDPs, returnees and surrounding host communities concerning HIV/AIDS prevention, treatment and mitigation in selected sites in the IGAD member states; and B. Establish a common and sustainable regional approach to supporting these populations in the IGAD member states.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[There are two interrelated project development objectives for the IGAD Regional HIV/AIDS Partnership Program (IRAPP) Support Project. They are to: A) Increase preventative action, and reduce misconception of cross border and mobile populations, refugees, internally displaced people (IDPs), returnees and surrounding host communities concerning HIV/AIDS prevention, treatment and mitigation in selected sites in the IGAD member states; and B) Establish a common and sustainable regional approach to supporting these populations in the IGAD member states. The Project has 3 components: 1) Support to refugees, IDPs, returnees, surrounding host communities and cross-border and mobile populations The objective of this component is to scale up HIV interventions in size and geographical areas for refugees, IDPs, returnees and surrounding host communities, as well as for vulnerable cross-border and mobile populations. This component will include two sub-components: (a) Refugees, IDPs, returnees and surrounding host populations; and (b) Cross-border and Mobile Populations (CBMPs). Subcomponent (a) is well advanced in preparation, and ready to be initiated at project effectiveness; 2) Cross-border collaboration on the health sector response to HIV/AIDS. Specifically, the objectives of this component are to: (a) provide a forum for interaction among IGAD countries in terms of information exchange, sharing of country experiences, and disseminating best practices and lessons learned from providing services to the project target population and facilitate potential harmonization of policies and procedures related to HIV/AIDS; (b) develop mechanisms for continuity of services across borders including referral systems for CBMPs in the selected treatment sites; and (c) develop and adopt a regional strategy for improved HIV, STI prevention, treatment and care services directed to cross-border and mobile populations; and 3) Project Management, Coordination, Capacity Building and Monitoring and Evaluation (M&amp;E). This component would focus on three main sub-components: management and coordination, capacity building and M&amp;E.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="3A–ORP0001627"><narrative>IGAD Secretariat</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A–ORP0001628"><narrative>Inter-Governmental Authority on Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-06-28">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2007-06-28">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-06-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Peter Okwero</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>pokwero@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000051537" />
						<name><narrative>Somalia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>6 48</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000192950" />
						<name><narrative>Republic of Kenya</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>1 38</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000223816" />
						<name><narrative>Republic of Djibouti</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>11.83333 42.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000226074" />
						<name><narrative>Republic of Uganda</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>1.25 32.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000337996" />
						<name><narrative>Federal Democratic Republic of Ethiopia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>9 39.5</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0000366755" />
						<name><narrative>Republic of the Sudan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>16 30</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0007909807" />
						<name><narrative>South Sudan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>7.5 30</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="16010" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="100.000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000621" percentage="67" xml:lang="en"><narrative>HIV/AIDS</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="67" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="67" xml:lang="en"><narrative>Disease Control</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">350000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">300000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">291666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">291666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">291666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">291666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">291666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">308333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">308333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">308333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">308333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">308333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">350000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">300000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">291666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">291666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">291666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">291666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">291666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">308333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">308333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">308333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">308333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">308333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">335083</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">-25508</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">228048</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">183074</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">1023050</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">228574</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">444703</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">2512959</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">253500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">358778</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">659334</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">494208</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">395793</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">790937</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">537285</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">863361</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">226093</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">787465</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">848715</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">337040</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-119970</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">119970</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-61389</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104523"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P104523?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104523"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of condoms distributed in target areas  by IRAPP
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="7,697,484">

</target>
<actual value="16,327,000">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of health facilities providing STI services  in the targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="80">

</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(i) Adoption of a common strategy that includes IRAPP target population; and (ii) harmonized protocols and referral systems
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="No common strategy. No harmonized protocols and referral systems."></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-10-31" />
<target value="All IGAD member countries adopted a common CBMP strategy, harmonized protocols and referral systems.">

</target>
<actual value="Already Achieved">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of regional strategy for improved HIV/AIDS/STI prevention, treatment and care services directed to cross-border and mobile populations, refugees and IDP.
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="No strategy"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-10-31" />
<target value="Regional strategy developed">

</target>
<actual value="Already developed in 2012">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of health facilities providing STI services  in the targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="80">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of functioning VCT sites in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="80">

</target>
<actual value="93">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2012" iso-date="2012-10-30" value="7500000.00"></baseline>
<period>
<period-start iso-date="2012-10-30" />
<period-end iso-date="2014-11-30" />
<target value="10500000.00">

</target>
<actual value="10400000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of population aged 15 to 49 in the target areas who both correctly identify three ways of  preventing the sexual transm.of HIV and who reject major misconceptions about HIV transm.
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="UG: 29.7% (M); 19.9% (F)
NS: 22.1%(M); 2.5% (F)
SS: 41.1%(M); 58.9% (F)
Kenya: 30% (M); 16% (F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="UG: 49.7% (M); 39.9% (F)
NS: 42.1% (M); 22.5% (F)
SS: 61.1% (M); 78.9% (F)
Kenya: 50% (M); 36% (F)">

</target>
<actual value="The data will be available after the end-line BSS being finalized">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2012" iso-date="2012-10-30" value="7,500,000.00"></baseline>
<period>
<period-start iso-date="2012-10-30" />
<period-end iso-date="2014-11-30" />
<target value="10,500,000.00">

</target>
<actual value="10,400,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of PLWHA associations supported by IRAPP in the target areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="47">

</target>
<actual value="56">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of harmonised protocols developed by topics
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-06-29" />
<target value="7">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(i) Adoption of a common strategy that includes IRAPP target population; and (ii) harmonized protocols and referral systems
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="No common strategy. No harmonized protocols and referral systems."></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-10-31" />
<target value="All IGAD member countries adopted a common CBMP strategy, harmonized protocols and referral systems.">

</target>
<actual value="Already Achieved">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of regional strategy for improved HIV/AIDS/STI prevention, treatment and care services directed to cross-border and mobile populations, refugees and IDP.
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="No strategy"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-10-31" />
<target value="Regional strategy developed">

</target>
<actual value="Already developed in 2012">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of harmonised protocols developed by topics
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-06-29" />
<target value="7">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of functioning VCT sites in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="80">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of population aged 15 to 49 in the target areas who both correctly identify three ways of  preventing the sexual transm.of HIV and who reject major misconceptions about HIV transm.
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="UG: 29.7% (M); 19.9% (F)NS: 22.1%(M); 2.5% (F)SS: 41.1%(M); 58.9% (F)Kenya: 30% (M); 16% (F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="UG: 49.7% (M); 39.9% (F)NS: 42.1% (M); 22.5% (F)SS: 61.1% (M); 78.9% (F)Kenya: 50% (M); 36% (F)">

</target>
<actual value="Uganda: 66% (FSW), 73% (Truckers), 59% (Youth M), 66% (Youth F); South Sudan: 73% (FSW), 74% (Trucker), 68% (Youth M) &amp; 64% (Youth F); Sudan: 40 % (FSW), 38% (Truckers), 35% ( Youth M) &amp; 35% (Youth F); Kenya: 90% (FSW), 92% Truckers), 80% (Youth – M) &amp; 73% (Youth F); Ethiopia: 81%(FSW), 95% (Truckers), (M-98%) &amp; F – 49%);">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Condom use at last sex with a transactional partner among men and women 15-49 in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="Uganda: 44.6% (M); 47.3% (F)
SS: 14.1% (M); 22.8%(F)
NS: 6.9% (M); 9.2% (F)
Kenya: 4%(M); 7%(F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="Uganda: 64.6% (M); 67.3% (F)
SS: 34.1% (M); 42.8%(F)
NS: 26.9% (M); 29.2% (F)
Kenya: 24%(M); 27%(F)">

</target>
<actual value="The data will be available after the end-line BSS being finalized">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
VCT: Percentage of populations aged 15-49 in the target areas who undergo HIV voluntary counselling and testing and know their results in the last 12 months
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="Uganda: 44.6% (M); 47.3% (F)
SS: 14.1% (M); 22.8%(F)
NS: 6.9% (M); 9.2% (F)
Kenya: 4%(M); 7%(F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="UG: 66.6% (M); 67.3%(F)
SS:34.1% (M); 42.8%(F)
NS:26.9% (M); 29.2% (F)
Kenya: 24% (M); 27% (F)">

</target>
<actual value="Uganda: 85%(FSWs), 92% (Truckers), 92% (Youth M) &amp; 77% (Youth F); South Sudan: 100% (FSWs), 98% (Truckers), 96%(Youth M) &amp; 91%(Youth F); Sudan: 81% (FSWs), 64% (Truckers), 78% (Youth M) &amp; , 95% (Youth F); Kenya: 100% (FSWs), 89% (Truckers) , 98% (Youth M) &amp;94% (Youth F);">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
STIs: Number of clients receiving STI services in the target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="0"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="65,025">

</target>
<actual value="109,523">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of PLWHA associations supported by IRAPP in the target areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="47">

</target>
<actual value="51">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Condom use at last sex with a non-regular partner among men and women 15-49 in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="UG: 46.7% (M); 31.6% (F)NS: 2.3% (M); 0% (F)SS: 2.5%(M); 0.3% (F)Kenya: 43% (M); 27% (F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="Uganda: 66.7% (M); 51.6% (F)NS: 22.3% (M); 20%(F)SS:22.5% (M);20.3 % (F)Kenya: 63%(M); 47%(F)">

</target>
<actual value="Uganda: 94%(FSW), 88% (Truckers), 80% (Youth M) &amp; 87% (Youth F); South Sudan: 94%(FSW), 79% (Truckers), 81% (Youth M) &amp; 92% (Youth F); Sudan: 80% (FSW), 44% (Truckers), 60% (Youth M) &amp; 20% (Youth F); Kenya: 95%(FSW), 96% (Truckers), 78% (Youth M) &amp; 95% Youth F); Ethiopia: 100% (FSW), 100% (Truckers), 100% (Youth M) &amp; 68% (Youth F);">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of condoms distributed in target areas  by IRAPP
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="7,697,484">

</target>
<actual value="13,081,000">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sites mainstreaming gender in their HIV/AIDS programs
</narrative></title>
<baseline year="2011" iso-date="2011-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2011-06-30" />
<period-end iso-date="2014-11-30" />
<target value="48.00">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of PLWHA associations supported by IRAPP in the target areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="47">

</target>
<actual value="56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sites mainstreaming gender in their HIV/AIDS programs
</narrative></title>
<baseline year="2011" iso-date="2011-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2011-06-30" />
<period-end iso-date="2014-11-30" />
<target value="48.00">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(i) Adoption of a common strategy that includes IRAPP target population; and (ii) harmonized protocols and referral systems
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="No common strategy. No harmonized protocols and referral systems."></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-10-31" />
<target value="All IGAD member countries adopted a common CBMP strategy, harmonized protocols and referral systems.">

</target>
<actual value="Already Achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
VCT: Percentage of populations aged 15-49 in the target areas who undergo HIV voluntary counselling and testing and know their results in the last 12 months
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="Uganda: 44.6% (M); 47.3% (F)SS: 14.1% (M); 22.8%(F)NS: 6.9% (M); 9.2% (F)Kenya: 4%(M); 7%(F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="UG: 66.6% (M); 67.3%(F)SS:34.1% (M); 42.8%(F)NS:26.9% (M); 29.2% (F)Kenya: 24% (M); 27% (F)">

</target>
<actual value="Uganda: 85%(FSWs), 92% (Truckers), 92% (Youth M) &amp; 77% (Youth F); South Sudan: 100% (FSWs), 98% (Truckers), 96%(Youth M) &amp; 91% (Youth F); Sudan: 81% (FSWs), 64% (Truckers), 78% (Youth M) &amp; , 95% (Youth F); Kenya: 100% (FSWs), 89% (Truckers) , 98% (Youth M) &amp; 94% (Youth F);">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PMTCT: Percentage of HIV-positive pregnant women in the target areas who are referred for antiretroviral treatment to reduce the risk of mother-to-child transmission
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="83.3">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of harmonised protocols developed by topics
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-06-29" />
<target value="7">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Condom use at last sex with a transactional partner among men and women 15-49 in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="Uganda: 44.6% (M); 47.3% (F)SS: 14.1% (M); 22.8%(F)NS: 6.9% (M); 9.2% (F)Kenya: 4%(M); 7%(F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="Uganda: 64.6% (M); 67.3% (F)SS: 34.1% (M); 42.8%(F)NS: 26.9% (M); 29.2% (F)Kenya: 24%(M); 27%(F)">

</target>
<actual value="Uganda: 99%(FSW), 91% (Truckers), 100% (Youth M) &amp; 91% (Youth F); South Sudan: 100% (FSW), 85% (Truckers), 87% (Youth M) &amp; 100% (Youth F); Sudan: 82% (FSW), 36% (Truckers), 67% (Youth M) &amp; 49% (Youth F); Kenya: 91%(FSW), 88% (Truckers), 87% (Youth M) &amp; 59% (Youth F); Ethiopia: 100% (FSW), 82% (Truckers), 91% (Youth M) &amp; 100% (Youth F)">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Condom use at last sex with a non-regular partner among men and women 15-49 in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="UG: 46.7% (M); 31.6% (F)
NS: 2.3% (M); 0% (F)
SS: 2.5%(M); 0.3% (F)
Kenya: 43% (M); 27% (F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="Uganda: 66.7% (M); 51.6% (F)
NS: 22.3% (M); 20%(F)
SS:22.5% (M);20.3 % (F)
Kenya: 63%(M); 47%(F)">

</target>
<actual value="The data will be available after the end-line BSS being finalized">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PMTCT: Percentage of HIV-positive pregnant women in the target areas who are referred for antiretroviral treatment to reduce the risk of mother-to-child transmission
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="83.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
STIs: Number of clients receiving STI services in the target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="0"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="65,025">

</target>
<actual value="94,759">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sites mainstreaming gender in their HIV/AIDS programs
</narrative></title>
<baseline year="2011" iso-date="2011-06-30" value="0.00"></baseline>
<period>
<period-start iso-date="2011-06-30" />
<period-end iso-date="2014-11-30" />
<target value="48.00">

</target>
<actual value="48.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of functioning VCT sites in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="80">

</target>
<actual value="93">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
STIs: Number of clients receiving STI services in the target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="0"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="65,025">

</target>
<actual value="109,523">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
VCT: Percentage of populations aged 15-49 in the target areas who undergo HIV voluntary counselling and testing and know their results in the last 12 months
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="Uganda: 44.6% (M); 47.3% (F)
SS: 14.1% (M); 22.8%(F)
NS: 6.9% (M); 9.2% (F)
Kenya: 4%(M); 7%(F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="UG: 66.6% (M); 67.3%(F)
SS:34.1% (M); 42.8%(F)
NS:26.9% (M); 29.2% (F)
Kenya: 24% (M); 27% (F)">

</target>
<actual value="The data will be available after the end-line BSS being finalized">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Condom use at last sex with a transactional partner among men and women 15-49 in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="Uganda: 44.6% (M); 47.3% (F)
SS: 14.1% (M); 22.8%(F)
NS: 6.9% (M); 9.2% (F)
Kenya: 4%(M); 7%(F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="Uganda: 64.6% (M); 67.3% (F)
SS: 34.1% (M); 42.8%(F)
NS: 26.9% (M); 29.2% (F)
Kenya: 24%(M); 27%(F)">

</target>
<actual value="Uganda: 99%(FSW), 91% (Truckers), 100% (Youth M) &amp; 91% (Youth F); South Sudan: 100% (FSW), 85% (Truckers), 87% (Youth M) &amp; 100%(Youth F); Sudan: 82% (FSW), 36% (Truckers), 67% (Youth M) &amp; 49% (Youth F); Kenya: 91%(FSW), 88% (Truckers), 87% (Youth M) &amp; 59%(Youth F); Ethiopia: 100% (FSW), 82% (Truckers), 91% (Youth M) &amp; 100% (Youth F)">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2012" iso-date="2012-10-30" value="7500000.00"></baseline>
<period>
<period-start iso-date="2012-10-30" />
<period-end iso-date="2014-11-30" />
<target value="10500000.00">

</target>
<actual value="10400000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of population aged 15 to 49 in the target areas who both correctly identify three ways of  preventing the sexual transm.of HIV and who reject major misconceptions about HIV transm.
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="UG: 29.7% (M); 19.9% (F)
NS: 22.1%(M); 2.5% (F)
SS: 41.1%(M); 58.9% (F)
Kenya: 30% (M); 16% (F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="UG: 49.7% (M); 39.9% (F)
NS: 42.1% (M); 22.5% (F)
SS: 61.1% (M); 78.9% (F)
Kenya: 50% (M); 36% (F)">

</target>
<actual value="Uganda: 66% (FSW), 73% (Truckers), 59% (Youth M), 66% (Youth F); South Sudan: 73% (FSW), 74% (Trucker), 68% (Youth M) &amp; 64% (YouthF); Sudan: 40 % (FSW), 38% (Truckers), 35% ( Youth M) &amp; 35% (Youth F); Kenya: 90% (FSW), 92% Truckers), 80% (Youth  M) &amp; 73%(YouthF); Ethiopia: 81%(FSW), 95% (Truckers), (M-98%) &amp; F  49%);">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Condom use at last sex with a non-regular partner among men and women 15-49 in target areas
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="UG: 46.7% (M); 31.6% (F)
NS: 2.3% (M); 0% (F)
SS: 2.5%(M); 0.3% (F)
Kenya: 43% (M); 27% (F)"></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2014-12-31" />
<target value="Uganda: 66.7% (M); 51.6% (F)
NS: 22.3% (M); 20%(F)
SS:22.5% (M);20.3 % (F)
Kenya: 63%(M); 47%(F)">

</target>
<actual value="Uganda: 94%(FSW), 88% (Truckers), 80% (Youth M) &amp; 87% (Youth F); South Sudan: 94%(FSW), 79% (Truckers), 81% (Youth M) &amp; 92% (YouthF); Sudan: 80% (FSW), 44% (Truckers), 60% (Youth M) &amp; 20% (Youth F); Kenya: 95%(FSW), 96% (Truckers), 78% (Youth M) &amp; 95% Youth F);Ethiopia: 100% (FSW), 100% (Truckers), 100% (Youth M) &amp; 68% (Youth F);">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of regional strategy for improved HIV/AIDS/STI prevention, treatment and care services directed to cross-border and mobile populations, refugees and IDP.
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="No strategy"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2012-10-31" />
<target value="Regional strategy developed">

</target>
<actual value="Already developed in 2012">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of condoms distributed in target areas  by IRAPP
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="7,697,484">

</target>
<actual value="16,327,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PMTCT: Percentage of HIV-positive pregnant women in the target areas who are referred for antiretroviral treatment to reduce the risk of mother-to-child transmission
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="83.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of health facilities providing STI services  in the targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-05-01" value="0"></baseline>
<period>
<period-start iso-date="2009-05-01" />
<period-end iso-date="2014-12-31" />
<target value="80">

</target>
<actual value="90">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:13:28" hierarchy="1"><iati-identifier>44000-P146512</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>APEI Regional DPO (RI)</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The development objective of the Regional Development Policy Operation (DPO) programmatic series is to improve the policy environment for trade in APEI countries by (i) removing barriers to trade in goods, (ii) promoting trade in services, and (iii) enhancing measures to facilitate trade.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The regional Development Policy Operation (DPO) programmatic series supports a regional reform program of five countries (Malawi, Mauritius, Mozambique, Seychelles, and Zambia), the Accelerated Program for Economic Integration (APEI). Participation in the two proposed budget support operations for the APEI is linked to readiness criteria (outlined below), which only three countries (Mauritius, Mozambique, and Seychelles) currently meet. The first operation in the proposed programmatic series will therefore be for a proposed credit equivalent to US$10 million for Mozambique, and proposed loans (equivalent to US$14.9 million and US$5 million for Mauritius and Seychelles, respectively). The same readiness criteria will be used for all five countries when preparing the second DPO to assess if they are eligible to participate in the second operation. It is expected that all five countries that are members of APEI will participate at that point. Hence, the programmatic series is aligned with the membership in the APEI, its strategic orientation, and the initiative's initial time frame, with the second operation planned for Board presentation in FY17. The operation focuses on these pillars because the reforms in these three pillars are more likely to have positive spillovers to neighboring countries. Therefore, coordinated implementation of reforms is expected to increase the overall returns to the reforms that each country undertakes. As a result, these reforms are more likely to be implemented, and will have larger economic impacts, if addressed in parallel, because countries benefit from their own reforms and also from the reforms in neighboring countries. The programmatic approach permits continued support over time to allow sequencing and deepening of complex reforms, and to support all five countries through the second operation if readiness criteria permit. In short, consistency of reforms and credible regional coordination can help change the political economy of domestic debate and also increase pressure for complementary domestic reforms.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="3A–ORP0015179"><narrative>Ministry of Finance and Economic Development</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0015180"><narrative>Ministry of Planning and Development</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="3A–ORP0015181"><narrative>Ministry of Finance, Trade and Investment</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-12-31">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2016-04-07">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2017-03-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2017-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Gozde Isik</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>gisik@worldbankgroup.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>




<recipient-region code="298" percentage="100" vocabulary="1"><narrative xml:lang="en">Africa, regional</narrative></recipient-region><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="0000000" />
								<name>
									<narrative>No Data Available</narrative>
								</name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
								<pos>0.00 0.00</pos>
							</point>
							<exactness code="2"/>
							<location-class code="4" />
						</location><sector vocabulary="1" code="33120" percentage="33" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="33130" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="93.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="72" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="7" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="72" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="21" xml:lang="en"><narrative>Regional Integration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-03-31 00:00:00.0000000-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">29900000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-31 00:00:00.0000000-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">29900000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">5000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">14900000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">10000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-9887047</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><flow-type code="10" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">38841</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">12500</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">15278992</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">4987500</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-38841</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-12500</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-2235</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-6680</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-55974</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-1090</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-152149</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-70138</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-128220</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-74367</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-128988</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-88238</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-122446</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-101200</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-121174</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-105332</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-119405</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-88933</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-116991</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-79878</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-127906</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-45744</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-131115</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-41731</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-119163</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-41144</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-103772</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-99673</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-99616</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-94964</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-90095</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-83628</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-83883</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-82210</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-82500</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-77541</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-638979</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-603983</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-547915</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-549181</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-573839</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-573127</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-570965</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-557910</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-590744</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-612871</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-161500</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-614453</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146512"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P146512?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146512"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity></iati-activities>