		   <title>
		   <narrative>Prototype Carbon Fund	   </narrative>
		   </title>
		   <description type="1">
		   <narrative>The Project is for the refurbishment and fuel switch . from coal to biomass . of Block VI of Pécs power plant.  The Project take places in the context of a complex boiler rehabilitation / fuel-switch operation and will result in one of the biggest renewable generating facility of Central Eastern Europe. </narrative>
		   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XI-IATI-WBTF" type="40" role="4" >
       <narrative>World Bank Trust Funds </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "1999-07-20"></activity-date><activity-date type="2"  iso-date= "1999-07-20"></activity-date><activity-date type="3"  iso-date= "2024-12-31"></activity-date><activity-date type="4"  iso-date= "2021-07-27"></activity-date> <contact-info type="3">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative>Sol. &amp; Impact-Carbon Finan. Sol.</narrative>
       </department>
       <person-name>
       <narrative>Mr Daniel Radack</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Carbon Finance Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>dradack@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="1"></activity-scope> <recipient-region code="998">   <narrative>Bilateral unspecified</narrative>
       </recipient-region> <sector code="14050" 
	    vocabulary="1" percentage="0.20">
       <narrative>+![cdata[Waste management/disposal]]+</narrative>
       </sector> <sector code="15110" 
	    vocabulary="1" percentage="0.47">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="15112" 
	    vocabulary="1" percentage="1.11">
       <narrative>+![cdata[Decentralisation and support to subnational government]]+</narrative>
       </sector> <sector code="22040" 
	    vocabulary="1" percentage="0.04">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector> <sector code="23020" 
	    vocabulary="1" percentage="22.10">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23030" 
	    vocabulary="1" percentage="53.97">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector> <sector code="23040" 
	    vocabulary="1" percentage="17.01">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector> <sector code="31220" 
	    vocabulary="1" percentage="5.11">
       <narrative>+![cdata[Forestry development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="B03"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="1999-07-20"></period-start> 
       <period-end iso-date="2024-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">177946658.60 </value>
       </budget><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="">
       <narrative></narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="44000">
       <narrative>International Bank for Reconstruction and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF625007">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF654001">
       <narrative>Mitsui &amp; Co., Ltd</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="FI-3">
       <narrative>Finland - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810007">
       <narrative>Chubu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810010">
       <narrative>Statoil ASA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-701-8">
       <narrative>Japan International Cooperation Agency (JICA)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">12110904.02  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF758001">
       <narrative>Fortum Oy</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1250841.98  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510024">
       <narrative>Robeco Sustainable Private Equity C</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1251471.44  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF718018">
       <narrative>BP Alternative Energy International Limited</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">13158269.63  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810001">
       <narrative>Electrabel N.V.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">15000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510008">
       <narrative>Netherlands - Ministry of Economic Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18918593.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF511001">
       <narrative>Norway - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">19000447.45  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF504010">
       <narrative>Swedish Energy Agency</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2124787.50  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF716009">
       <narrative>Department of Environment (known as Environment Canada)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3747156.90  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF585001">
       <narrative>BP International Ltd.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3868162.51  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810011">
       <narrative>Mit Carbon Fund Company Ltd.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810002">
       <narrative>Mitsubishi Corporation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810009">
       <narrative>RWE AG</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810012">
       <narrative>Norsk Hydro Asa</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810014">
       <narrative>GDF Suez</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5245892.97  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810003">
       <narrative>Chugoku Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5834241.73  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810013">
       <narrative>Deutsche Bank Ag</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6784564.93  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810005">
       <narrative>Tokyo Electric Power Company Holdin Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7493649.16  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF509001">
       <narrative>Canada - Department of Foreign Affairs, Trade and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7493649.17  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810006">
       <narrative>Tohoku Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7493649.17  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810008">
       <narrative>Shikoku Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8000000.00  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810004">
       <narrative>Kyushu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">810192.82  </value>
		   <description>
       <narrative>Incoming Funds (Cumulative Paid-In Contribution )-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF757001">
       <narrative>Gilde Strategic Situations</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF716009">
       <narrative>Department of Environment (known as Environment Canada)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1215461.12  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810004">
       <narrative>Kyushu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1504890.83  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF758001">
       <narrative>Fortum Oy</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1656201.95  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810001">
       <narrative>Electrabel N.V.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190228.09  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810014">
       <narrative>GDF Suez</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190258.09  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF718018">
       <narrative>BP Alternative Energy International Limited</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190258.09  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810009">
       <narrative>RWE AG</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190274.40  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810012">
       <narrative>Norsk Hydro Asa</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-3735524.60  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF504010">
       <narrative>Swedish Energy Agency</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381530.74  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810010">
       <narrative>Statoil ASA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381563.34  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="FI-3">
       <narrative>Finland - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381563.34  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810007">
       <narrative>Chubu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381572.92  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-701-8">
       <narrative>Japan International Cooperation Agency (JICA)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-570984.60  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510008">
       <narrative>Netherlands - Ministry of Economic Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-759764.40  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810002">
       <narrative>Mitsubishi Corporation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-9300119.75  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF511001">
       <narrative>Norway - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="1"></transaction-type>
       <transaction-date iso-date="2021-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-575288.30  </value>
		   <description>
       <narrative>Incoming Funds (Paid-In Contribution cancellations/Adjustments) -  for July , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810013">
       <narrative>Deutsche Bank Ag</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF654001">
       <narrative>Mitsui &amp; Co., Ltd</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="FI-3">
       <narrative>Finland - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810007">
       <narrative>Chubu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810010">
       <narrative>Statoil ASA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-701-8">
       <narrative>Japan International Cooperation Agency (JICA)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">12098003.43  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF758001">
       <narrative>Fortum Oy</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1250337.16  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF718018">
       <narrative>BP Alternative Energy International Limited</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1250841.98  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510024">
       <narrative>Robeco Sustainable Private Equity C</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">13155042.34  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810001">
       <narrative>Electrabel N.V.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">15000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510008">
       <narrative>Netherlands - Ministry of Economic Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18918593.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF511001">
       <narrative>Norway - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18993536.22  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF504010">
       <narrative>Swedish Energy Agency</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2506350.84  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF716009">
       <narrative>Department of Environment (known as Environment Canada)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3747156.91  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF585001">
       <narrative>BP International Ltd.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">3868162.51  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810011">
       <narrative>Mit Carbon Fund Company Ltd.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810002">
       <narrative>Mitsubishi Corporation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810009">
       <narrative>RWE AG</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810012">
       <narrative>Norsk Hydro Asa</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810014">
       <narrative>GDF Suez</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5245892.97  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810003">
       <narrative>Chugoku Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5824083.87  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810013">
       <narrative>Deutsche Bank Ag</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6784564.93  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810005">
       <narrative>Tokyo Electric Power Company Holdin Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7493649.16  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF509001">
       <narrative>Canada - Department of Foreign Affairs, Trade and Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7493649.17  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810006">
       <narrative>Tohoku Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7493649.17  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810008">
       <narrative>Shikoku Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">8000000.00  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810004">
       <narrative>Kyushu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">810192.82  </value>
		   <description>
       <narrative>Incoming Commitment(Cumulative Signed Contribution)-as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF757001">
       <narrative>Gilde Strategic Situations</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1215461.12  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810004">
       <narrative>Kyushu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1504890.83  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF758001">
       <narrative>Fortum Oy</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-1656201.95  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810001">
       <narrative>Electrabel N.V.</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190228.09  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810014">
       <narrative>GDF Suez</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190258.09  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF718018">
       <narrative>BP Alternative Energy International Limited</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190258.09  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810009">
       <narrative>RWE AG</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-190274.40  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810012">
       <narrative>Norsk Hydro Asa</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-3735524.60  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF504010">
       <narrative>Swedish Energy Agency</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381530.74  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810010">
       <narrative>Statoil ASA</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381563.34  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="FI-3">
       <narrative>Finland - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381563.34  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF716009">
       <narrative>Department of Environment (known as Environment Canada)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381563.34  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810007">
       <narrative>Chubu Electric Power Company, Inc</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-381572.92  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XM-DAC-701-8">
       <narrative>Japan International Cooperation Agency (JICA)</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-570984.60  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF510008">
       <narrative>Netherlands - Ministry of Economic Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-759764.40  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810002">
       <narrative>Mitsubishi Corporation</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-9300119.75  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for June , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF511001">
       <narrative>Norway - Ministry of Foreign Affairs</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-575288.30  </value>
		   <description>
       <narrative>Incoming Commitment(Signed Contribution cancellations/Adjustments) -  for July , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="TF810013">
       <narrative>Deutsche Bank Ag</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1041645.87  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076421">
       <narrative>COSTA RICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10842252.70  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P084860">
       <narrative>INDONESIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11172210.90  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087153">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1243750.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075560">
       <narrative>BULGARIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1265916.34  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087464">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">128314.73  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1328987.80  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1376785.05  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1482328.80  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1523906.20  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P077763">
       <narrative>MOLDOVA, REPUBLIC OF</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1706000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P058477">
       <narrative>LATVIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">17665165.87  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">18040637.48  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative>Bilateral, unspecified</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1967820.28  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P073542">
       <narrative>CZECH REPUBLIC</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27003357.40  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087291">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">33644.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">348000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P078250">
       <narrative>POLAND</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">370064.60  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P081023">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">391970.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">436040.38  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076421">
       <narrative>COSTA RICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4733.30  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087292">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4802774.22  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074547">
       <narrative>HUNGARY</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4963997.06  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P077575">
       <narrative>BULGARIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5199116.42  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075871">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">59932.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6591512.12  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074619">
       <narrative>CHILE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7450000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P091407">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7715506.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7892374.80  </value>
		   <description>
       <narrative>Outgoing Commitment ( Total Grant Allocated Amount to Project ) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087292">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">86907.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">90473.81  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-22751.20  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for July , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities -  for July , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-57573.43  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for September , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-80293.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for September , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-6665.74  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for October , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-220000.00  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for November , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-3089.06  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for February , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-4553.72  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for February , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-">
       <narrative></narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-8007.71  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for February , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="2"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-122096.60  </value>
		   <description>
       <narrative>Outgoing Commitment ( Grant Allocated Amount Cancellation/Adjustments ) -  for March , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-P058477"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P072090"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P073542"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P074426"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P074547"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P074619"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075560"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075871"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P075959"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P076421"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P077575"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P077763"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P078250"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P080600"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P081023"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P084860"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P087153"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P087291"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P087292"  type="4"></related-activity><related-activity ref="XI-IATI-WBTF-P087464"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P087979"  type="2"></related-activity><related-activity ref="XI-IATI-WBTF-P091407"  type="2"></related-activity>
   </iati-activity>	<iati-activity last-updated-datetime="2026-10-15T19:01:10"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P058477</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>LIEPAJA REGION SOLID WASTE MANAGEMENT PROJECT</narrative>
       </title>
       <description type="1">
       <narrative>The project's development objective is to reduce carbon emission from solid waste landfill in Latvia.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2000-12-18"></activity-date><activity-date type="2"  iso-date= "2000-12-18"></activity-date><activity-date type="3"  iso-date= "2021-06-30"></activity-date><activity-date type="4"  iso-date= "2014-01-21"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Katelijn Van den Berg</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Environmental Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>kvandenberg@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="LV">     <narrative>LATVIA</narrative>
       </recipient-country> <sector code="15110"  vocabulary="1" percentage="30.00">
       <narrative>+![cdata[Public sector policy and administrative management]]+</narrative>
       </sector> <sector code="15112"  vocabulary="1" percentage="70.00">
       <narrative>+![cdata[Decentralisation and support to subnational government]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2000-12-18"></period-start> 
       <period-end iso-date="2021-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">1706000.00 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1706000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P058477">
       <narrative>LATVIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1706000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P058477">
       <narrative>LATVIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Carbon Emission Reductions
</narrative></title> 
<baseline year="2002" iso-date="2002-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-01-01" />  <period-end iso-date="2013-07-31" />
<target value="264052.00">

																	<comment><narrative> 

																	The current target goal is 264,052 tons of carbon equivalent reduction (70,156  and 193,896 tons of Carbon equivalent by theLiepaja and Getlini Project, respectively. The original contract was for 387,933 tons.
	</narrative></comment> 

																	</target>

																	<actual value="70156.00">

																	<comment><narrative>

																		By December 13,2012, 70,156 tons of carbon equivalent reduced by this Liepaja Project and verified .
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Carbon Emission Delivered
</narrative></title> 
<baseline year="2002" iso-date="2002-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-01-01" />  <period-end iso-date="2013-07-31" />
<target value="264052.00">

																	<comment><narrative> 

																	By July 31,  2013, additional 193,896 AAUs will be transferred.
	</narrative></comment> 

																	</target>

																	<actual value="4767.00">

																	<comment><narrative>

																		No change.  But, additional 65,389 tons were verified
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:13"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P072090</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>UG-West Nile Electrification</narrative>
       </title>
       <description type="1">
       <narrative>&lt;p&gt;The overall objectives of the West Nile Electrification Project are to promote socio-economic development in rural Uganda and to reduce energy-related CO2 emissions causing global climate change. The project entails installation and operation of a 3.5 MW (2 uni ts of 1.75 MW) hydroelectric power plant, which became operational in September 2012.&lt;/p&gt;&lt;p&gt;The project also upgrades and extends the distribution networks in Paidha, Nebbi, and Arua municipalities, in order to connect 4,000 additional customers, who would other wise operate small, privately-owned generation facilities.&lt;/p&gt;  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-07-16"></activity-date><activity-date type="2"  iso-date= "2003-07-16"></activity-date><activity-date type="3"  iso-date= "2020-10-31"></activity-date><activity-date type="4"  iso-date= "2020-07-06"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Raihan Elahi</narrative>
       </person-name>
       <job-title>
       <narrative>Lead Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>relahi@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="UG">     <narrative>UGANDA</narrative>
       </recipient-country> <sector code="22040"  vocabulary="1" percentage="11.00">
       <narrative>+![cdata[Information and communication technology (ICT)]]+</narrative>
       </sector> <sector code="23020"  vocabulary="1" percentage="26.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23030"  vocabulary="1" percentage="38.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-07-16"></period-start> 
       <period-end iso-date="2020-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">375833.72 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">391970.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">86907.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-22751.20  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for July , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-80293.00  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for September , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">311677.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">64156.72  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P072090">
       <narrative>UGANDA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="44000-P072090" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="1">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Direct project beneficiaries
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-27" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Female beneficiaries
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-27" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Emissions Reductions (t CO2e)
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-27" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of Hydropower constructed under the project
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-27" />  <period-end iso-date="2017-12-31" />
<target value="3.50">


																	</target>

																	<actual value="3.50">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Generation Capacity of Hydropower constructed or rehabilitated under the project
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-06-27" />  <period-end iso-date="2017-12-31" />
<target value="3.50">


																	</target>

																	<actual value="3.50">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:19"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P074426</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Jepirachi Carbon Off Set Project</narrative>
       </title>
       <description type="1">
       <narrative>The objective of the Jepirachi Carbon Offset Project (JCP or Jepirachi Project) is to contribute to the reduction of greenhouse gas (GHG) emissions from the power sector in Colombia through the promotion of a 19.5 MW wind-based electricity generation facility. The project is expected to displace an estimated 1.168 million metric tons of carbon dioxide equivalent (mtCO2e)  over a period of 21 years and will also support a social program that will contribute to improvements in the welfare of the local indigenous community.  The JCP, will contribute to the development of the international carbon market in Colombia through the supply of Emission Reductions (ERs), developed under the Clean Development Mechanism (CDM) as set forth under Article 12 of the Kyoto Protocol.  By linking the global issue with local development concerns the project truly reflects the spirit of the CDM. The ERs are classified as high quality because of the reliability of the project and the social benefits represented by the social program for the indigenous people. </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-03-10"></activity-date><activity-date type="2"  iso-date= "2003-03-10"></activity-date><activity-date type="3"  iso-date= "2024-10-31"></activity-date><activity-date type="4"  iso-date= "2021-02-23"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Claudia Croce</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>ccroce@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="CO">     <narrative>COLOMBIA</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-03-10"></period-start> 
       <period-end iso-date="2024-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1353880.47 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">0.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1328987.80  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">90473.81  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-09-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-57573.43  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for September , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-8007.71  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for February , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1271414.37  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">82466.10  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074426">
       <narrative>COLOMBIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reductions Delivered to the Bank
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-12-10" />  <period-end iso-date="2013-12-31" />
<target value="433.69">


																	</target>

																	<actual value="153.52">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Improved access to potable water through water desalinization unit.
</narrative></title> 
<baseline year="2003" iso-date="2003-01-27" value="No water service"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2003-01-27" />  <period-end iso-date="2013-12-31" />
<target value="Adequate functioning of the water desalinization p">


																	</target>

																	<actual value="The water desalinization plant has been in operati">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Wind based electricity generation facility generates electricity with a capacity of 19.5 MW and delivers its output to the nationalinterconnected grid.
</narrative></title> 
<baseline year="2003" iso-date="2003-01-27" value="0.00"><comment>
					<narrative>No wind based electricity generation.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2003-01-27" />  <period-end iso-date="2013-12-31" />
<target value="19.50">


																	</target>

																	<actual value="18.20">

																	<comment><narrative>

																		The current production averages around 54.85 GWh. Unit 15 is under maintenance.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:27"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P074547</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Hungary - Pannonpower Biomass Project (PCF)</narrative>
       </title>
       <description type="1">
       <narrative>The objectives of the Project are to provide peaking and reserve capacity to ensure a highly reliable heat supply to the district heating system of the city of Pecs and to generate renewable electricity that reduces GHG emissions and local pollution by switching fuels used in one of the Pecs CHP units.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-08-28"></activity-date><activity-date type="2"  iso-date= "2003-08-28"></activity-date><activity-date type="3"  iso-date= "2014-08-31"></activity-date><activity-date type="4"  iso-date= "2014-08-22"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr William Nicholas Bowden</narrative>
       </person-name>
       <job-title>
       <narrative>Carbon Finance Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="HU">     <narrative>HUNGARY</narrative>
       </recipient-country> <sector code="23020"  vocabulary="1" percentage="17.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23030"  vocabulary="1" percentage="67.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="16.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-08-28"></period-start> 
       <period-end iso-date="2014-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">4802774.22 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4802774.22  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074547">
       <narrative>HUNGARY</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4802774.22  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074547">
       <narrative>HUNGARY</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Reduction of greenhouse gas emissions
</narrative></title> 
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-01-01" />  <period-end iso-date="2012-12-31" />
<target value="1193000.00">


																	</target>

																	<actual value="1063879.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Annual Emission Reduction Schedule
</narrative></title> 
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2008-01-01" />  <period-end iso-date="2012-12-31" />
<target value="1193000.00">

																	<comment><narrative> 

																	Culumative ERs through end of 2012
	</narrative></comment> 

																	</target>

																	<actual value="1063879.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:30"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P074619</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>CHILE - Chacabuquito Hydro Power Project</narrative>
       </title>
       <description type="1">
       <narrative>To help mitigate global climate change through carbon emission reductions (ERs) of 138,000 tCO2e per year  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2002-02-04"></activity-date><activity-date type="2"  iso-date= "2002-02-04"></activity-date><activity-date type="3"  iso-date= "2023-02-28"></activity-date><activity-date type="4"  iso-date= "2015-05-14"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Javier Freire Coloma</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="CL">     <narrative>CHILE</narrative>
       </recipient-country> <sector code="23020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2002-02-04"></period-start> 
       <period-end iso-date="2023-02-28"> </period-end>
       <value currency="USD" value-date="2026-03-31">6591512.12 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6591512.12  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P074619">
       <narrative>CHILE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">6591512.12  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P074619">
       <narrative>CHILE</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Cumulated CERs (tCO2e)
</narrative></title> 
<baseline year="2002" iso-date="2002-08-31" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-08-31" />  <period-end iso-date="2012-12-31" />
<target value="1000000">


																	</target>

																	<actual value="0">

																	<comment><narrative>

																		No CER have been paid yet.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-02-04" />  <period-end iso-date="2012-12-31" />
<target value="1000000.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:32"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075560</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>WOOD RESIDUE TO ENERGY</narrative>
       </title>
       <description type="1">
       <narrative>The objective of the project is to use the wood wastes produced at the plant to replace coal currently used, thereby substantially reducing the greenhouse gas (GHG) emissions from coal burning, and the methane emissions from decomposition of the waste material.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-09-24"></activity-date><activity-date type="2"  iso-date= "2003-09-24"></activity-date><activity-date type="3"  iso-date= "2014-12-31"></activity-date><activity-date type="4"  iso-date= "2015-03-23"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Pekka Kalevi Salminen</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="BG">     <narrative>BULGARIA</narrative>
       </recipient-country> <sector code="23020"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-09-24"></period-start> 
       <period-end iso-date="2014-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1243750.00 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1243750.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075560">
       <narrative>BULGARIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1243750.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075560">
       <narrative>BULGARIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Delivery of annual carbon emission reductions
</narrative></title> 
<baseline year="2003" iso-date="2003-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2003-12-31" />  <period-end iso-date="2012-12-31" />
<target value="450000.00">


																	</target>

																	<actual value="32727700.00">

																	<comment><narrative>

																		Not all ERs are verified
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Reduction of GHG emissions to be produced ny the project and transferred to the Trusteee as Contract ER (ton of ER)
</narrative></title> 
<baseline year="2003" iso-date="2003-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2003-12-31" />  <period-end iso-date="2012-12-31" />
<target value="450000.00">

																	<comment><narrative> 

																	ERPA target volume will be reduced after verification of 2009-2011 ERs
	</narrative></comment> 

																	</target>

																	<actual value="327277.00">

																	<comment><narrative>

																		Not all ERs are verified
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:34"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075871</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>PCF Minas Gerais Plantar Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2002-10-03"></activity-date><activity-date type="2"  iso-date= "2002-10-03"></activity-date><activity-date type="3"  iso-date= "2024-12-31"></activity-date><activity-date type="4"  iso-date= "2019-04-24"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Christophe de Gouvello</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Energy Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>cdegouvello@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="BR">     <narrative>BRAZIL</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector> <sector code="31220"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Forestry development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2002-10-03"></period-start> 
       <period-end iso-date="2024-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">5199116.42 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5199116.42  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075871">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5199116.42  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075871">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
1.5 million metric ton of Kyoto compliant emisison reductions
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-09-04" />  <period-end iso-date="2011-06-30" />
<target value="1500000.00">


																	</target>

																	<actual value="1500000.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
23,100 hecates of well management plantation forests
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2002-09-04" />  <period-end iso-date="2010-12-31" />
<target value="23000.00">


																	</target>

																	<actual value="23100.00">

																	<comment><narrative>

																		this palntations are certified by FSC and are in compliance with OP 4.36
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:37"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P075959</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Afforestation of Degraded Agricultural Land Proto-Carbon Project</narrative>
       </title>
       <description type="1">
       <narrative>The Project has one main objective, namely (1) the reduction of greenhouse gas concentrations through carbon sequestration in planted trees and in soils. In the process of working towards this objective, the Project will also achieve two subsidiary objectives: (2) stabilization of degraded sandy agricultural lands through the planting of Robinia sp. and, conditions permitting, Quercus sp. anda number of minor species; and (3) ecological reconstruction of degraded lands in the lower Danube floodplain through planting of native broadleaf species, mostly Populus alba, Populus nigra and Salix sp.        The Project will also enable Romania to enter andbenefit from the carbon market. (4) Beyond the carbon sales proceeds from the Prototype Carbon Fund, the Project should be able to keep earning revenues from other carbon buyers. (5) More strategically, Romania will garner trading experience and relations for thefuture, in the fields of forestry, but also energy. Being able to harness the carbon market will catalyze public and private investment flows to Romania.       Furthermore, the Project contributes to (6) the transformation of the rural economy, from exploiting natural resources to acting as steward of natural resources.       </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-10-02"></activity-date><activity-date type="2"  iso-date= "2003-10-02"></activity-date><activity-date type="3"  iso-date= "2021-08-31"></activity-date><activity-date type="4"  iso-date= "2021-02-23"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Yevgen Yesyrkenov</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="RO">     <narrative>ROMANIA</narrative>
       </recipient-country> <sector code="31220"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Forestry development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-10-02"></period-start> 
       <period-end iso-date="2021-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1848083.58 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">128314.73  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1482328.80  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">455529.11  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">5000.00  </value>
		   <description>
       <narrative>Allocation to Bank executed activities -  for July , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-11-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-220000.00  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for November , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-02-28"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-3089.06  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for February , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1282903.11  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-07-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">434954.80  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for July , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">127400.39  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2825.28  </value>
		   <description>
       <narrative>Expenditures to Bank executed activities -  for the month of August , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P075959">
       <narrative>ROMANIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission reduction (tCO2 equiv.)
</narrative></title> 
<baseline year="2001" iso-date="2001-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2001-12-31" />  <period-end iso-date="2017-12-31" />
<target value="411758.00">


																	</target>

																	<actual value="255505.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission reduction (tCo2e)
</narrative></title> 
<baseline year="2001" iso-date="2001-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2001-12-31" />  <period-end iso-date="2017-12-31" />
<target value="411758.00">


																	</target>

																	<actual value="255505.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Stabilization of degraded sandy agricultural lands
</narrative></title> 
<baseline year="2001" iso-date="2001-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2001-12-31" />  <period-end iso-date="2017-12-31" />
<target value="2132.00">


																	</target>

																	<actual value="2132.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Ecological reconstruction of degraded lands in the lower Danube floodplain
</narrative></title> 
<baseline year="2001" iso-date="2001-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2001-12-31" />  <period-end iso-date="2017-12-31" />
<target value="1586.00">


																	</target>

																	<actual value="1586.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:48"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P076421</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Costa Rica - Cote Hydroelectric Project</narrative>
       </title>
       <description type="1">
       <narrative>The objective of the Project is to support the National Power and Light Company (Compania Nacional de Fuerza y Luz) in developing initial experience with the Clean Development Mechanism of the Kyoto Protocol by supporting the development of a 6.95 MW capacity hydroelectric project in Costa Rica. </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2002-12-03"></activity-date><activity-date type="2"  iso-date= "2002-12-03"></activity-date><activity-date type="3"  iso-date= "2019-10-31"></activity-date><activity-date type="4"  iso-date= "2020-06-16"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Guillermo Hernandez Gonzalez</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="CR">     <narrative>COSTA RICA</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2002-12-03"></period-start> 
       <period-end iso-date="2019-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1477686.25 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1041645.87  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P076421">
       <narrative>COSTA RICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">436040.38  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P076421">
       <narrative>COSTA RICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">436040.38  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076421">
       <narrative>COSTA RICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">122335.87  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P076421">
       <narrative>COSTA RICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Certification of Emission Reductions
</narrative></title> 
<baseline year="2003" iso-date="2003-04-01" value="0 CERs"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2003-04-01" />  <period-end iso-date="2018-12-31" />
<target value="65,770 CERs">


																	</target>

																	<actual value="64,762 CERs">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Average electricity generation
</narrative></title> 
<baseline year="2003" iso-date="2003-04-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2003-04-01" />  <period-end iso-date="2018-12-31" />
<target value="13.20">


																	</target>

																	<actual value="13.24">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:50"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P077575</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>DISTRICT HEAT (PCF)</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2004-07-08"></activity-date><activity-date type="2"  iso-date= "2004-07-08"></activity-date><activity-date type="3"  iso-date= "2013-06-30"></activity-date><activity-date type="4"  iso-date= "2012-12-04"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Pekka Kalevi Salminen</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="BG">     <narrative>BULGARIA</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2004-07-08"></period-start> 
       <period-end iso-date="2013-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">4963997.06 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4963997.06  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P077575">
       <narrative>BULGARIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4963997.06  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P077575">
       <narrative>BULGARIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:53"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P077763</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Soil Conservation Project</narrative>
       </title>
       <description type="1">
       <narrative>&quot;The major goal of the project is to increase the forest territories in the Republic of Moldova, afforesting new degradeted agricultu ral lands and thus contributing to the carbon sequestration. These activities are in line with the Climate Change Convention Kyoto P rotocol and are aimed to prevent the global warming. The main objectives of the project are : (a). To prepare a concrete program for  afforestation of degradated agricultural land; (b)To estimate the total CO2 abatement from the project implementation; (c) To ident ify specific global and local social and ecological benefits; The project preparing and implementing is supported by the World Bank Prototype Carbon Fund (PCF). The main goal of the Fund is to mitigate the climate change and demonstrate the possibilities of public -private partnerships in this area , and to offer a &quot;&quot;learning-by-doing&quot;&quot; opportunity to its stakeholders.&quot; </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF021330" type="40" role="4" >
       <narrative>Special Fund for Policy and Human Resources Development </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF513001" type="10" role="1" >
       <narrative>Japan - Ministry of Finance </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2004-01-23"></activity-date><activity-date type="2"  iso-date= "2004-01-23"></activity-date><activity-date type="3"  iso-date= "2014-06-30"></activity-date><activity-date type="4"  iso-date= "2011-05-17"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Anatol Gobjila</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Agriculture Economist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>agobjila@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="MD">     <narrative>MOLDOVA, REPUBLIC OF</narrative>
       </recipient-country> <sector code="31220"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Forestry development]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2004-01-23"></period-start> 
       <period-end iso-date="2014-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">2443254.92 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1523906.20  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P077763">
       <narrative>MOLDOVA, REPUBLIC OF</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">919348.72  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF021330">
       <narrative>Special Fund for Policy and Human Resources Development</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P077763">
       <narrative>MOLDOVA, REPUBLIC OF</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2443254.92  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P077763">
       <narrative>MOLDOVA, REPUBLIC OF</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF021330" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:55"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P078250</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>POLAND - Stargard Geothermal Project (PCF)</narrative>
       </title>
       <description type="1">
       <narrative>The  Project  development objective is the reduction in the emissions of carbon dioxide  through  displacement of coal-fired district heat with renewable heat produced from geothermal energy.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2005-12-09"></activity-date><activity-date type="2"  iso-date= "2005-12-09"></activity-date><activity-date type="3"  iso-date= "2014-08-31"></activity-date><activity-date type="4"  iso-date= "2015-05-14"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Dmytro Glazkov</narrative>
       </person-name>
       <job-title>
       <narrative>Senior Power Engineer</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>dglazkov@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="PL">     <narrative>POLAND</narrative>
       </recipient-country> <sector code="23020"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="25.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2005-12-09"></period-start> 
       <period-end iso-date="2014-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">348000.00 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">348000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P078250">
       <narrative>POLAND</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">348000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P078250">
       <narrative>POLAND</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-01-01" />  <period-end iso-date="2012-12-31" />
<target value="250000.00">

																	<comment><narrative> 

																	Cumulative ERs though end of 2012
	</narrative></comment> 

																	</target>

																	<actual value="47506.00">

																	<comment><narrative>

																		Recurrent productions problems coupled with bankruptcy of project entity and imminent sale to new developer have resulted in farfewer ERs than originally estimated.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="2005" iso-date="2005-01-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-01-01" />  <period-end iso-date="2012-12-31" />
<target value="278222.00">


																	</target>

																	<actual value="47506.00">

																	<comment><narrative>

																		Recurrent productions problems coupled with bankruptcy of project entity and imminent sale to new developer have resulted in farfewer ERs than originally estimated.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:01:58"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P080600</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Durban Landfill Gas-to-Electricity Project</narrative>
       </title>
       <description type="1">
       <narrative>The project consists of an enhanced collection of landfill gas at two landfill sites of the municipality of Durban and the use of the recovered gas to produce electricity and generate Emission Reductions. The produced electricity will be fed into the municipal grid and replace electricity that the municipal electric company is currently buying from other suppliers. The project will be implemented on the Mariannhill and (originally projected) at the La Mercy landfill sites.The Mariannhill landfill is an active landfill site where waste will be deposited until 2024. It extends over 49 ha and receives 550 to 700 tonnes of waste per day. The Mariannhilllandfill was officially designated a Nature Conservancy site in late 2002. It is the only landfill in South Africa granted such a status.The second landfill site, La Mercy, is an old landfill, which is now closed and is not generating Emission Reductions.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2004-06-11"></activity-date><activity-date type="2"  iso-date= "2004-06-11"></activity-date><activity-date type="3"  iso-date= "2020-12-31"></activity-date><activity-date type="4"  iso-date= "2020-10-09"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Xiaoyu Chang</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>xchang@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="ZA">     <narrative>SOUTH AFRICA</narrative>
       </recipient-country> <sector code="14050"  vocabulary="1" percentage="15.00">
       <narrative>+![cdata[Waste management/disposal]]+</narrative>
       </sector> <sector code="23030"  vocabulary="1" percentage="85.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2004-06-11"></period-start> 
       <period-end iso-date="2020-12-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1430052.23 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1376785.05  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">59932.92  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-10-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-6665.74  </value>
		   <description>
       <narrative>Allocation to Bank executed activities ( Cancellation/Adjustments ) -  for October , 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1184392.45  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-08-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">192392.60  </value>
		   <description>
       <narrative>Disbursement(Recipient-Executed Trust Funds Disbursements ) -  for August , 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">53267.18  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P080600">
       <narrative>SOUTH AFRICA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Verified Emission Reduction (VER) Volume Achieved
</narrative></title> 
<baseline year="2006" iso-date="2006-09-01" value="0.00"><comment>
					<narrative>Tonnes of CO2 equivalent to be delivered</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-09-01" />  <period-end iso-date="2017-12-31" />
<target value="700000.00">

																	<comment><narrative> 

																	Tonnes of CO2 equivalent to be delivered
	</narrative></comment> 

																	</target>

																	<actual value="146294.00">

																	<comment><narrative>

																		Tonnes of CO2 equivalent to be delivered
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="2" ascending="1">

															<title><narrative>
Commissioning of Project
</narrative></title> 
<baseline year="2006" iso-date="2006-09-01" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-09-01" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="100.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:00"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P081023</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>PCF Sugar Bagasse Cogeneration Project</narrative>
       </title>
       <description type="1">
       <narrative>&quot;The objective of the Project is to reduce emissions by generating energy from renewable sources. Furthermore, the project supports development of an international market mechanism for &quot;&quot;Emission Reductions&quot;&quot; (ER), under the framework of the Kyoto Protocol.  Although the PDO has not changed since project approval in June 2005, the implementing agency has modified the original project design (in order to expand its operations due to the natural course of business).  As a result, a decision to submit a revised PDD (Project Design Document) to the CDM Board is being considered since the project no longer conforms to its original design.&quot; </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2005-11-04"></activity-date><activity-date type="2"  iso-date= "2005-11-04"></activity-date><activity-date type="3"  iso-date= "2014-08-31"></activity-date><activity-date type="4"  iso-date= "2013-01-16"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr David Reinstein</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="BR">     <narrative>BRAZIL</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2005-11-04"></period-start> 
       <period-end iso-date="2014-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">370064.60 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">370064.60  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P081023">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">370064.60  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P081023">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="2001" iso-date="2001-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2001-12-31" />  <period-end iso-date="2012-12-31" />
<target value="110.00">


																	</target>

																	<actual value="69.81">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="2001" iso-date="2001-12-31" value="0"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2001-12-31" />  <period-end iso-date="2012-12-31" />
<target value="110.000">


																	</target>

																	<actual value="69.813">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:03"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P084860</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>ID-PCF-Indocement Cement</narrative>
       </title>
       <description type="1">
       <narrative>The purpose of the project is to reduce CO2 emissions by implementing technologies and using fuel types that are not applied at present in the Indonesian cement sector. Reduction of CO2 emission will be achieved by using additive materials to produce cement and substituting alternative fuels for fossil fuels in clinker production process.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF054005" type="40" role="4" >
       <narrative>Spanish Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF521003" type="10" role="1" >
       <narrative>Spain - Ministry of Economy, Industry and Competitiveness </narrative>
       </participating-org><participating-org ref="TF521012" type="70" role="1" >
       <narrative>Gas Natural Sdg, S.A. </narrative>
       </participating-org><participating-org ref="TF521019" type="70" role="1" >
       <narrative>Zero Emission Carbon Trust S.A </narrative>
       </participating-org><participating-org ref="TF521020" type="70" role="1" >
       <narrative>Comercial de Materiales deConstruccion S.L </narrative>
       </participating-org><participating-org ref="TF521021" type="70" role="1" >
       <narrative>Endesa Generacion S.A </narrative>
       </participating-org><participating-org ref="TF521022" type="70" role="1" >
       <narrative>Viesgo Generacion, S.L </narrative>
       </participating-org><participating-org ref="TF521023" type="70" role="1" >
       <narrative>Hidroelectricia del Cantabrico S.A. </narrative>
       </participating-org><participating-org ref="TF521024" type="70" role="1" >
       <narrative>Iberdrola Generacion, S.A.V. </narrative>
       </participating-org><participating-org ref="TF521025" type="70" role="1" >
       <narrative>Union Fenosa Generacion, S.A. </narrative>
       </participating-org><participating-org ref="TF521031" type="70" role="1" >
       <narrative>Azuliber 1, S.L </narrative>
       </participating-org><participating-org ref="TF521032" type="70" role="1" >
       <narrative>Cementos Portland Valderrivas SA </narrative>
       </participating-org><participating-org ref="TF521033" type="70" role="1" >
       <narrative>Repsol S.A. </narrative>
       </participating-org><participating-org ref="TF521034" type="70" role="1" >
       <narrative>Compania Espanola de Petroleos SA </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF625009" type="40" role="1" >
       <narrative>Spanish Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2005-12-23"></activity-date><activity-date type="2"  iso-date= "2005-12-23"></activity-date><activity-date type="3"  iso-date= "2017-08-31"></activity-date><activity-date type="4"  iso-date= "2017-10-11"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr William Nicholas Bowden</narrative>
       </person-name>
       <job-title>
       <narrative>Carbon Finance Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="ID">     <narrative>INDONESIA</narrative>
       </recipient-country> <sector code="23020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23030"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2005-12-23"></period-start> 
       <period-end iso-date="2017-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">10860246.06 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10842252.70  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P084860">
       <narrative>INDONESIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">17993.36  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF054005">
       <narrative>Spanish Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P084860">
       <narrative>INDONESIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">10860454.71  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P084860">
       <narrative>INDONESIA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF054005" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reducitons from introdcution of alternative fuels
</narrative></title> 
<baseline year="2006" iso-date="2006-09-29" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-09-29" />  <period-end iso-date="2011-12-31" />
<target value="211933.00">


																	</target>

																	<actual value="80967.00">

																	<comment><narrative>

																		Total value certified and issued to date.  To be revised upward after next verification to be completed in FY12.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Emission Reductions from Blended Cemement
</narrative></title> 
<baseline year="2006" iso-date="2006-10-27" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-10-27" />  <period-end iso-date="2011-12-31" />
<target value="452776.00">


																	</target>

																	<actual value="93973.00">

																	<comment><narrative>

																		First issuance took place in July 2011.  Second issuance for 239,103 expected by end of FY12.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:05"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P087153</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>CN-PCF Xiaogushan Hydropower  Project</narrative>
       </title>
       <description type="1">
       <narrative>The proposed PCF XHP (the PCF project) is to create and trade GHG ER credits certified under the CDM by reducing GHG emissions through substitution of electricity generation by coal-fired thermal power units with renewable hydropower generation.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2005-08-30"></activity-date><activity-date type="2"  iso-date= "2005-08-30"></activity-date><activity-date type="3"  iso-date= "2018-06-30"></activity-date><activity-date type="4"  iso-date= "2014-06-26"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Xiaoyu Chang</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>xchang@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="CN">     <narrative>CHINA</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2005-08-30"></period-start> 
       <period-end iso-date="2018-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">11172210.90 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11172210.90  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087153">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">11172210.90  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087153">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
(a) annual renewable energyoutputs;
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-06-22" />  <period-end iso-date="2012-12-31" />
<target value="370000.00">


																	</target>

																	<actual value="548993.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
(b) annual replacement of coal-fired power generation;
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-06-22" />  <period-end iso-date="2012-12-31" />
<target value="370000.00">


																	</target>

																	<actual value="45899300.00">


																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Custo Gigawatt-hour (GWh)
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-06-22" />  <period-end iso-date="2015-12-31" />
<target value="0.00">


																	</target>

																	<actual value="0.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
(c) ER credits certified and traded annually.
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-06-22" />  <period-end iso-date="2015-12-31" />
<target value="3000000.00">


																	</target>

																	<actual value="2123860.00">


																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:08"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P087291</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>CN-PCF Jincheng Coal Bed Methane Project</narrative>
       </title>
       <description type="1">
       <narrative>Create and trade Greenhouse gas (GHG) emission reduction credits under the clean development mechanism (CDM) through reducing greenhouse gas emissions by capturing of coal mine methane (CMM) for power generation and replacing grid electricity generated by coal-fired power plants.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF050398" type="40" role="4" >
       <narrative>IBRD/Netherlands Clean Development Mechanism (CDM) Facility - Euro Trust Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510004" type="10" role="1" >
       <narrative>Netherlands - Ministry of Infrastructure and the Environment </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF625011" type="40" role="1" >
       <narrative>Netherlands Clean Developement Mechanism </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2004-12-01"></activity-date><activity-date type="2"  iso-date= "2004-12-01"></activity-date><activity-date type="3"  iso-date= "2014-08-31"></activity-date><activity-date type="4"  iso-date= "2013-11-21"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Xiaoyu Chang</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>xchang@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="CN">     <narrative>CHINA</narrative>
       </recipient-country> <sector code="23020"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Power generation/non-renewable sources]]+</narrative>
       </sector> <sector code="23040"  vocabulary="1" percentage="50.00">
       <narrative>+![cdata[Electrical transmission/ distribution]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2004-12-01"></period-start> 
       <period-end iso-date="2014-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">47742941.20 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">20739583.80  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF050398">
       <narrative>IBRD/Netherlands Clean Development Mechanism (CDM) Facility - Euro Trust Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087291">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">27003357.40  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087291">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">46874619.25  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087291">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF050398" type="1"></related-activity><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Electricity sales to the grid
</narrative></title> 
<baseline year="2006" iso-date="2006-12-31" value="100.00"><comment>
					<narrative>electricity sales to the grid from the existing 15MW power plant.</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-12-31" />  <period-end iso-date="2012-12-31" />
<target value="970.00">

																	<comment><narrative> 

																	annual target has been met.
	</narrative></comment> 

																	</target>

																	<actual value="970.70">

																	<comment><narrative>

																		total electricity sales to the power grid in 2012.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Accumlated issued CERs, verified by DOE and approved by UNFCCC
</narrative></title> 
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-12-31" />  <period-end iso-date="2012-12-31" />
<target value="5224247.00">

																	<comment><narrative> 

																	CERs are expected to be generated and issued by UNFCCC for the operations from 2010 to 2013.
	</narrative></comment> 

																	</target>

																	<actual value="11354178.00">

																	<comment><narrative>

																		The CERs covered an operation period from 2009 to end September 2012.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Volume of methane captured annually
</narrative></title> 
<baseline year="2006" iso-date="2006-12-31" value="42000000.00"><comment>
					<narrative>annual CMM captured by the existing 15MW power plant</narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-12-31" />  <period-end iso-date="2012-12-31" />
<target value="269000000.00">

																	<comment><narrative> 

																	annual target has been met.
	</narrative></comment> 

																	</target>

																	<actual value="269700000.00">

																	<comment><narrative>

																		actual CMM consumed in 2012.
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:10"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P087292</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>CN-CF-Inner Mongolia Huitengxile Wind F</narrative>
       </title>
       <description type="1">
       <narrative>The proposed project development objective is to demonstrate early success in large-scale, renewable energy development with participating local developers in one pilot autonomous region and one pilot province  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2006-10-27"></activity-date><activity-date type="2"  iso-date= "2006-10-27"></activity-date><activity-date type="3"  iso-date= "2018-08-31"></activity-date><activity-date type="4"  iso-date= "2018-08-30"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr Xiaoyu Chang</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>xchang@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="CN">     <narrative>CHINA</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2006-10-27"></period-start> 
       <period-end iso-date="2018-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">7897108.10 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4733.30  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087292">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7892374.80  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087292">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7892374.80  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087292">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">4733.30  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087292">
       <narrative>CHINA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="44000-P087292" type="4"></related-activity><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Early success of scale of renewable energy development
</narrative></title> 
<baseline year="2005" iso-date="2005-12-31" value="1.26"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2005-12-31" />  <period-end iso-date="2010-12-31" />
<target value="11.90">


																	</target>

																	<actual value="41.00">

																	<comment><narrative>

																		surpassed the target (this stands for the the wind power development in China as a whole)
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
electricity generation
</narrative></title> 
<baseline year="2006" iso-date="2006-04-26" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2006-04-26" />  <period-end iso-date="2013-12-31" />
<target value="140.00">


																	</target>

																	<actual value="194.00">

																	<comment><narrative>

																		over the reduced target based on the performance record from November 2012 to October, 2013
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:13"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P087464</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Philippines Northwind Bangui Bay Project</narrative>
       </title>
       <description type="1">
       <narrative>This Project will contribute to the country’s development objectives of sustainable economic development through the enhancement ofboth quantity and reliability of power supply in an environmentally sustainable manner. The Project will also contribute towards the global environment objective of reducing greenhouse gas emissions through the avoidance of thermal power generation.  </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2004-12-09"></activity-date><activity-date type="2"  iso-date= "2004-12-09"></activity-date><activity-date type="3"  iso-date= "2017-08-31"></activity-date><activity-date type="4"  iso-date= "2017-10-11"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr William Nicholas Bowden</narrative>
       </person-name>
       <job-title>
       <narrative>Carbon Finance Specialist</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="PH">     <narrative>PHILIPPINES</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2004-12-09"></period-start> 
       <period-end iso-date="2017-08-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">1265916.34 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1265916.34  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087464">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">1265916.34  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087464">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">2358.30  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087464">
       <narrative>PHILIPPINES</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Certified Emission Reductions (CER) for the period 9/01/06 - 8/25/07
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="36,761 CER">

																	<comment><narrative>

																		*Actual (Previous): 27,807 CER*Actual (Previous) Cumulative: 35,600 CER* Actual (Current) Cumulative: 64,568 CER
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Certified Emission Reduction (CER) for period 8/26/07-8/25/08
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="40,800 CER">

																	<comment><narrative>

																		*Actual (Previous): 36,761 CER*Actual (Previous) Cumulative: 64,568 CER*Actual (Current) Cumulative: 105,368 CER
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Certified Emission Reductions (CER) for the period 5/01/05-8/31/06
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="27,807 CER">

																	<comment><narrative>

																		*Actual (Previous): 0*Actual (Previous) Cumulative: 0* Actual (Current) Cumulative:  27,807 CER
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Certified Emission Reductions (CER) for the period 8/26/08-3/25/10
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="1900-01-01" /> <period-end iso-date="1900-01-01"/>
<target value="">


																	</target>

																	<actual value="68,221 CER">

																	<comment><narrative>

																		* Actual (Previous): 40,800 CER*Actual  (Previous) Cumulative: 105,368 CER*Actual (Current) Cumulative: 173,589 CER
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Renewable energy capacity installed
</narrative></title> 
<baseline year="2004" iso-date="2004-12-09" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2004-12-09" /> <period-end iso-date="1900-01-01"/>
<target value="0.00">


																	</target>

																	<actual value="33.00">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="1" ascending="1">

															<title><narrative>
Quality of electricity generation
</narrative></title> 
<baseline year="2004" iso-date="2004-12-09" value="0.00"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2004-12-09" />  <period-end iso-date="2011-05-01" />
<target value="72.00">

																	<comment><narrative> 

																	72 GWh/year average
	</narrative></comment> 

																	</target>

																	<actual value="60.00">

																	<comment><narrative>

																		actual is 60-70 GWh/year average
</narrative></comment>

																	</actual>

																	</period>
</indicator>
</result></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:15"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P087979</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>Guatemala, El Canada 43MW Hydroelectric Project</narrative>
       </title>
       <description type="1">
       <narrative> </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2003-08-12"></activity-date><activity-date type="2"  iso-date= "2003-08-12"></activity-date><activity-date type="3"  iso-date= "2024-10-31"></activity-date><activity-date type="4"  iso-date= "2021-03-12"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Ms Claudia Croce</narrative>
       </person-name>
       <job-title>
       <narrative></narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email>ccroce@worldbank.org</email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="GT">     <narrative>GUATEMALA</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2003-08-12"></period-start> 
       <period-end iso-date="2024-10-31"> </period-end>
       <value currency="USD" value-date="2026-03-31">7627054.30 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">33644.90  </value>
		   <description>
       <narrative>Allocation to Bank executed activities - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7715506.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2021-03-31"></transaction-date>
       <value currency="USD" value-date="2026-03-31">-122096.60  </value>
		   <description>
       <narrative>Incoming Commitment ( Grant Allocated Amount cancellation/Adjustments ) -  for March , 2021</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7593409.40  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="4"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">33644.90  </value>
		   <description>
       <narrative>Cumulative Expenditures to Bank executed activities - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P087979">
       <narrative>GUATEMALA</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity></iati-activity><iati-activity last-updated-datetime="2026-10-15T19:02:18"
	   xml:lang="EN" default-currency="USD" hierarchy="02">
       <iati-identifier>XI-IATI-WBTF-P091407</iati-identifier>
       <reporting-org ref="XI-IATI-WBTF"  type="40">
       <narrative>World Bank Trust Funds</narrative>
       </reporting-org>
       <title>
       <narrative>BR Lages Woodwaste Cogeneration</narrative>
       </title>
       <description type="1">
       <narrative>The objective of the Project is to reduce emissions by generating energy from renewable sources by (i) substituting electricity produced by thermal plants with electricity from renewable sources, using wood waste from existing wood processing units and other wood residues from legal sources in the State of Santa Catarina, and (ii) avoiding methane emissions from wood waste piles, currently landfilled in most cases in an environmental harmful manner.  However this project only claims emission reduction credits from the avoidance of methane emissions from wood waste piles, and not from electricity generation through biomass. </narrative>
	   </description><participating-org ref="44000" type="40" role="1" >
       <narrative>International Bank for Reconstruction and Development </narrative>
       </participating-org><participating-org ref="FI-3" type="10" role="1" >
       <narrative>Finland - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF023446" type="40" role="4" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF504010" type="10" role="1" >
       <narrative>Swedish Energy Agency </narrative>
       </participating-org><participating-org ref="TF509001" type="10" role="1" >
       <narrative>Canada - Department of Foreign Affairs, Trade and Development </narrative>
       </participating-org><participating-org ref="TF510008" type="10" role="1" >
       <narrative>Netherlands - Ministry of Economic Affairs </narrative>
       </participating-org><participating-org ref="TF510024" type="70" role="1" >
       <narrative>Robeco Sustainable Private Equity C </narrative>
       </participating-org><participating-org ref="TF511001" type="10" role="1" >
       <narrative>Norway - Ministry of Foreign Affairs </narrative>
       </participating-org><participating-org ref="TF585001" type="70" role="1" >
       <narrative>BP International Ltd. </narrative>
       </participating-org><participating-org ref="TF625007" type="40" role="1" >
       <narrative>Prototype Carbon Fund </narrative>
       </participating-org><participating-org ref="TF654001" type="70" role="1" >
       <narrative>Mitsui &amp; Co., Ltd </narrative>
       </participating-org><participating-org ref="TF716009" type="10" role="1" >
       <narrative>Department of Environment (known as Environment Canada) </narrative>
       </participating-org><participating-org ref="TF718018" type="70" role="1" >
       <narrative>BP Alternative Energy International Limited </narrative>
       </participating-org><participating-org ref="TF757001" type="70" role="1" >
       <narrative>Gilde Strategic Situations </narrative>
       </participating-org><participating-org ref="TF758001" type="70" role="1" >
       <narrative>Fortum Oy </narrative>
       </participating-org><participating-org ref="TF810001" type="70" role="1" >
       <narrative>Electrabel N.V. </narrative>
       </participating-org><participating-org ref="TF810002" type="70" role="1" >
       <narrative>Mitsubishi Corporation </narrative>
       </participating-org><participating-org ref="TF810003" type="70" role="1" >
       <narrative>Chugoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810004" type="70" role="1" >
       <narrative>Kyushu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810005" type="70" role="1" >
       <narrative>Tokyo Electric Power Company Holdin Inc </narrative>
       </participating-org><participating-org ref="TF810006" type="70" role="1" >
       <narrative>Tohoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810007" type="70" role="1" >
       <narrative>Chubu Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810008" type="70" role="1" >
       <narrative>Shikoku Electric Power Company, Inc </narrative>
       </participating-org><participating-org ref="TF810009" type="70" role="1" >
       <narrative>RWE AG </narrative>
       </participating-org><participating-org ref="TF810010" type="70" role="1" >
       <narrative>Statoil ASA </narrative>
       </participating-org><participating-org ref="TF810011" type="70" role="1" >
       <narrative>Mit Carbon Fund Company Ltd. </narrative>
       </participating-org><participating-org ref="TF810012" type="70" role="1" >
       <narrative>Norsk Hydro Asa </narrative>
       </participating-org><participating-org ref="TF810013" type="70" role="1" >
       <narrative>Deutsche Bank Ag </narrative>
       </participating-org><participating-org ref="TF810014" type="70" role="1" >
       <narrative>GDF Suez </narrative>
       </participating-org><participating-org ref="XM-DAC-701-8" type="10" role="1" >
       <narrative>Japan International Cooperation Agency (JICA) </narrative>
       </participating-org> <activity-status code="3"></activity-status><activity-date type="1"  iso-date= "2009-05-19"></activity-date><activity-date type="2"  iso-date= "2009-05-19"></activity-date><activity-date type="3"  iso-date= "2014-06-30"></activity-date><activity-date type="4"  iso-date= "2014-08-04"></activity-date> <contact-info type="2">
       <organisation>
       <narrative></narrative>
       </organisation>
       <department>
       <narrative></narrative>
       </department>
       <person-name>
       <narrative>Mr David Reinstein</narrative>
       </person-name>
       <job-title>
       <narrative>Short Term Consultant</narrative>
       </job-title>
       <telephone>1202-458-7916</telephone>
       <email></email>
       <mailing-address>
       <narrative>1818 H St, NW, Washington DC - 22036</narrative>
       </mailing-address>
       </contact-info><activity-scope code="4"></activity-scope>  <recipient-country code="BR">     <narrative>BRAZIL</narrative>
       </recipient-country> <sector code="23030"  vocabulary="1" percentage="100.00">
       <narrative>+![cdata[Power generation/renewable sources]]+</narrative>
       </sector><collaboration-type code="2"></collaboration-type>
       <default-aid-type code="C01"></default-aid-type>
       <default-tied-status code="5"></default-tied-status><budget type="1">
       <period-start iso-date="2009-05-19"></period-start> 
       <period-end iso-date="2014-06-30"> </period-end>
       <value currency="USD" value-date="2026-03-31">7450000.00 </value>
       </budget><transaction>
	  <transaction-type code="11"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7450000.00  </value>
		   <description>
       <narrative>Incoming Commitment (Total Grant Allocated Amount) - as of June 30th, 2020</narrative> 
       </description> 
	    <provider-org provider-activity-id="XI-IATI-WBTF-TF023446">
       <narrative>Prototype Carbon Fund</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="P091407">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><transaction>
	  <transaction-type code="3"></transaction-type>
       <transaction-date iso-date="2020-06-30"></transaction-date>
       <value currency="USD" value-date="2026-03-31">7450000.00  </value>
		   <description>
       <narrative>Disbursement(Total Recipient-Executed Trust Funds Disbursements ) - as of June 30th, 2020</narrative> 
       </description>
	    <provider-org provider-activity-id="XI-IATI-WBTF">
       <narrative>World Bank Trust Funds</narrative>
       </provider-org>
       <receiver-org receiver-activity-id="XI-IATI-WBTF-P091407">
       <narrative>BRAZIL</narrative>
       </receiver-org>
       <finance-type code="110"></finance-type>
       </transaction><related-activity ref="XI-IATI-WBTF-TF023446" type="1"></related-activity><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-01-18" />  <period-end iso-date="2013-12-31" />
<target value="750.000">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
 PDO Indicator 
</narrative></title>

								<indicator measure="5" ascending="1">

															<title><narrative>
Emission Reductions
</narrative></title> 
<baseline year="1900" value="000000"><comment>
					<narrative></narrative></comment></baseline>

																	<period>
																	<period-start iso-date="2007-01-18" />  <period-end iso-date="2013-12-31" />
<target value="750.000">


																	</target>

																	<actual value="">


																	</actual>

																	</period>
</indicator>